newsfilter
← Latest News
GlobeNewswire·

Drilling at Dome Continues to Confirm Large-Scale, Open-Pit Potential; New, High-Grade Intersections Extend Mineralization 600 Metres to South

Drilling on south side of resource pit extends mineralization by 600 metres 3.41 gpt over 17.3m; 1.42 gpt over 17.0m;1.71 gpt over 19.1m, 11.41 gpt over 1.7m and 1.15 gpt over 12.9m;3.56 gpt over 21.0m and, 2.29 gpt