newsfilter
← Latest News
ACCESS Newswire·

Aztec Drilling Intersects Broad, High-Grade Gold-Silver Mineralized Zones at the Tombstone Project, Arizona; Including 1.39 gpt Gold and 56.40 gpt Silver (2.196 gpt AuEq) over 96.04 m

5 holes drilled under the north-central Contention pit confirm and expand the high grade, near surface, oxidized gold-silver mineralization 20-hole program continues to expand the width and length of mineralization at north and central portions of the