newsfilter
← Latest News
ACCESS Newswire·

Cerrado Gold Confirms over 250 Metres of Mineralized Strike at Gogó Da Onça Exploration Target at Its Monte Do Carmo Project, Brazil

Assay results to date have defined a strike length of over 250m of shallow mineralization at Gogó da Onça ("Gogó") Notable results include: FGO-004: 25.1m @ 3.38 g/t Au from 56.5m; FGO-005: 2.7m @ 12.74 g/t Au from 57.9m: FGO-008: 12.5m @ 3.39