newsfilter
← Latest News
PR Newswire·

California American Water Invests $1.68 Million in Isleton Water System

  • California American Water is investing approximately $1.68 million to rehabilitate the Isleton 3B Well.
  • The project aims to strengthen local water system reliability, extend infrastructure life, & reduce risks of unexpected failures.
  • Work includes inspecting the well, removing & reinstalling pumping equipment, cleaning, treating, disinfecting, & conducting performance testing.
  • Construction is scheduled to continue through the end of 2026 at the well site along 5th street.
  • Residents near the site may experience increased activity, occasional noise, & temporary traffic impacts.
  • This initiative is part of the Northern Division Well Rehabilitation Program designed to maintain system capacity through periodic maintenance.