newsfilter
← Latest News
GlobeNewswire·

Entrée Resources Provides JV Licenses Update and Drill and Regional Exploration Results

  • Entrée Resources Ltd. delivered a non-binding proposal to Mongolia's Minister of Industry & Mineral Resources on March 25, 2026, to transfer the Shivee Tolgoi & Javkhlant mining licenses to OT LLC in exchange for a negotiated royalty on gross sales value instead of state equity.
  • Following the resignation of Prime Minister Zandanshatar, N. Uchral was sworn in as the 35th Prime Minister of Mongolia on March 31, 2026, & reappointed G. Damdinnyam as Minister of Industry & Mineral Resources on April 3, 2026.
  • The transfer of JV licenses is required to enable Lift 1 Panel 1 underground development work on the Shivee Tolgoi license area.
  • Analytical results were provided for one surface & four underground diamond drill holes from the 2024 & 2025 infill programs at the Hugo North Extension (HNE) deposit.
  • Significant HNE underground drill hole UGD951 returned 124 metres grading 3.41% copper equivalent, including a 62-metre interval of 4.36% copper equivalent.
  • Significant HNE underground drill hole UGD952A returned 42.4 metres grading 1.32% copper equivalent.
  • Regional exploration at the Ulaan Khud target included two drill holes: EGD198 returned 308 metres grading 0.29% copper & 107 ppm molybdenum, & EGD199 returned 420 metres grading 0.30% copper & 139 ppm molybdenum.
  • Drill holes at the Eagle target (EGD200 & EGD201) returned low copper grades & anomalous molybdenum, leading OT LLC to conclude no further exploration is recommended for this target.
  • Two drill holes at the Railway target returned no significant mineralization, with OT LLC concluding no depth potential exists for the southern part of the target.
  • Two drill holes at the MT11 target returned no significant mineralization, with OT LLC recommending further exploration targeting deeper mineralization below 1,500 to 2,000 metres.
  • Gravity surveys over Shivee Tolgoi & Javkhlant licences revealed positive Bouger anomalies suggesting shallow dense subsurface features or sulfide-rich zones potentially linked to the Oyu Tolgoi porphyry system.
  • CSAMT surveys outlined low resistivity zones coinciding with the Heruga deposit & identified a new low-resistivity target between Heruga & MT11 for potential future evaluation.
  • Geological 3D modelling is underway on both licences to refine targeting, with results expected in Q2 2026.
  • OT LLC completed the drilling work & bears expenditures in proportion to participating interests in the Entrée/Oyu Tolgoi Joint Venture.
  • Analytical results for three surface & four underground HNE drill holes from the 2024 program & 19 underground drill holes from the 2025 program remain pending.