newsfilter
← Latest News
ACCESS Newswire·

Aztec Receives Initial 2021 RC Drill Results from Tombstone Project, Arizona; Intersects Broad and High-Grade Gold-Silver Mineralized Zones; Including 5.71 gpt Gold and 40.5 gpt Silver (6.282 gpt AuEq) over 32.01 m

5 holes drilled along the north-central Contention pit confirm and expand the near surface, oxidized gold-silver mineralization 20 hole program continues to target gold and silver mineralization at north and central portions of the Contention Pit VAN