newsfilter
← Latest News
ACCESS Newswire·

Aztec Reports Final Phase 2 RC Drill Results from Tombstone Project, Arizona; Including 2.44 gpt Gold and 66.56 gpt Silver (3.39 gpt AuEq) over 65.5 m with 16.80 gpt gold and 374.36 gpt silver (22.15 gpt AuEq) over 7.6 m

5 more holes drilled under the north and north-central Contention pit confirm and expand the high grade, near surface, oxidized gold-silver mineralization 23-hole program final results continue to expand the width and length of mineralization below the