newsfilter
← Latest News
FCC Press Releases·

FCC Aims to Auction 25 Megahertz of Prime, Mid-Band Spectrum

Federal Communications Commission FCC 26-70 Before the Federal Communications Commission Washington, D.C. 20554 In the Matter of Auctioning the 1675-1695 MHz and 2020-2025 MHz Bands Unleashing Licensed Spectrum for Direct-to-Device Allocation and Service Rules for the 1675-1680 MHz Band) ) ) ) ) ) ) ) ) ) WT Docket No. 26-284 GN Docket No. 26-281 WT Docket No. 19-116 FURTHER NOTICE OF PROPOSED RULEMAKING Adopted: October 29, 2026 Released: October 30, 2026 Comment Date: 60 days after date of publication in the Federal Register Reply Comment Date: 90 days after date of publication in the Federal Register By the Commission:  Chairman Carr and Commissioners Gomez and Trusty issuing separate statements. TABLE OF CONTENTS Heading Paragraph # I. INTRODUCTION 1 II. BACKGROUND 6 A. One Big Beautiful Bill Act 6 B. Commission Efforts to Modernize and Expand the D2D Spectrum Pipeline 7 C. 1675-1695 MHz Band 11 1. 1675-1680 MHz Band 14 2. 1680-1695 MHz Band 19 D. 2020-2025 MHz Band 21 E. Industry Views Regarding the Use of the 1675-1695 MHz and 2020-2025 MHz Bands 23 III. DISCUSSION 29 A. Allocation 30 1. 1675-1695 MHz Band 30 2. 2020-2025 MHz Band 35 B. Licensing and Operational Rules 37 1. Flexible Use Under Part 27 37 2. Eligibility 39 3. Mobile Spectrum Holdings Policies 41 4. Band Plan 43 5. License Term 56 6. Performance Requirements 57 a. Traditional Terrestrial Operations 57 b. D2D Operations 68 C. Competitive Bidding Procedures 69 D. Technical Rules 83 1. Power Limits 85 2. Out of Band Emissions 88 3. Antenna Height 93 4. Power Limits at Market Boundary 94 5. Uplink/Downlink 95 6. Other Technical Issues 96 E. Coordination and Protection of Incumbent and Adjacent Operations 98 1. 1675-1680 MHz 98 a. Coordination Process 101 b. Guard Bands 106 c. Alternative Data Distribution System 109 2. 1680-1695 MHz 114 a. Coordination Mechanism 115 b. Guard Bands 120 3. 2020-2025 MHz 125 F. Canada/Mexico Coordination 128 IV. PROCEDURAL MATTERS 129 V. ORDERING CLAUSES 137 APPENDIX A: PROPOSED RULES APPENDIX B: INITIAL REGULATORY FLEXIBILITY ANALYSIS APPENDIX C: REGULATORY IMPACT ANALYSIS I. INTRODUCTION 1. Today’s proposal to auction 25 megahertz of prime spectrum in the 1675-1695 MHz and 2020-2025 MHz bands for advanced communications services stands at the confluence of two powerful currents shaping the Commission’s spectrum management efforts. First, we continue to charge forward under the One Big Beautiful Bill Act’s (OBBB Act) restoration of our authority to conduct spectrum auctions, which for decades have created tremendous economic value for the American people from the use of our nation’s spectrum resources. We also build on our recent completion of an auction of AWS-3 inventory spectrum and adoption of service rules for 160 megahertz of Upper C-band spectrum to be auctioned by July 2027. Today’s action also is part of a broader Administration initiative to make up to 400 megahertz of spectrum available for commercial use through auction by 2028, including spectrum in the 2.7 GHz and 7 GHz bands, to form a surging spectrum pipeline to satisfy massive demand for spectrum-based services. 2. At the same time, as we move towards making available 25 megahertz of near greenfield spectrum in the 1-3 GHz range for flexible commercial use, we must recognize the powerful direct-to-device (D2D) currents shaping the ecosystem. In recent years, D2D technology has experienced a surge of investment and innovation, leading to increased demand for D2D spectrum and the growing potential for intermodal convergence. Analysts project that there will be more than $100 billion in revenues across all D2D and Internet of Things (IoT) segments by 2034 and note that by 2028, D2D broadband capabilities will mark a major inflection point. Novaspace, Direct-to-Device Connectivity: A $100 Billion Market Transformation (Dec. 18, 2025), https://nova.space/press-release/direct-to-device-connectivity-a-100-billion-market-transformation/. The growing demand for D2D is apparent in the number of recent transactions in the D2D space, totaling over $40 billion. See Applications of Spectrum Business Trust 2025-1, Space Exploration Technologies Corp., and EchoStar Corporation for Consent to Assign Spectrum and Earth Station Licenses, GN Docket No. 25-302, Memorandum Opinion and Order, DA 26-471 (WTB & SB May 12, 2026) (regarding SpaceX’s $19.6 billion acquisition of 65 megahertz of spectrum from EchoStar for D2D); Ligado Networks Subsidiary LLC, Debtor-in-Possession, ICFS File No.: SAT-MOD-20251206-00374 (filed Dec. 8, 2025) (regarding AST’s $550 million agreement to use Ligado’s L-band for D2D); Amazon, Amazon to Acquire Globalstar and Expand Amazon Leo Satellite Network (Apr. 14, 2026), https://www.aboutamazon.com/news/company-news/amazon-globalstar-apple (regarding Amazon’s deal to acquire Globalstar, including its D2D spectrum portfolio); Globalstar, Amazon to Acquire Globalstar and Expand Amazon Leo Satellite Network (Apr. 14, 2026), https://investors.globalstar.com/newsreleases/news-release-details/amazon-acquire-globalstar-and-expand-amazon-leo-satellite/ (same); Rocket Lab, Rocket Lab to Acquire Iridium in Historic Deal, Creating a Fully Vertically Integrated Space Powerhouse Primed for Growth (June 29, 2026), https://investors.rocketlabcorp.com/news-releases/news-release-details/rocket-lab-acquire-iridiumhistoric-deal-creating-fully (regarding Amazon’s deal to acquire Globalstar, including its D2D spectrum portfolio). 3. The expansion of D2D service, combined with the continued advancements and strength of terrestrial mobile wireless technology, promises the growth of wireless connectivity and competition for the benefit of the American public and supports U.S. leadership globally by laying the regulatory foundation for delivering the seamless, ubiquitous connectivity envisioned for 6G. On the D2D side, the Commission has taken significant steps to foster this growth, beginning with the original Supplemental Coverage from Space (SCS) framework See generally Single Network Future: Supplemental Coverage from Space, Space Innovation, GN Docket No. 23-65, IB Docket 22-271, Report and Order and Further Notice of Proposed Rulemaking, 39 FCC Rcd 2622 (2024) (SCS Report and Order). that led to our granting of SCS authorizations for a number of D2D operators to use terrestrial spectrum to provide D2D connectivity, particularly in hard-to-reach areas. Space Exploration Holdings, LLC Request for Deployment and Operating Authority for the SpaceX Gen2 NGSO Satellite System, ICFS File Nos. SAT-LOA-20200526-00055 et al., Order and Authorization, 39 FCC Rcd 12550 (SB 2024) (SpaceX-T-Mobile SCS Authorization); Satellite Licensing Division and Satellite Programs and Policy Division Information Actions Taken, Report No. SAT-01916, Public Notice, DA No. 25-385, 1 (May 2, 2025); ICFS File No. SAT-MOD-20240108-00006 et al.; ULS File No. 0011316969 (Lynk-Docomo SCS Authorization); AST & Science, LLC et al., ICFS File Nos. SAT-LOA-20200413-00034 et al., SB Docket No. 25-201, Authorization and Order, DA 26-391 (SB/WTB/OET/PSHSB Apr. 21, 2026) (AST-Verizon-AT&T-FirstNet SCS Authorization). The recent SpaceX-EchoStar and Grain-T-Mobile transaction approvals by the Space Bureau (SB) and the Wireless Telecommunications Bureau (WTB) helped facilitate the use of dedicated spectrum for D2D service, while imposing stringent performance metrics to ensure D2D operators will fully utilize the spectrum to provide meaningful service to consumers. See generally Applications of Spectrum Business Trust 2025-1, Space Exploration Technologies Corp., and EchoStar Corporation for Consent to Assign Spectrum and Earth Station Licenses, GN Docket No. 25-302, Memorandum Opinion and Order, DA 26-471 (WTB/SB May 12, 2026) (SpaceX-EchoStar Order); Applications of T-Mobile USA, Inc. and Grain Management, LLC For Consent to Assign Licenses, WT Docket No. 25-178, Memorandum Opinion and Order, DA 26-653 (WTB July 1, 2026) (Grain-T-Mobile Order). In our recent Unlicensed D2D NPRM, we explore proposals that would unlock unlicensed spectrum bands for D2D. Unleashing Unlicensed Spectrum for Direct-to-Device, ET Docket No. 26-169, Notice of Proposed Rulemaking, FCC 26-51 (Aug. 7, 2026). And in today’s companion D2D Modernization NPRM, we propose a comprehensive update of the SCS and Mobile Satellite Service (MSS) rules to allow for flexible D2D use, which we anticipate will be applicable to the bands we propose to auction in this item. In the companion D2D Modernization NPRM, we propose to apply the revised SCS framework to 13 terrestrial Wireless Radio Service bands. Unleashing Licensed Spectrum for Direct-to-Device et al., GN Docket No. 26-281, Notice of Proposed Rulemaking, FCC 26-71 (2026) (D2D Modernization NPRM). 4. Against the backdrop of these merging currents—the power of auctions and the potency of the D2D evolution—this FNPRM represents an important step towards auctioning prime spectrum to facilitate the rapidly expanding convergence of mobile technology. By proposing to make the 1675-1695 MHz and 2020-2025 MHz bands available through auction for terrestrial commercial use with a secondary MSS allocation for SCS, we continue to facilitate maximum flexibility to ensure the best use of the spectrum—whether it is to further expand terrestrial mobile networks, D2D networks, or a hybrid of both. In doing so, we emphasize the importance of ensuring that the new spectrum we make available is used to the greatest extent to benefit the American people. In that regard, we seek comment on meaningful buildout requirements to ensure robust use of the spectrum. 5. In proposing service rules for licenses to be auctioned in the 1675-1695 MHz band, we fully recognize that the National Telecommunications and Information Administration (NTIA) is still actively studying the 1680-1695 MHz portion of the band, which the National Oceanic and Atmospheric Administration (NOAA) uses to transmit weather data to a wide scope of federal and private sector customers. WTB will seek comment on the study’s findings to refresh the record and inform our decisions in this proceeding. We are encouraged by NTIA’s identification earlier this year of the adjacent five megahertz at 1675-1680 MHz as ripe for auction, particularly given the similar nature of the NOAA operations in both band segments, and we will continue to work collaboratively with our federal partners on this transition. II. BACKGROUND A. One Big Beautiful Bill Act 6. On July 4, 2025, the One Big Beautiful Bill Act was signed into law. See Pub. L. No. 119-21, 139 Stat. 72 (2025). The public law does not have an official short title because it was stripped during the Senate amendment process, but it is commonly known as the “One Big Beautiful Bill Act.” As part of the OBBB Act, Congress reinstated the Commission’s general auction authority and instituted a series of measures to ensure a robust spectrum pipeline. See id. § 40002(b)-(d). More specifically, under the OBBB Act, the Commission must grant licenses for at least 300 megahertz of spectrum through systems of competitive bidding before its auction authority expires on September 30, 2034. See id. § 40002(b)(2); see also id. § 40002(b)(1) (providing that the Commission’s general auction authority will expire on September 30, 2034); 47 U.S.C. § 309(j)(11) (same). To further bolster the spectrum pipeline, the OBBB Act also requires the NTIA Administrator, in consultation with the Commission, to identify 500 megahertz of spectrum allocated for federal use in covered bands to be reallocated for “non-[f]ederal use, shared [f]ederal and non-[f]ederal use, or a combination thereof, for full-power commercial licensed use cases.” OBBB Act § 40002(c)(1); see also id. § 40002(a)(1) (defining “covered band” as “the band of frequencies between 1.3 gigahertz and 10.5 gigahertz”). In light of the OBBB Act’s directive, NTIA identified the 1675-1680 MHz band to be repurposed for commercial use, Letter from Arielle Roth, Assistant Secretary for Communications and Information, NTIA, to Brendan Carr, Chairman, FCC, WT Docket No. 19-116, at 1 (filed Mar. 2, 2026) (2026 NTIA Identification Letter). and we now seek to refresh our proposal to reallocate that band as well as propose to reallocate and make available for auction additional spectrum in the 1680-1695 MHz band, which NTIA is currently studying, See id. at 3; Allocation and Service Rules for the 1675-1680 MHz Band, WT Docket No. 19-116, Notice of Proposed Rulemaking, 34 FCC Rcd 3552 at 3558-71, paras. 12-53 (2019) (1675-1680 MHz NPRM). and the 2020-2025 MHz band, which does not have federal incumbents. B. Commission Efforts to Modernize and Expand the D2D Spectrum Pipeline 7. D2D services provide fast and ubiquitous connectivity directly to a smartphone or device from next-generation satellites, resulting in seamless, high-speed coverage across the country, including in rural and remote areas. See SpaceX-EchoStar Order at 2, 17, 18, paras. 2, 38, 41. Given the promise of D2D to expand services and choices for consumers, the Commission has taken several actions to foster a regulatory environment for the D2D market to grow and flourish while preserving the regulatory certainty necessary for long-term investment and innovation in D2D services. 8. SCS Report and Order and Actions to Further D2D Investment. In March 2024, the Commission adopted the Single Network Future: Supplemental Coverage from Space Report and Order (SCS Report and Order), establishing a first-of-its-kind framework to allow terrestrial wireless licensees to lease access to their spectrum rights to participating satellite operators. See generally SCS Report and Order, 39 FCC Rcd 2622. Since adoption of the order, we have granted 4 SCS authorizations SpaceX-T-Mobile SCS Authorization; Lynk-Docomo SCS Authorization; AST-Verizon-AT&T-FirstNet SCS Authorization; Space Exploration Holdings, LLC, For Authority to Launch and Operate the SpaceX NGSO MSS System, ICFS File Nos. SAT-LOA-20250916-00282 and SAT-AMD-20251125-00339, GN Docket No. 25-340, Authorization and Order, DA 26-1078 (SB/WTB Oct. 6, 2026) (SpaceX D2D Authorization). and taken several actions to spur the development of and investment in D2D. In April 2026, SB released a decision reaffirming existing licensees’ exclusive rights to use certain D2D spectrum bands by dismissing operators’ requests to enter those same bands. See Space Exploration Holdings LLC; Kepler Communications Inc.; Satelio IoT Services USA Inc.; AST & Science LLC; Space Bureau Opens New Docket to Explore EchoStar Corporation’s Use of 2 GHz MSS Spectrum; Petition for Rulemaking by Space Exploration Holdings, LLC Regarding the Revision of the Commission’s 1.6/2.4 GHz “Big LEO” NGSO MSS Sharing Plan, Petition for Rulemaking of Iridium Communications Inc. to Optimize Mobile Satellite Service in the 1.6 GHz Band, GN Docket No. 25-340 et al., Order, DA 26-398, at 2, paras. 2-3 (SB Apr. 23, 2026) (Space Bureau MSS Clarification Order). In 2026, WTB and SB approved two transactions that will further advance D2D services. In May 2026, the bureaus approved the sale of approximately 65 megahertz of spectrum from EchoStar to SpaceX, facilitating the deployment of this underused mid-band spectrum for SpaceX’s next-generation D2D network. SpaceX-EchoStar Order at 1-2, para. 1. In July 2026, WTB granted applications assigning certain 800 MHz licenses to Grain Management, LLC, which it may use for D2D operations. See Grain-T-Mobile Order at 1-2, 3, paras. 1-2, 7. 9. Direct-to-Device Modernization NPRM. In the companion NPRM, See generally D2D Modernization NPRM. we build on the Commission’s efforts and further enable D2D connectivity by proposing to provide additional spectrum and more flexibility for the provision of D2D services. Specifically, in the D2D Modernization NPRM, we propose to modernize and relax the Commission’s SCS framework, seek comment on making SCS available in 11 total terrestrial bands, and aim to harmonize the SCS and MSS rules to allow for more flexible terrestrial, satellite, and hybrid use. See id. at sections I, III.A.1. 10. Unleashing Unlicensed Spectrum for D2D NPRM. In August 2026, the Commission released an NPRM that explores new avenues to allow innovative unlicensed wireless devices to communicate directly with satellites and proposes use of certain frequencies available under part 15 of the Commission’s rules for communications between Earth and space, including D2D services. See Unleashing Unlicensed Spectrum for Direct-to-Device, ET Docket No. 26-169, Notice of Proposed Rulemaking, FCC 26-51 (Aug. 6, 2026). The NPRM considers proposals that would allow devices operating in more than 200 megahertz of spectrum available for unlicensed devices to communicate with satellites authorized to provide service in the United States. Id. at 2, para. 2. More specifically, it examines potential reforms to enable devices operating in some of the part 15 bands to communicate with FCC-authorized satellites, whether on an uplink or downlink basis, and proposes to clarify that using equipment authorized under the part 15 rules is permitted within FCC-authorized spacecraft. Id. C. 1675-1695 MHz Band 11. Current Allocation and Existing Uses. The 1675-1695 MHz band is allocated in the U.S. Table of Frequency Allocations (U.S. Table) on a co-primary basis to the Meteorological Aids (MetAids) and Meteorological-Satellite (space-to-Earth) (MetSat) services for both federal and non-federal use. See 47 CFR § 2.106(c)(88). The MetSat allocation is subject to footnote US88 in the U.S. Table, which identifies 14 protection zones for federal earth stations receiving the 1675-1695 MHz band. See id. § 2.106(c)(88), tbl. 6. Both the MetSat and MetAids services are subject to US211, which indicates that “applicants for airborne or space station assignments are urged to take all practicable steps to protect radio astronomy observations in the adjacent bands from harmful interference; however, US74 applies.” Id. § 2.106(c)(211). US74, in turn, provides that radio astronomy locations are “protected from unwanted emissions only to the extent that” the offending stations operate in violation of the relevant technical rules. Id. § 2.106(c)(74). US289, which provides that Earth exploration-satellite service applications may “be used for space-to-Earth transmissions subject to not causing harmful interference,” also applies to the 1675-1695 MHz band, but only to the 1690-1695 MHz band. Id. § 2.106(c)(289). Previously, NOAA operated federal radiosondes in the 1675-1683 MHz portion of the band, but it has largely relocated these operations to the 400.15-406 MHz band (403 MHz band). See System for Award Management, Radio Frequency Migration Project—MROS, https://sam.gov/workspace/contract/opp/dfbdc796e8e44520bc00586edf493937/view (last visited Oct. 5, 2026) (explaining that NOAA is planning to relocate radiosonde operations in the 1675-1683 MHz band to the 403 MHz band); see, e.g., National Weather Service, Service Change Notice 22-93, (Sept. 29, 2022), https://www.weather.gov/media/notification/pdf2/scn22-93_mros_sites_oct_2022.pdf (issuing notice for the transition of the Radiosonde Replacement System to the Manual Radiosonde Observation System in the 403 MHz band at two sites). The Commission has no service rules regarding non-federal radiosonde operations in the MetAids Service and has not issued any licenses for such operations in the 1675-1683 MHz portion of the band. 12. For existing federal MetSat services, NTIA has assigned several frequencies in different portions of the 1675-1695 MHz band to NOAA for Geostationary Operational Environmental Satellites (GOES) Series downlinks. Spectrum Pipeline Reallocation Engineering Study Follow-On, Task 3—Identifying Regulatory Constraints, NTIA Report 24-01 at 9 (2024) (depicting the frequencies used by NOAA for its GOES Series satellites), https://www.fcc.gov/ecfs/document/1022873781840/2 (NTIA SPRES-FO Report). In September 2023, NOAA transferred GOES-15, the last satellite in the GOES-N Series, to the Department of War’s (DOW) Space Force. U.S. Space Force, Space Force Accepts Second Weather Satellite Through NOAA Partnership, (Sept. 22, 2023), https://www.spaceforce.mil/News/Article-Display/Article/3534522/space-force-accepts-second-weather-satellite-through-noaa-partnership/. Space Force redesignated GOES-15 as EWS-G2 and uses this satellite as part of its Electro-Optical Infrared Weather System-Geostationary (EWS-G) mission to provide DOW with mission-critical weather data. Id. EWS-G2 operates on intermittent channels for downlink operations from 1673.4 MHz to 1694.8 MHz. See NTIA SPRES-FO Report at 9 (displaying the band plan for NOAA’s GOES-N Series satellites); World Meteorological Organization, Satellite: EWS-G2, https://space.oscar.wmo.int/satellites/view/ews_g2 (last visited Oct. 5, 2026). NOAA continues to operate this satellite on behalf of Space Force, and it is expected to be in service over the Indian Ocean until 2030. U.S. Space Force, Space Force Accepts Second Weather Satellite Through NOAA Partnership, (Sept. 22, 2023), https://www.spaceforce.mil/News/Article-Display/Article/3534522/space-force-accepts-second-weather-satellite-through-noaa-partnership/ 13. In December 2017, NOAA introduced its current generation satellite constellation, GOES-R, and there are currently two active GOES-R Series satellites. NOAA, Geostationary Operational Environmental Satellites (GOES)-R Series, https://www.ncei.noaa.gov/products/satellite/goes-r (last visited Oct. 5, 2026). GOES-18 became operational on January 4, 2023, and GOES-19 became operational on April 7, 2025. Id. GOES-16 and GOES-17 are both inactive and serve as in-orbit backup for the operational GOES-R Series satellites. See NOAA, GOES Instrument & Subsystem Performance Status, https://www.ospo.noaa.gov/operations/goes/status.html (last updated Sept. 3, 2026). These satellites operate on intermittent channels in the 1679.7-1694.7 MHz portion of the 1675-1695 MHz band and provide improved detection and observation of environmental phenomena. See NTIA SPRES-FO Report at 14-18. Services on the GOES-R Series satellites in this portion of the band include the Data Collection System (DCS), the GOES Rebroadcast (GRB), and the High Rate Information Transfer/Emergency Managers Weather Information Network (HRIT/EMWIN), and federal and non-federal users may obtain GOES-R Series satellite data from these services. Id.; see NOAA, NASA, User Systems: Overview, https://www.goes-r.gov/users/user-systems.html (last visited Oct. 5, 2026). For example, NOAA, DOW, the National Air and Space Administration (NASA), and other non-federal entities operate earth stations that receive environmental research and weather data transmitted from GOES in the 1675-1695 MHz band. See NOAA, Spectrum Pipeline Reallocation Engineering Study Follow-On (SPRES-FO) Final Report, Version 1.6 at 83-85 (2024), https://www.fcc.gov/ecfs/document/1122068936842/3 (SPRES-FO Report). These federal and non-federal entities receive and collect data through direct broadcast from the GOES constellation of satellites; for the GOES-R Series, the direct rebroadcast services are GRB and High Rate Information Transfer/Emergency Managers Weather Information Network. 1675-1680 MHz NPRM, 34 FCC Rcd at 3557, para. 9. NOAA anticipates that the GOES-R Series will continue to operate through 2036. NOAA, Geostationary Operational Environmental Satellites (GOES)-R Series, https://www.ncei.noaa.gov/products/satellite/goes-r (last visited Oct. 5, 2026). Following the retirement of the GOES-R Series system, NOAA will commence operation of its next-generation satellites, Geostationary Extended Observations (GeoXO). NASA, GeoXO, https://science.nasa.gov/mission/geoxo/ (last visited Oct. 5, 2026). There are four satellites planned for the GeoXO Series with the first launch scheduled for 2032. NOAA, GeoXO Spacecraft & Instruments, https://www.nesdis.noaa.gov/our-satellites/future-programs/geoxo/geoxo-spacecraft-instruments (last visited Oct. 5, 2026). While GeoXO will use a portion of the 1675-1695 MHz band for its operations, NOAA anticipates using significantly less spectrum due to the potential relocation of the DCS downlink frequency to 1691.9 MHz for the GeoXO system operations. See SPRES-FO Report at 95, 104. 1. 1675-1680 MHz Band 14. 2019 Notice of Proposed Rulemaking. As part of its continuing efforts to unleash more spectrum to spur the rollout of wireless networks and technologies, the Commission in May 2019 adopted the 1675-1680 MHz NPRM proposing rules to reallocate the 1675-1680 MHz portion of the band for shared use between incumbent federal operations and new, non-federal flexible wireless use operations. 1675-1680 MHz NPRM, 34 FCC Rcd at 3553, para. 1. More specifically, the Commission proposed to reallocate the 1675-1680 MHz band on a co-primary basis for terrestrial fixed and mobile (except aeronautical mobile) use on a shared basis with incumbent federal users and sought comment on appropriate service and technical rules for this band. Id. at 3558, para. 12. The Commission also sought comment on how to implement a sharing framework that would create opportunities for commercial operations in the band while protecting existing federal users. Id. Finally, the Commission sought comment on possible alternative methods of providing access to NOAA weather data to other non-federal users that currently receive such data through earth stations they operate in this band. Id. 15. Band Spectrum Sharing Reports. In September 2022, NTIA filed a NOAA report (SPRES Report) with the Commission addressing the potential for spectrum sharing between incumbent federal and new non-federal operations in the 1675-1680 MHz band. See Letter from Stacy M. Cheney, Acting Chief Counsel, NTIA, to Marlene H. Dortch, Secretary, FCC, WT Docket No. 19-116, at 1 (filed Sept. 6, 2022) (2022 NTIA Letter). In the SPRES Report, NOAA concluded that spectrum sharing is “potentially feasible” and that “for some systems and in some cases, there is a significant risk of harmful interference but that, with additional time, NOAA may be able to establish sufficient redundancy and alternative means of distributing key data to preserve its ability to carry out its critical missions.” Id.; NOAA, Spectrum Pipeline Reallocation 1675-1680 MHz Engineering Study (SPRES) Program Report at 404 (2022), https://www.fcc.gov/ecfs/document/10906163747708/1 (SPRES Report) (finding that “spectrum sharing in the 1675-1680 MHz band with commercial wireless carriers operating in the uplink mode is potentially feasible” but that “spectrum sharing in the 1675-1680 MHz band with commercial wireless carriers operating in the downlink mode is not viable;” emphasis in original). NTIA stated that it supports the SPRES Report and committed to helping NOAA with its work plan to continue studying this band. 2022 NTIA Letter at 1. 16. In November 2024, NTIA filed an additional NOAA report (SPRES-FO Report) that built on the 2022 SPRES Report. Letter from Anthony M. Patrone, Attorney Advisor, NTIA, to Marlene H. Dortch, Secretary, FCC, WT Docket No. 19-116, at 1 (filed Nov. 22, 2024) (2024 NTIA Letter). The SPRES-FO Report, which incorporated a technical analysis prepared by NTIA, provided findings on the cost of providing reasonable redundancy for NOAA’s DCS downlink sites and considered alternative DCS distribution technologies. Id. Regarding existing federal and new non-federal users sharing the 1675-1680 MHz band, NOAA concluded that spectrum sharing “is feasible” subject to several conditions, including protection of redundant federal receiver stations, implementation of an alternative data distribution system, and consideration of key DCS and GRB users in the spectrum-sharing process. SPRES-FO Report at 3. The SPRES-FO Report also included a software tool created by NTIA that wireless providers “can use to coordinate operations with DCS and other protected facilities” to “avoid causing harmful interference.” 2024 NTIA Letter at 1. NTIA concurred with NOAA’s findings and reaffirmed its support in its technical analysis to the SPRES-FO Report that detailed its recommendations for coordination in this band. Id.; see NTIA SPRES-FO Report at 10-46. 17. 2025 Refresh Public Notice. In light of the 2024 SPRES-FO Report, on January 8, 2025, the Wireless Telecommunications Bureau released a public notice seeking additional comment on the Commission’s proposal to reallocate the 1675-1680 MHz band. Wireless Telecommunications Bureau Seeks to Supplement the Record on Proposed Rules to Re-Allocate 1675-1680 MHz Band, WT Docket No. 19-116, Public Notice, 40 FCC Rcd 119, 119-20 (WTB 2025) (2025 Refresh PN). 18. 2026 NTIA Identification Letter. On March 2, 2026, NTIA filed a letter notifying the Commission of the identification “of the 1675-1680 MHz band as the first of 500 megahertz of spectrum required to be identified [by NTIA] for reallocation to non-[f]ederal use, shared [f]ederal and non-[f]ederal use, or a combination thereof under the [OBBB Act].” 2026 NTIA Identification Letter at 1. NTIA provided recommendations for incumbent federal operations and new, non-federal commercial wireless deployments to share this band, including protection for certain federal satellite downlink sites, coordination procedures, and suitable operations and emission limits. Id. at 2-3. Because of the evolving wireless marketplace and the 1675-1680 MHz band’s characteristics, NTIA noted that it is studying this band as a candidate to supply more spectrum for D2D satellite services. Id. at 1-2. 2. 1680-1695 MHz Band 19. When identifying the 1675-1680 MHz band as spectrum to be reallocated for non-federal use, NTIA also discussed the potential reallocation of an additional 15 megahertz in the adjacent 1680-1695 MHz band for commercial use. Id. at 3. Currently, the 1680-1695 MHz band is allocated as part of the larger 1675-1695 MHz band in the U.S. Table. See 47 CFR § 2.106. As described above, this band is allocated on a co-primary basis to the MetAids and MetSat services for both federal and non-federal use, and it is subject to footnote US88 in the U.S. Table. See supra para. 11. Like in the neighboring 1675-1680 MHz band, NOAA operates the GOES-R Series and EWS-G2 satellites in intermittent channels in this band, and the future GeoXO Series satellites may use frequency 1691.9 MHz for their operations. See supra paras. 12-13; SPRES-FO Report at 95, 104. 20. NTIA has stated that it is working with federal agencies to conduct a feasibility study to determine whether this spectrum can be repurposed for commercial wireless and D2D operations. 2026 NTIA Identification Letter at 3; see NTIA, Band Repurposing Studies, https://www.spectrum.gov/band-repurposing-studies (last visited Oct. 5, 2026) (highlighting repurposing studies for four spectrum bands, including the including the 1675-1695 MHz band, under the OBBB Act). NTIA also explained that it plans to inform the Commission if it finds that repurposing this spectrum is feasible and hopes to notify the Commission within the OBBB Act’s statutory deadline of July 4, 2027. 2026 NTIA Identification Letter at 3; see OBBB Act § 40002(c)(2) (“Not later than 2 years after the date of enactment of this Act, the Assistant Secretary shall identify not less than 200 megahertz of frequencies within the covered band [for reallocation to commercial use].”). Previously in 2026, the Commission notified NTIA that the FCC planned to auction some or all of the spectrum in three bands, including the 1675-1695 MHz band, during the current Administration. The Commission later memorialized that prior notification to NTIA in a letter dated September 11, 2026. Letter from Brendan Carr, Chairman, FCC, to Arielle Roth, Assistant Secretary for Communications & Information, NTIA, at 1 (Sept. 11, 2026). The Commission acknowledged the ongoing repurposing studies conducted by NTIA and relevant federal agencies and stated that “[a]ny future FCC rulemakings and subsequent auctions will be informed by the outcomes of and recommendations from these studies.” Id. at 1-2. D. 2020-2025 MHz Band 21. There are currently no regularly licensed operations in the 2020-2025 MHz band, which is allocated for non-federal fixed and mobile services only. 47 CFR § 2.106. Outside of the United States, the band is also allocated to MSS (Earth-to-space) in ITU Region 2, which contains the United States. Id. The band was briefly subject to service and licensing rules in 2000 as part of a broader contemplated MSS service, See The Establishment of Policies and Service Rules for the Mobile Satellite Service in the 2 GHz Band, IB Docket No. 99-81, Report and Order, 15 FCC Rcd 16127, 16138, para. 16 (2000). but those rules, and the MSS allocation, were removed in 2003, and no new service rules have subsequently been adopted. See Amendment of Part 2 of the Commission’s Rules to Allocate Spectrum Below 3 GHz for Mobile and Fixed Services to Support the Introduction of New Advanced Wireless Services, including Third Generation Wireless Systems et al., ET Docket No. 00-258 et al., Third Report and Order, Third Notice of Proposed Rulemaking and Second Memorandum Opinion and Order, 18 FCC Rcd 2223, 2238, para. 28 (2003) (AWS Third Report & Order). This delay in adopting new service rules was due in part to uncertainty about whether the adjacent 2000-2020 MHz AWS band would be used for terrestrial uplink or downlink. See Amendment of the Commission’s Rules with Regard to Commercial Operations in the 1695-1710 MHz, 1755-1780 MHz, and 2155-2180 MHz Bands, GN Docket No. 13-185, Report and Order, 29 FCC 4610, 4636, para. 59 (2014) (AWS-3 Report and Order). In 2016, DISH (now EchoStar) elected to use that band for downlink. See Letter from Jeffrey H. Blum, Senior Vice President & Deputy General Counsel, DISH, to Marlene H. Dortch, Secretary, FCC, WT Docket No. 13-225, at 1 (filed June 1, 2016). In 2025, SpaceX entered into a transaction to acquire that spectrum from EchoStar and, although it initially requested reversal of that election, See Spectrum Business Trust 2025-1, Space Exploration Technologies Corp., and EchoStar Corporation Seek FCC Consent to the Proposed Assignment of Certain Spectrum and Earth Station Licenses Held by EchoStar to SpaceX, GN Docket No. 25-302, Public Notice, 40 FCC Rcd 7826, 7827 (SB/WTB 2025) (citing ULS File Nos. 0011755472, 0011755474, and 0011755481 and File Number 50000ALAA25 filed in ECFS (filed Sept. 18, 2025); ICFS File Nos. SES-ASG-20250918-00146 and SES-ASG-20250918-00147 and Submission ID 1091941380832 filed in ECFS, Exhibit B, Waiver Requests at 5-6 (filed Sept. 18, 2025)). has indicated that it intends to use the license for downlink operations. See Revised Pleading Cycle Established for Applications of Space Exploration Technologies Corp., Spectrum Business Trust 2025-1, and EchoStar Corporation, as Amended, to Assign Certain Spectrum and Earth Station Licenses Held by EchoStar to SpaceX, GN Docket No. 25-302, Public Notice, 40 FCC Rcd 9184, 9186 (SB/WTB 2025) (citing Amended Applications of Spectrum Business Trust 2025-1, Space Exploration Technologies Corp., and EchoStar Corporation for Consent to Assign Spectrum and Earth Station Licenses, GN Docket No. 25-302, at 5-6 (filed Nov. 10, 2025)). 22. The adjacent band above 2025 MHz (2025-2110 MHz) is allocated on a primary basis for federal Space Operation (Earth-to-space) and (space-to-space), Earth Exploration Satellite Service (EESS) (Earth-to-space and space-to-space), Space Research (Earth-to-space and space-to-space), fixed, and mobile, and non-federal fixed and mobile, and on a secondary basis to non-federal Space Operation (Earth-to-space). See 47 CFR § 2.106. Federal operations include Earth-to-space transmissions to GOES satellites from specific locations, See 47 CFR § 2.106(c)(222) (footnote US222). military satellite control systems at specific sites, See 47 CFR § 2.106(c)(346) (footnote US346). and Space Launch operations. See 47 CFR § 2.106. Non-federal operations include the Television Broadcast Auxiliary Service (BARS), 47 CFR § 74.602(a). the Cable TV Relay Service (CARS) (mobile only), 47 CFR § 78.18(a)(6). the Local Television Transmission Service (LTTS), 47 CFR § 101.803(b). and Space Launch. 47 CFR § 26.2. Operations in BARS, CARS, and LTTS include mobile operations which may be intermittent in nature and variable in position, such as Electronic News Gathering on location or facilitation of video feeds from sporting events. E. Industry Views Regarding the Use of the 1675-1695 MHz and 2020-2025 MHz Bands 23. September 2026 Amazon Leo Letter. On September 1, 2026, Amazon Leo filed a letter encouraging the Commission to authorize operations in the 1675-1695 MHz and 2020-2025 MHz bands, particularly because it believes that this spectrum is underutilized. Letter from Michael J. Carlson, Senior Corporate Counsel, Kuiper Systems LLC, to Marlene H. Dortch, Secretary, FCC, WT Docket No. 19-116, at 1 (filed Sept. 1, 2026). Amazon Leo contends that these bands are “ripe for productive use” and highlights the Commission’s recent spectral actions driving momentum for D2D services. Id. at 1-2. Further, Amazon Leo emphasizes that “[g]rowth on this scale demands a steady supply of spectrum to sustain it,” reiterating that the 25 megahertz of the 1675-1695 MHz and 2020-2025 MHz bands represent prime spectrum that should be reallocated for this purpose. Id. at 2; see also Letter from Michael John Carlson, Senior Corporate Counsel, Kuiper Systems LLC, to Marlene H. Dortch, Secretary, FCC, WT Docket No. 26-284 et al., at 1 (filed Oct. 23, 2026) (“Amazon Leo also commends the Commission for its companion proposal to auction the 1675-1695 MHz and 2020-2025 MHz bands—prime spectrum well suited for D2D and ripe for productive use.”) 24. September 2026 SpaceX Letter. On September 3, 2026, SpaceX filed a letter advocating for the Commission to unlock the 1675-1680 MHz, 1680-1695 MHz, and 2020-2025 MHz bands for D2D operations to spur innovation to ensure ubiquitous connection to high-speed mobile broadband across the United States. Letter from Alison Minea, Satellite Policy Director, SpaceX, to Marlene H. Dortch, Secretary, FCC, WT Docket No. 19-116, at 1 (filed Sept. 3, 2026). SpaceX asserts that these bands “can travel farther and sustain mobile connections relatively better than higher-frequency waves” and that “they have sufficient bandwidth to support messaging, voice, and emerging data services.” Id. In addition to widespread connectivity, SpaceX anticipates that opening these bands will enhance competition, strengthen American leadership for next-generation satellite-terrestrial integration, and introduce a backup layer for instances when terrestrial infrastructure is unavailable. Id; see also Letter from Alison Minea, Satellite Policy Director, SpaceX, to Marlene H. Dortch, Secretary, FCC, WT Docket No. 26-284 et al., at 1 (filed Oct. 23, 2026) (encouraging the Commission to “enable terrestrial and satellite networks to blend seamlessly so that Americans remain connected wherever they are”). 25. September 2026 AST Letter. On September 9, 2026, AST & Science, LLC (AST SpaceMobile) filed a letter supporting an auction for the 1675-1680 MHz, 1680-1695 MHz, and 2020-2025 MHz bands for flexible use with the capability for D2D operations. Letter from Jennifer A. Manner, Senior Vice President, Regulatory Affairs and International Strategy, AST & Science, LLC, to Marlene H. Dortch, Secretary, FCC, WT Docket No. 19-116, at 1-2 (filed Sept. 9, 2026). AST SpaceMobile recognizes the persistent growth in the mobile industry and significant investment in D2D services and notes that these bands are uniquely suited to strengthen both terrestrial and D2D operations. Id. at 2. More specifically, AST SpaceMobile contends that “[t]hese frequencies can reach ordinary smartphones with compact antennas and complete uplinks at lower transmit power.” Id. 26. August 2026 SpaceX Letter. On August 10, 2026, SpaceX filed a letter in the 1675 MHz NPRM docket, advocating for a technology-agnostic approach for new flexible-use wireless services, including the 1675-1680 MHz band, that will facilitate use of spectrum for terrestrial, D2D, and IoT services. Letter from David Goldman, Vice President, Satellite Policy, Space Exploration Technologies Corp., to Marlene H. Dortch, Secretary, FCC, WT Docket No. 19-116 et al., at 1 (filed Aug. 10, 2026). In its letter, SpaceX encourages the Commission to “push industry to serve customers faster” in order to speed new mobile broadband services to market, including D2D services. See id. 27. Kepler and Spire Petition for Rulemaking. On October 30, 2020, Kepler and Spire filed a Petition for Rulemaking requesting that the Commission replace the existing fixed and mobile allocations in the 2020-2025 MHz band with an MSS (space-to-Earth) allocation in the 2020-2021 MHz band and an MSS (Earth-to-space) allocation in the 2021-2025 MHz band, and adopt licensing rules in part 25 to promote the deployment of smallsat operations. Petition of Kepler Communications, Inc. and Spire Global, Inc. Petition to Revise Sections 2.106 and 25.142 of the Commission’s Rules to Expand Spectrum Availability for Small Satellites by Adding Mobile-Satellite Service Allocation in the Frequency Band 2020-2025 MHz, RM-11869, at 1 (filed Oct. 30, 2020), https://www.fcc.gov/ecfs/document/103095759364/1 (Kepler Spire Petition). Kepler and Spire argue that the band “possess[es] limited usefulness for the terrestrial industry,” and could more usefully support the spectrum-constrained smallsat industry. Kepler Spire Petition at 13-14. CGB released a public notice seeking comment on this petition for rulemaking. Reference Information Center Petition for Rulemakings Filed, RM-11869, Public Notice, Report No. 3162 (CGB Nov. 6, 2022) We take no action on this petition in this proceeding and it remains pending. 28. Qualcomm Petition for Rulemaking. On February 20, 2026, Qualcomm Incorporated (Qualcomm) filed a Petition for Rulemaking (Petition) to amend the Commission’s rules to establish a new communications service known as “sidelink” within portions of the 1675-1695 MHz and 5350-5470 MHz bands. Petition for Rulemaking of Qualcomm Incorporated, WT Docket No. 19-116, at 1 (filed Feb. 20, 2026) (Qualcomm Petition). Sidelink is a technology that would allow for 5G device-to-device connectivity, and Qualcomm seeks to employ five megahertz in the 1675-1695 MHz band for this technology, highlighting its potential use “for robust in-building operations.” Id. at 1, 6-7. OET and WTB released a public notice seeking comment on this Petition. Office of Engineering and Technology and Wireless Telecommunications Bureau Seek Comment on Qualcomm’s Petition for Rulemaking to Allocate Spectrum and Establish Service Rules for a New Communications Service in Portions of the 1675-1695 MHz and 5350-5470 MHz Bands, WT Docket No. 19-116, RM-12020, Public Notice, DA 26-337, at 1-2 (OEA/WTB Apr. 7, 2026). In a separate order adopted today, OET and WTB deny in part Qualcomm’s Petition with respect to the 1675-1695 MHz band, while leaving the rest of the petition pending. Petition for Rulemaking of Qualcomm Incorporated, Allocation and Service Rules for the 1675-1680 MHz Band, WT Docket No. 19-116, RM-12020, Order, DA 26-1171 (OEA/WTB Oct. 29, 2026). We make no determination here as to sidelink generally as a technology or its potential public safety benefits. III. DISCUSSION 29. Through this rulemaking, we seek to establish rules and policies that, if adopted, will lead to the auction of 25 megahertz of near greenfield spectrum suitable for innovative communications services, encourage continued investment in next-generation wireless infrastructure and technologies, and ensure that consumers, businesses, and public institutions continue to have access to state-of-the-art wireless services, ranging from advanced terrestrial fixed and mobile wireless applications to space-based D2D communications. Specifically, in this FNPRM, we propose and seek comment on service rules that could enable the auctioning, licensing, and rapid development of the 1675-1695 MHz and 2020-2025 MHz bands, including the allocation, band plan, and performance criteria. We also propose technical rules and coordination requirements that, if adopted, could enable sharing and use of these bands by federal and non-federal stakeholders. We note that the proposals in this item are dependent on the outcome of NTIA’s study regarding the feasibility of sharing the 1675-1695 MHz band and the use of the band for D2D. Our ultimate posture will depend on the conclusions from the study, and WTB will seek comment on the study’s findings to refresh the record in this proceeding. A. Allocation 1. 1675-1695 MHz Band 30. We propose to reallocate the 1675-1680 MHz band on a co-primary basis to the fixed and mobile (except aeronautical mobile) services for non-federal use. See 47 CFR § 2.106(a). We also propose to similarly reallocate the 1680-1695 MHz band so that we can make 20 megahertz of contiguous spectrum available at auction. In the 1675-1680 MHz NPRM, the Commission proposed and sought comment on reallocating the 1675-1680 MHz band on a co-primary basis for non-federal fixed and mobile (except aeronautical mobile) services. 1675-1680 MHz NPRM, 34 FCC Rcd at 3558, para. 13. Additionally, the Commission did not propose any changes to the federal allocations in this band but rather proposed that any new, non-federal Fixed or Mobile (except aeronautical mobile) operations be required to protect incumbent (current and planned) federal operations from harmful interference, such that federal operations in the MetSat Service would remain primary in the 1675-1680 MHz band. Id. at 3559, para. 14. The Commission also sought comment on how to ensure that non-federal users that rely on the data transmitted in the band from the GOES-N and GOES-R Series satellites continue to have access to NOAA data. Id. Further, the Commission sought comment on whether to include the protections for federal operations in the Commission’s rules or as a footnote to the U.S. Table. Id. While some commenters have expressed concerns regarding the impact on incumbent operations and weather data users in the 1675-1680 MHz band, Carr Astronautics Corporation, Aviation Spectrum Resources, Inc. (ASRI), and International Air Transport Association (IATA) oppose reallocation due to concerns about interference to incumbent downlink operations in the band. See Carr Astronautics Corporation Refresh PN Comments at 2 (rec. Mar. 18, 2025); Aviation Spectrum Resources, Inc./International Air Transport Association Refresh PN Reply Comments at 2, 8, 9 (rec. Mar. 18, 2025) (ASRI/IATA Refresh PN Reply). Similarly, the American Geophysical Union (AGU), Lockheed Martin, National Weather Association, and other weather data users assert that reallocation could jeopardize incumbent operations that produce critical weather data. See American Geophysical Union et al. Refresh PN Comments at 8 (rec. Mar. 3, 2025) (AGU et al. Refresh PN Comments); see also American Geophysical Union et al. Refresh PN Reply Comments at 5 (rec. Mar. 18, 2025) (AGU et al. Refresh PN Reply). Some parties recommend a more cautious sharing approach: Microcom and the U.S. Army Corps of Engineers Water Management Community of Practice acknowledge the ability to share spectrum with respect to uplink commercial operations but express concerns about downlink operations, and EchoStar supports reallocation with certain conditions. See Microcom Design, Inc. Refresh PN Comments at 1, 2, 5 (rec. Feb. 28, 2025); United States Army Corps of Engineers Water Management Community of Practice Refresh PN Comments at 2, 3 (rec. Feb. 28, 2025) (USACE Refresh PN Comments); EchoStar Corporation Refresh PN Comments at 2 (rec. Mar. 3, 2025) (EchoStar Refresh PN Comments). the analyses conducted for the SPRES-FO Report suggest that sharing of the band could be successfully accomplished, subject to appropriate coordination and alternative methods of data distribution. See infra sections III.E.1, III.E.2. Further, given the similar uses in the 1675-1680 MHz and 1680-1695 MHz bands, the studies currently being undertaken by NTIA may indicate that the same coordination and data distribution methods could be applied to enable sharing of the 1680-1695 MHz band as well. By reallocating the 1675-1695 MHz band, we potentially could provide additional opportunities for shared use between incumbent federal operations and new non-federal wireless operations, including terrestrial, D2D, or a hybrid of these services. 31. Similar to our allocation of other flexible-use bands, the proposed reallocation of the 1675-1695 MHz band would permit the band to be auctioned and used for fixed and mobile (except aeronautical mobile) services, See, e.g., Facilitating Shared Use in the 3100-3550 MHz Band, WT Docket No. 19-348, Second Report and Order, Order on Reconsideration, and Order of Proposed Modification, 36 FCC Rcd 5987 (2021) (3.45 GHz Report and Order) (amending the allocation for the 3.45 GHz band to add a primary non-federal fixed and mobile allocation per Congress’ directive); FCC, Auction 110: 3.45 GHz Service, https://www.fcc.gov/auction/110 (last visited Oct. 5, 2026); Reallocation and Service Rules for the 698-746 MHz Spectrum Band (Television Channels 52-59), GN Docket No. 01-74, Report and Order, 17 FCC Rcd 1022, 1029, para. 13 (2002) (amending the allocation for the Lower 700 MHz band to add fixed and mobile allocations); FCC, Auction 73: 700 MHz Band, https://www.fcc.gov/auction/73 (last visited Oct. 5, 2026). providing flexibility to potential licensees and enabling them to tailor their use of the band to the specific needs of their networks. We tentatively conclude that unlocking this band for fixed and mobile services would be beneficial because it would increase the amount of mid-band spectrum available, thereby helping to meet the strong demand for spectrum with advantageous characteristics that can support a wide variety of services. NTIA found that the 1675-1680 MHz band can be used for terrestrial wireless services and is currently studying whether the band can be used for D2D. 2026 NTIA Identification Letter at 1-2. It is also studying whether the 1680-1695 MHz band can be repurposed for commercial wireless services and D2D. Id. at 3; see Letter from Gerard J. Waldron, Counsel to Ligado, Covington, to Marlene H. Dortch, Secretary, FCC, WT Docket No. 19-116, at 2 (filed May 1, 2026). Accordingly, we seek comment on our proposal to reallocate the 1675-1695 MHz band. What propagation characteristics make this band well-suited for certain services and technologies? If reallocated, what types of services and technologies would be best suited for this spectrum? We request comment on the potential use cases that would promote intensive use of this spectrum. What are the potential effects that reallocation may have on this band? We invite commenters to discuss the costs and benefits of reallocating the 1675-1695 MHz band. 32. As discussed above, NTIA is conducting a study to determine whether the 1675-1695 MHz band can be used for D2D operations. See supra paras. 18, 20. To the extent that this spectrum can be used for such purposes, we propose to reallocate the 1675-1695 MHz band on a secondary basis to accommodate satellite use for D2D. The L-band (frequencies from 1 GHz to 2 GHz) and the S-band (frequencies from 2 GHz to 4 GHz) are considered ideal for D2D operations due to the characteristics of the bands. See, e.g., 2026 NTIA Identification Letter at 1-2, 3. Further, private entities have recently sought to obtain access to more MSS spectrum, including for D2D service offerings, which demonstrates the intense demand for such spectrum. See Space Bureau MSS Clarification Order at 2-3 (dismissing with prejudice the requests of SpaceX, Kepler, Sateliot, and AST seeking to access specific MSS bands and dismissing two petitions for rulemaking from SpaceX and Iridium seeking to change the licensing band plan for MSS services in the 1.6/2.4 GHz bands). For example, SpaceX filed an application seeking to modify the authorization for its second generation Starlink system to add a D2D service in portions of the L-band and S-band, See id. at 3-4 & n.3. and AST filed an application seeking access to part of the S-band for D2D services. Letter from Kathryne Dickerson, Counsel for AST SpaceMobile, GreenbergTraurig, to Marlene H. Dortch, Secretary, FCC, ICFS File Nos. SAT-MOD-20260105-00005, SAT-MOD-20260121-00036, Attach. 2 at 1 (filed Feb. 18, 2026); see AST & Science, LLC, ICFS File No. SAT-MOD-20260105-00005, Narrative, at 1-2, 8-9 (Jan. 8, 2026). Because of the strong interest in D2D, we seek to increase the amount of spectrum that can be used for D2D services, and reallocation of the 1675-1695 MHz band would significantly expand the amount of D2D spectrum available. By allowing licensees to use this band for either terrestrial or D2D operations, we would serve the public interest by increasing the number of potential facilities-based providers. Accordingly, we propose to add a secondary MSS allocation for domestic SCS in both the Earth-to-space and space-to-Earth directions and accordingly propose to add this band to footnote NG33A in the U.S. Table. Any changes to the SCS regime adopted in the companion D2D Modernization NPRM would thus apply, should the band be used for D2D services. We seek comment on this proposal. What propagation characteristics make this band well-suited for D2D operations? What are the possible use cases for D2D operations? If reallocated, what are the potential effects that reallocation may have on this band? We ask commenters to discuss the costs and benefits of reallocating this band for secondary D2D services. 33. As detailed below, we propose that any new non-federal fixed or mobile operations be required to coordinate with incumbent (both current and planned) federal operations to avoid causing harmful interference. More specifically, we propose that federal operations in the MetSat Service remain primary in this band. See id. This proposal is consistent with the Commission’s co-primary treatment of 47 federal earth stations in the adjacent 1695-1710 MHz band in the AWS-3 Report and Order. See AWS-3 Report and Order, 29 FCC Rcd 4610, 4684, para. 199 (2014) (AWS-3 Report and Order); see also 47 CFR § 2.106(c)(88)(ii). We also seek to refresh the record on the proposal to remove the unused non-federal MetAids Service allocation from the 1675-1680 MHz band and expand the proposal by seeking comment on removing that allocation from the entire 1675-1695 MHz band, given that there are currently no non-federal radiosonde licensees in this band. See 1675-1680 MHz NPRM, 34 FCC Rcd at 3559, para. 14. We seek comment on these proposals, and on whether to include the protections for federal operations discussed below in the Commission’s rules or as a footnote to the U.S. Table. See id. 34. We tentatively conclude that our proposal to add co-primary allocations for fixed and mobile (except aeronautical mobile) services and a secondary MSS allocation for domestic SCS service to the U.S. Table meets the criteria for the allocation of flexible-use spectrum under section 303(y) of the Communications Act of 1934, as amended. See 47 U.S.C. § 303(y); see also 1675-1680 MHz NPRM, 34 FCC Rcd at 3559, para. 15. Section 303(y) allows the Commission to allocate spectrum for flexible uses if the allocation “is consistent with international agreements” and if the Commission finds that: (1) “[the] allocation would be in the public interest”; (2) “such use would not deter investment in communications services and systems, or technology development”; and (3) “such use would not result in harmful interference among users.” 47 U.S.C. § 303(y). We seek comment on this tentative conclusion. 2. 2020-2025 MHz Band 35. The 2020-2025 MHz band currently is allocated for non-federal fixed and mobile services only. 47 CFR § 2.106. As discussed above, Kepler and Spire have asked the Commission to remove the allocations for fixed and mobile and replace them with allocations for MSS (Earth to space) and (space to Earth) in order to facilitate smallsat deployment. See supra section II.E, Kepler Spire Petition. Internationally, Region 2 also includes an MSS (Earth-to-space) allocation in the 2020-2025 MHz band. 47 CFR § 2.106. The adjacent AWS-4 band at 2000-2020 MHz is also allocated for fixed, mobile, and MSS (Earth-to-space). 47 CFR § 2.106. For the 2020-2025 MHz band, we propose to retain the primary allocations for fixed and mobile and to add a secondary MSS allocation for domestic SCS in both the Earth-to-space and space-to-Earth directions. The fixed and mobile allocations will harmonize this band with the other bands discussed in this FNPRM, as well as enable potential synergies with the adjacent AWS-4 band, while the new MSS allocation for SCS will accommodate satellite use of this band for D2D. For example, as part of the recent approval of SpaceX’s acquisition of spectrum from EchoStar, WTB and SB granted SpaceX a waiver of its AWS-4 terrestrial buildout requirements—conditioned on D2D performance metrics—to allow it the technological flexibility to deploy D2D in the band. See SpaceX-EchoStar Order at 21-27, paras. 47-61. A secondary MSS allocation for SCS in this adjacent band would allow similar technological flexibility, and would potentially accommodate an expanded D2D band up to 2025 MHz. This broader D2D band could either support continuous service across this broader 2000-2025 MHz band or facilitate better coexistence between two different licensees operating similar services in the 2000-2025 MHz and 2020-2025 MHz bands respectively, while still affording a potential licensee in the 2020-2025 MHz band the flexibility to deploy terrestrial operations. We seek comment on these proposals. 36. We also seek comment on whether the band should instead be allocated only to either terrestrial or MSS use, and the cost and benefits of limiting the use of the band in this way at the allocation level. Additionally, we seek comment on any potential adjacent-band impact to AWS-4 operations in the 2000-2020 MHz band from new terrestrial or D2D operations in this band. We also seek comment below on potential coordination requirements that may prevent or ameliorate any such impact. See infra section III.E.3. We tentatively conclude that our proposal to add a secondary MSS allocation for domestic SCS by adding these bands to footnote NG33A of the U.S Table meets the criteria for the allocation of flexible-use spectrum under section 303(y) of the Communications Act of 1934, as amended, and we seek comment on this proposal. See 47 U.S.C. § 303(y). B. Licensing and Operational Rules 1. Flexible Use Under Part 27 37. Terrestrial operations. We seek to afford licensees the flexibility to align licenses in the 1675-1695 MHz and 2020-2025 MHz bands with licenses in other spectrum bands governed by part 27 of the Commission’s rules, including the adjacent AWS-3, AWS-4, and 1670-1675 MHz bands. See 47 CFR § 27.5. We therefore propose to license these bands for terrestrial use under part 27, subject to all licensing and operational rules that are applicable to all part 27 services, including flexible use, 47 CFR § 27.2. regulatory status, 47 CFR § 27.10. compliance with construction notification requirements, 47 CFR § 27.14(k). renewal criteria, 47 CFR § 1.949. permanent discontinuance of operations, 47 CFR § 1.953. partitioning and disaggregation, 47 CFR § 1.950. and spectrum leasing. 47 CFR §§ 1.9001-1.9080. We seek comment on this approach and ask commenters to identify any aspects of our general part 27 service rules that should be modified to accommodate the particular characteristics of the 1675-1695 MHz or 2020-2025 MHz bands. In addition, we seek comment below on service-specific rules for the 1675-1695 MHz and 2020-2025 MHz bands, including eligibility, mobile spectrum holdings policies, license term, performance requirements, renewal term construction obligations, and other licensing and operating rules. We also seek comment on the potential impact of our proposals on promoting competition. In addressing these issues, commenters should discuss the costs and benefits associated with these proposals and any alternative that commenters propose. 38. D2D operations. The parallel D2D Modernization NPRM seeks broad comment on a revamped SCS framework and service rules. D2D Modernization NPRM at section III.A.3. We anticipate that, if the Commission adopts rules developed in that proceeding, they will apply to the bands under consideration here, assuming that allowing D2D operations is consistent with NTIA’s ongoing study of the 1675-1695 MHz band, and assuming that we adopt our proposal to include a secondary MSS allocation for SCS for both bands. Given this, we invite commenters to address here the sufficiency of the rules and framework under consideration in that proceeding for the 1675-1695 MHz and 2020-2025 MHz bands. We also seek comment on how the inclusion of D2D operations or services in the 1675-1695 MHz and 2020-2025 MHz bands may affect the appropriate rules or regulations for terrestrial service in these bands. 2. Eligibility 39. Consistent with previous Commission actions, we propose to adopt an open eligibility standard for the licensing of the 1675-1695 MHz and 2020-2025 MHz bands. See, e.g., Upper C-band (3.98-4.2 GHz) et al., GN Docket No. 25-59 et al., Report and Order, Order of Proposed Modification, and Order on Reconsideration, FCC 26-46, at 19, para. 57 (July 24, 2026) (2026 Upper C-band Report and Order); 3.45 GHz Report and Order, 36 FCC Rcd at 6022, para. 100; Expanding Flexible Use of the 3.7-4.2 GHz Band, GN Docket No. 18-122, Report and Order and Order of Proposed Modification, 35 FCC Rcd 2343, 2380-81, paras. 81-82 (2020) (2020 C-band Report and Order). In the 1675-1680 MHz NPRM, the Commission proposed and sought comment on adopting an open eligibility standard for licenses in the 1675-1680 MHz band, and no commenters voiced opposition to this proposal. See 1675-1680 MHz NPRM, 34 FCC Rcd at 3563-64, para. 29; see also Ligado Networks LLC Comments at 19 (rec. June 21, 2019) (Ligado Comments) (agreeing that the Commission should adopt an open eligibility standard for licenses in the 1675-1680 MHz band). We note that an open eligibility approach would not affect citizenship, character, or other generally applicable qualifications that may apply under our rules. See, e.g., 47 U.S.C. §§ 301, 308(b), 310. We seek comment on adopting this proposal and on whether adopting an open eligibility standard for licenses in these bands would encourage the development of new technologies, products, and services, while helping to maximize the efficient and intensive use of this spectrum. See id. § 309(j)(3). Commenters should discuss the costs and benefits of the open eligibility proposal on competition, innovation, and investment. 40. We note that, in the companion D2D Modernization NPRM, we seek comment on revised eligibility criteria for SCS licensees. To the extent that such criteria are adopted, and assuming SCS use is permitted in these bands, we propose such criteria would apply to SCS use of these bands for D2D operations. We seek comment on this proposal. 3. Mobile Spectrum Holdings Policies 41. We seek comment generally on whether and how to address any mobile spectrum holdings issues involving 1675-1695 MHz and 2020-2025 MHz spectrum to meet our statutory requirements and ensure competitive access to these bands. The Communications Act requires the Commission to examine closely the impact of spectrum aggregation on competition, innovation, and the efficient use of spectrum to ensure that spectrum is assigned in a manner that serves the public interest, convenience, and necessity. Section 309(j)(3) of the Communications Act provides that, in designing systems of competitive bidding, the Commission must “include safeguards to protect the public interest in the use of the spectrum,” and must seek to promote various objectives, including “promoting economic opportunity and competition and ensuring that new and innovative technologies are readily accessible to the American people by avoiding excessive concentration of licenses and by disseminating licenses among a wide variety of applicants,” and promoting the “efficient and intensive use” of spectrum. 47 U.S.C. § 309(j)(3); see also Policies Regarding Mobile Spectrum Holdings; Expanding the Economic and Innovation Opportunities of Spectrum Through Incentive Auctions, WT Docket Nos. 12-269 and 12-268, Report and Order, 29 FCC Rcd 6133, 6137, para. 8 (2014) (Mobile Spectrum Holdings Report and Order). We propose to include the 1675-1695 MHz and/or 2020-2025 MHz bands in the Commission’s spectrum screen, which helps to identify those markets that may warrant further competitive analysis in evaluating proposed secondary market transactions. See, e.g., 2020 C-band Report and Order, 35 FCC Rcd at 2383, para. 87. The Commission examines the suitability and availability of spectrum in the near term for the provision of mobile telephony/broadband services to determine whether particular bands should be included within the total spectrum screen. Mobile Spectrum Holdings Report and Order, 29 FCC Rcd at 6169-70, paras. 70-75. “Suitability is determined by whether the spectrum is capable of supporting mobile service given its physical properties and the state of equipment technology, whether the spectrum is licensed with a mobile allocation and corresponding service rules, and whether the spectrum is committed to another use that effectively precludes its use for mobile services.” Id. at 6169, para. 71. “Spectrum is considered available if it is fairly certain that it will meet the criteria for suitable spectrum in the near term, an assessment that can be made at the time the spectrum is licensed or at later times after changes in technology or regulation that affect the consideration.” Id. (internal quotation marks omitted). We tentatively conclude that this spectrum would be “suitable and available” for mobile services, and we seek comment on that conclusion, including on how the similarity of this spectrum to spectrum currently included in the screen should be factored into our analysis. 42. Similar to the Commission’s approach in the 2026 C-band Report and Order and other related proceedings, we propose not to adopt a pre-auction, bright-line limit on the ability of any entity to acquire spectrum in the 1675-1695 MHz and/or 2020-2025 MHz bands through competitive bidding at auction. 2026 Upper C-band Report and Order at 29, para. 60; 2020 C-band Report and Order, 35 FCC Rcd at 2381-83, paras. 83-86; Expanding Flexible Use of the 3.7 to 4.2 GHz Band et al., GN Docket No. 18-122 et al., Order and Notice of Proposed Rulemaking, 33 FCC Rcd 6915, 6963-64, para. 147 (2018); Use of Spectrum Bands Above 24 GHz for Mobile Radio Services et al., GN Docket No. 14-177 et al., Second Report and Order, Second Further Notice of Proposed Rulemaking, Order on Reconsideration, and Memorandum Opinion and Order, 32 FCC Rcd 10988, 11009-11, paras. 70-74 (2017). Since such pre-auction limits may unnecessarily restrict the ability of entities to participate in and acquire spectrum in an auction, we are not inclined to adopt such limits absent a clear indication that they are necessary to address a specific competitive concern, and we seek comment on any specific concerns of this type. Additionally, we propose to review spectrum holdings on a case-by-case basis when applications for initial licenses are filed post-auction to ensure that the public interest benefits of having a threshold on spectrum applicable to secondary market transactions are not rendered ineffective. See, e.g., 2020 C-band Report and Order, 35 FCC Rcd at 2383, 2384, paras. 86, 89; Upper C-band (3.98-4.2 GHz), GN Docket No. 25-59, Notice of Proposed Rulemaking, 40 FCC Rcd 9462, 9477, para. 36 (2025) (2025 C-band NPRM). Finally, to the extent that we include a secondary MSS allocation for SCS for this band, we seek comment on applying these mobile spectrum holdings policies to the proposed D2D use of the band or whether any changes are needed for SCS use of the band. See also D2D Modernization NPRM at section III.A.3. 4. Band Plan 43. Geographic Area License Size. In light of the additional spectrum being considered in this proceeding, and the possibility of adding a secondary MSS allocation for SCS to support D2D operations, we seek to refresh the record by proposing to license the 1675-1695 MHz and 2020-2025 MHz bands on a geographic area basis, and we invite commenters to discuss this proposal. Geographic area licensing is consistent with the Commission’s approach in several other bands used to provide fixed and mobile services, See, e.g., 47 CFR § 27.6(l) (600 MHz), (m) (3.7 GHz), (n) (3.45 GHz). and it promotes efficient spectrum use, helps facilitate robust spectrum auctions, and provides flexibility to licensees. See 2026 Upper C-band Report and Order at 18, para. 55; 3.45 GHz Report and Order, 36 FCC Rcd at 6026, para. 110. We do not offer a specific geographic area proposal at this time, but we request comment on whether to license these bands using nationwide, Regional Economic Area Groupings (REAGs), or Partial Economic Area (PEA) licenses, or some combination of these sizes. In the 1675-1680 MHz NPRM, the Commission proposed to license the 1675-1680 MHz band on a geographic area basis, and specifically proposed to do so on a PEA basis. 1675-1680 MHz NPRM, 34 FCC Rcd at 3562, paras. 25-26. Commenters support geographic area licensing, but the record is divided in response to the specific proposal to license this band on a PEA basis. See Competitive Carriers Association Reply Comments at 4 (rec. July 22, 2019); DISH Network Corporation Reply Comments at 1, 2 (rec. July 22, 2019) (DISH Reply); EchoStar Refresh PN Comments at 2-3; Ligado Comments, Attach. A; National Spectrum Management Association Comments at 5-6 (rec. June 19, 2019) (NSMA Comments). Those supporting PEA licensing argue that it would encourage more bidders to participate in the auction, allow bidders to focus on geographic areas tailored to their networks, and promote rapid deployment of wireless services, while those supporting nationwide licensing assert that it would align and simplify coordination with the adjacent 1670-1675 MHz band, provide flexibility for nationwide networks, and support many comprehensive use cases. See DISH Reply at 2; Iridium Communications Inc. Reply Comments at 3-4 (rec. July 22, 2019) (Iridium Reply); see also NSMA Comments at 5-6 (recommending geographic area licensing to encourage more bidders, including smaller bidders, to participate in the auction); Brattle Group Refresh PN Reply Comments at 1-3 (rec. Mar. 17, 2025) (Brattle Refresh PN Reply); Iridium Reply at 3-4; Ligado Networks LLC Refresh PN Comments at 3, 9-10 (rec. Mar. 3, 2025) (Ligado Refresh PN Comments); Ligado Networks LLC Refresh PN Reply Comments at 7-9 (rec. Mar. 18, 2025); Select Spectrum Refresh PN Comments at 1-2, 5 (rec. Feb. 28, 2025); Spectrum Financial Consulting, LLC Reply Comments at 5 (rec. July 22, 2019) (SFC Reply). Additionally, commenters favoring a nationwide license oppose PEAs due to the potential for band fragmentation, spectrum devaluation, and deployment difficulties. Brattle Refresh PN Reply at 1-3; Iridium Reply at 3-4; Ligado Refresh PN Comments at 3, 9-10; Ligado Refresh PN Reply at 7-9; Select Spectrum Refresh PN Comments at 1-2, 5; SFC Reply at 5. Alternatively, EchoStar advocates for using Economic Areas (EA) to align with the adjacent AWS-3 band, lessen network fragmentation, and maximize efficiency. EchoStar Refresh PN Comments at 2-4 & n.10. We note that even if the spectrum were to be licensed at a PEA-level, parties interested in using the spectrum throughout a REAG or nationwide would still have the opportunity to aggregate the smaller licenses for that purpose. As such, instead of licensing the spectrum by larger geographic areas, should we rely on auction design features such as those discussed further below See infra section III.C. to facilitate any desired aggregation of contiguous smaller licenses? Commenters should address the economic, technical, and public interest considerations for their preference between nationwide, REAG, and PEA licenses. 44. We seek comment on whether the use of nationwide, REAG, or PEA geographic areas would be consistent with the requirements and objectives of section 309(j). See 47 U.S.C. § 309(j)(3)-(4). Would one size more readily facilitate access to spectrum by both small and large providers than another? Would any particular geographic area size be more likely to encourage deployment of wireless services to consumers, particularly to those in unserved or underserved areas? Would licensing by any particular geographic area be more likely than others to foster investment in and rapid deployment of new services and technologies? To what extent would the geographic area size impact use of the bands for SCS, if we adopt the secondary MSS allocation for domestic SCS? Could D2D services be provided if these licenses are offered on a PEA or REAG basis, or would a nationwide license be necessary from an economic and/or operational standpoint? In light of the federal incumbent operations in these bands, does a particular geographic market size enable licensees to more easily deal with challenges that come with sharing the band with incumbents? Are there other geographic areas that we should consider for licensing these bands, for example, EAs? Commenters should discuss the economic, technical, public interest, and other relevant considerations for their geographic area preferences. Are there differences between the 1675-1695 MHz and the 2020-2025 MHz bands that may warrant using different geographic areas? We ask that commenters address the costs and benefits of their preferred license size. Commenters should also explain how their preferred license size may be more advantageous compared to other license sizes. 45. We seek to refresh the record on how to approach licensing for the Gulf of America, given the additional spectrum and use cases being considered. In the 1675-1680 MHz NPRM, we sought comment on this issue for the 1675-1680 MHz band. SFC was the only commenter to respond to this inquiry, observing that a nationwide license could be accomplished through a single nationwide license or a single continental U.S. license with separate licenses for the Gulf of America, Puerto Rico, U.S. Virgin Islands, and Guam-Northern Mariana Islands. SFC Reply at 1, 7. We ask commenters to discuss a licensing approach for the Gulf of America regarding the 1675-1695 MHz and 2020-2025 MHz bands. In AWS-1, AWS-3, AWS-4, and H Block, the Commission issued separate licenses for the Gulf of America. Service Rules for Advanced Wireless Services in the 1.7 GHz and 2.1 GHz Bands, WT Docket No. 02-353, Report and Order, 18 FCC Rcd 25162, 25177, para. 40 (2003); AWS-3 Report and Order, 29 FCC Rcd at 4621, 4665, paras. 20 n.74, 151; Service Rules for Advanced Wireless Services in the 2000-2020 MHz and 2180-2200 MHz Bands et al., WT Docket No. 12-70 et al., Report and Order and Order of Proposed Modification, 27 FCC Rcd 16102, 16122-23, para. 51 (2012); Service Rules for Advanced Wireless Services H Block—Implementing Section 6401 of the Middle Class Tax Relief and Job Creation Act of 2012 Related to the 1915-1920 MHz and 1995-2000 MHz Bands, WT Docket No. 12-357, Report and Order, 28 FCC Rcd 9483, 9502, paras. 44-45 (2013) (H Block Report and Order). However, in the Upper 700 MHz band, the Commission included the Gulf of America in larger service areas. Service Rules for the 746-764 and 776-794 MHz Bands, and Revisions to Part 27 of the Commission’s Rules, WT Docket No. 99-168, First Report and Order, 15 FCC Rcd 476, 500, para. 56 & n.137 (2000). Commenters that support a separate service area or areas to cover the Gulf of America should discuss the license boundaries that should be used and whether special interference protection criteria or performance requirements are necessary due to the unique radio propagation characteristics and antenna siting challenges that exist for licensees. 46. We also seek comment on a licensing approach for Puerto Rico, the U.S. Virgin Islands, American Samoa, Guam, and the Northern Mariana Islands (collectively “U.S. territories”) for the 1675-1695 MHz and 2020-2025 MHz bands. If we pursue licensing on a geographic area basis, should we maintain or diverge from the Commission’s licensing boundaries for the U.S. territories? See, e.g., Wireless Telecommunications Bureau Provides Details About Partial Economic Areas, GN Docket No. 12-268, Public Notice, 29 FCC Rcd 6491, 6501, Attach. A (WTB 2014) (licensing the U.S. territories as Puerto Rico [PEA 412], Guam-Northern Mariana Islands [PEA 413], U.S. Virgin Islands [PEA 414], and American Samoa [PEA 415]). In a nationwide licensing scheme, the license typically covers all 50 U.S. states, the District of Columbia, and U.S. territories. See Ligado Refresh PN Comments at 9 n.27 (citing FCC, FCC Areas, https://www.fcc.gov/oet/maps/areas (last updated May 8, 2020)). If we determine that licenses should be authorized on a nationwide basis, should all U.S. states, territories and possessions be included, or should we consider licensing on, for example, a contiguous United States (CONUS) basis, with Alaska, Hawaii, and the U.S. territories licensed separately? Commenters should address the costs and benefits of their recommended proposals for licensing the U.S. territories. 47. In the SCS Report and Order, the Commission determined that it was in the public interest to establish geographically independent areas (GIAs) in order to minimize the potential interference from D2D services to geographically-adjacent, co-channel license areas. SCS Report and Order, 39 FCC Rcd at 2646, para. 55. For the initial SCS framework, the Commission created six GIAs: (1) CONUS, (2) Alaska, (3) Hawaii, (4) American Samoa, (5) Puerto Rico/U.S. Virgin Islands, and (6) Guam/Northern Mariana Islands. Id. To provide SCS under a part 25 authorization, the Commission requires a satellite operator to be the lessee of one or more valid lease arrangement(s) covering (1) all frequencies over which it provides SCS, as identified in its part 25 SCS application, and (2) the entire area of a GIA. Id. (noting that this requirement is not met if a significant portion of the GIA’s geographic is not licensed). We note that the companion D2D Modernization NPRM proposes to eliminate the geographical separation requirements and instead use other measures to reduce the potential for harmful interference. D2D Modernization NPRM at section III.A.3. Notwithstanding that proposed change, given the near greenfield spectrum at issue here, we seek comment on whether a GIA covering CONUS is the most appropriate way to license D2D services as it applies in the context of the 1675-1695 MHz and 2020-2025 MHz bands. Given that these bands will not have the same incumbency issue as existing commercial bands (to the extent that federal users are transitioned away from the 1675-1695 MHz spectrum), we seek comment on whether using GIAs is the most effective approach in this instance or whether we should consider other options similar to those raised in the D2D Modernization NPRM. 48. Proposed Band Plan. To optimize use of the 1675-1695 MHz and 2020-2025 MHz bands, we propose a band plan consisting of two unpaired 10 megahertz blocks and one unpaired 5 megahertz block, as depicted below in Figure 1. While the Commission previously proposed to auction 1675-1680 MHz licenses on an unpaired basis for terrestrial fixed and mobile use, the additional spectrum now under consideration requires us to revise our earlier proposal. See 1675-1680 MHz NPRM, 34 FCC Rcd at 3561, para. 22. The frequency ranges for these blocks would be 1675-1685 MHz, 1685-1695 MHz, and 2020-2025 MHz, respectively. We believe that the proposed band plan could advance the Commission’s goal of putting spectrum to its highest and best use. See 47 U.S.C. § 309(j)(3). This proposed configuration would allow adjacent band incumbents to aggregate contiguous spectrum, nearby licensees to expand their spectrum holdings, and new entrants to access desirable mid-band spectrum. We seek comment on this proposal and the tentative conclusions below and seek comment on alternative band plans described below. Proposed Band Plan 49. We expect that future licensees would utilize these 10- and 5-megahertz blocks for commercial mobile wireless operations, D2D operations, or a hybrid of both and believe these block sizes would provide an adequate amount of spectrum to achieve such operations, as exhibited in other bands used for similar purposes. See, e.g., SPRES-FO Report at 3-4 (discussing the potential for 5G operations in the1675-1680 MHz band); Auction of Advanced Wireless Services (AWS-3) Licenses et al., AU Docket No. 25-117, Public Notice, DA 25-1075, at 34, para. 96 (OEA/WTB Dec. 18, 2025) (2026 AWS-3 Auction PN); 3.45 GHz Report and Order, 36 FCC Rcd at 5988, para. 1. Thus, we tentatively conclude that the proposed spectrum block sizes would provide sufficient bandwidth to promote flexibility in deployment and to deliver wireless services efficiently. We believe that this configuration offers a suitable amount of spectrum to accommodate a broad range of mobile wireless services, allowing licensees to deploy operations in a manner best suited for their networks. Further, we anticipate that using a combination of 10- and 5-megahertz blocks would appeal to a wide array of prospective licensees by offering opportunities for small entities to compete for licenses at auction and for larger entities to offer high bandwidth services. The Commission has previously determined that smaller block sizes, such as 10-megahertz blocks, help create opportunities for small carriers to compete for licenses at auction by allowing them to target broadband deployment of this spectrum in particular areas while not inhibiting their flexibility to tailor applications in this band to suit future needs. 3.45 GHz Report and Order, 36 FCC Rcd at 6010-11, para. 59. The proposed block sizes are also consistent with similar bands used for deployment of terrestrial wireless services, such as the AWS-3 and 3.45 GHz bands. In the AWS-3 Report and Order, the Commission concluded that licensing the AWS-3 bands in a combination of 10- and 5-megahertz blocks would promote rapid deployment of new technologies and services through permitting maximum flexibility and encouraging competition. AWS-3 Report and Order, 29 FCC Rcd at 4633-34, paras. 50-52. Similarly, in the 3.45 GHz Report and Order, the Commission found that using 10-megahertz blocks would foster wider participation in the 3.45 GHz auction and further competition in the 3.45 GHz service. 3.45 GHz Report and Order, 36 FCC Rcd at 6009-11, paras. 58-59. As previously stated, we expect that the 1675-1695 MHz and 2020-2025 MHz bands could have similar use cases to those of the AWS-3 and 3.45 GHz bands, so we believe that utilizing 10- and 5-megahertz blocks would enable similar commercial wireless operations. See 2026 AWS-3 Auction PN, at 34, para. 96; 3.45 GHz Report and Order, 36 FCC Rcd at 5988, para. 1. 50. Further, we tentatively conclude that the proposed band plan could support D2D offerings through a broad range of options. As noted, several companies are using or plan to use portions of the L-band and S-band for their D2D offerings, including SpaceX, AST, Amazon, and RocketLab, See Unleashing Unlicensed Spectrum for Direct-to-Device, ET Docket No. 26-169, Notice of Proposed Rulemaking, FCC 26-51, at 1, para. 1 (July 7, 2026). and many existing and prospective D2D providers are seeking more spectrum for D2D services. See supra section II.E. The bands proposed for reallocation in this FNPRM are part of the L-band and S-band and, to the extent that NTIA finds that D2D operations are feasible in the 1675-1695 MHz band, could offer up to 25 megahertz of spectrum for providers to deliver D2D services. Through the proposed band plan, we anticipate that auction bidders would have the flexibility to pursue configurations most beneficial to their desired operations. For example, this band plan could support D2D operations by enabling a licensee to pair an existing holding with one of these bands or a bidder to obtain one block and leverage technology to offer D2D services. We seek comment on this tentative conclusion. Further, do the proposed block sizes provide sufficient bandwidth for D2D operations? Would unpaired blocks allow providers to have more flexibility in tailoring their D2D operations? Likewise, we seek comment on the optimal characteristics for a D2D band plan in these bands, and how the proposed band plan would be beneficial for D2D operations. Commenters should discuss the specific characteristics of the proposed band plan that would enable quick and ubiquitous connectivity through D2D services. 51. We seek comment on whether, instead of using the same geographic area size for all spectrum in these bands, we should adopt separate licensing configurations for each band. For example, should we license spectrum in the 1675-1685 MHz band on a PEA basis, the 1685-1695 MHz band on a REAG basis, and the 2020-2025 MHz band available on a nationwide basis either as a single, nationwide license or as a single nationwide package of PEA-based licenses? Are there differences between spectrum in the 1675-1695 MHz and the 2020-2025 MHz bands that may warrant using two different geographic areas? Does the smaller number of megahertz available in the 2020-2025 MHz band make it more suited to a nationwide market format as opposed to larger blocks of spectrum that are more typically licensed by smaller geographic area, such as PEA or county? See, e.g., 3.45 GHz Report and Order, 36 FCC Rcd at 1609-10, para. 58; 2020 C-band Report and Order, 35 FCC Rcd at 2379, para. 77; Transforming the 2.5 GHz Band, WT Docket No. 18-120, Report and Order, 34 FCC Rcd 5446, 5480 para. 93 (2019) (2.5 GHz Report and Order); Amendment of the Commission’s Rules with Regard to Commercial Operations in the 3550-3650 MHz Band, GN Docket No. 12-354, Report and Order and Second Further Notice of Proposed Rulemaking, 30 FCC Rcd 3959, 3986, paras. 96-98 (2015). Would separate licensing configurations for the 1675-1685 MHz, 1685-1695 MHz, and 2020-2025 MHz bands better facilitate the provision of D2D services in the event that licensees choose to do so? Commenters should discuss the costs and benefits of prescribing such configurations for these blocks. 52. We also tentatively conclude that licensing these bands on an unpaired basis affords licensees flexibility to use these bands in a manner tailored to the specific needs of their networks. This unpaired configuration is technology neutral, thus enabling licensees to determine their own methods of operation. We anticipate that terrestrial licensees will employ frequency division duplexing (FDD) or time division duplexing (TDD) operations in a manner that maximizes the use of their licensed spectrum given their particular operating conditions, which in turn advances the Commission’s goal of putting spectrum to its highest and best use. Likewise, licensing these bands on an unpaired basis would promote consistency with other wireless bands. For example, our proposal is consistent with the bands adjacent to the 1675-1695 MHz band, as the 1670-1675 MHz and 1695-1710 MHz bands are authorized on an unpaired basis. See 1675-1680 MHz NPRM, 34 FCC Rcd at 3561, para. 22 n.53; AWS-3 Report and Order, 29 FCC Rcd at 4620-21, 4625, paras. 19, 29; see also Auction of Advanced Wireless Services (AWS-3) Licenses et al., AU Docket No. 25-117, Public Notice, 40 FCC Rcd 1479, 1481, para. 6 (WTB/OEA 2025) (2025 AWS-3 Auction PN). By using similar configurations as the adjacent bands, licensees with adjacent spectrum to this band plan may be incentivized to bid in an auction in order to combine their holdings to, for example, create a band with larger bandwidth or pair their holdings to pursue FDD operations. Finally, the Commission has adopted unpaired bands for the 3.45 GHz band, 3.5 GHz band, and C-band. See, e.g., 3.45 GHz Report and Order, 36 FCC Rcd at 6011, para. 62; 2020 C-band Report and Order, 35 FCC Rcd at 2378-79, para. 75; Promoting Investment in the 3550-3700 MHz Band, GN Docket No. 17-258, Report and Order, 33 FCC Rcd 10598, 10643-44, para. 82 (2018). Because of the similar anticipated use case for this band, we believe that establishing a comparable configuration to existing flexible-use wireless bands would likely provide an efficient layout for this band. 53. We seek comment on the proposed band plan and our tentative conclusions. In order to determine the appropriateness of the proposed band plan, we seek comment on the use cases for these bands. Would uplink, downlink, or TDD operations best maximize the use of these bands? Should we mandate the use of uplink, downlink, or TDD operations for these bands? See infra section III.D.5. Does that calculus change in the event licensees use their potential secondary SCS rights to provide D2D or hybrid D2D and terrestrial services? What are the advantages or disadvantages of the proposed block sizes? Do they provide an appropriate amount of spectrum for next-generation operations? We are hopeful that the greater flexibility resulting from an unpaired band approach will lead to greater technical efficiency and optimal use of their networks, and we seek comment on the benefits as well as the costs of licensing these bands on an unpaired basis. We seek comment on how to enable these efficiencies without either causing harmful interference to adjacent band operations or unduly burdening 1675-1695 MHz licenses. We invite commenters to discuss the use of unpaired bands in comparison to paired bands for this approach. For example, would these unpaired blocks promote competition during the auction and in the provision of services in these bands? We ask commenters to discuss the costs and benefits of the proposed band plan. 54. Alternative Band Plans. We also seek comment on whether we should instead license these bands in an unpaired band plan comprised of five blocks of 5 megahertz each (Alternative Option 1). As shown in the illustration below, the frequency ranges for these five blocks would be 1675-1680 MHz, 1680-1685 MHz, 1685-1690 MHz, 1690-1695 MHz, and 2020-2025 MHz. Like the proposed band plan, we believe that Alternative Option 1 could promote competition and offer flexibility in deployment, while also enabling entities to purchase the amount of spectrum they require. What are the advantages and disadvantages of licensing these bands in five blocks of 5 megahertz each? Would these block sizes provide licensees with sufficient bandwidth for their planned operations? We request comment on examples of the potential use cases for Alternative Option 1 and on whether this band plan would maximize overall use of these bands. Would Alternative Option 1 increase competition during the auction and in the provision of wireless services? Would it provide more entry opportunities for small entities? To the extent we permit D2D on a secondary basis in these bands, how might these smaller blocks impact potential use of the spectrum for D2D service? We ask commenters to provide analyses of the costs and benefits of Alternative Option 1. Alternative Option 1 – Five 5-Megahertz Block Band Plan 55. Alternatively, we seek comment on the Alternative Option 2 band plan illustrated below. Alternative Option 2 would provide a hybrid approach by offering an unpaired 10-megahertz block in the 1675-1685 MHz band and a 15-megahertz block that pairs the 1685-1695 MHz and 2020-2025 MHz bands. We anticipate that a licensee could use the paired bands for uplink and downlink operations but do not propose to mandate either to promote operational flexibility. While we are not proposing to mandate directional limitations with respect to the paired block, we are requesting input on whether it would nevertheless be necessary to impose directional limitations or guard bands to reduce the possibility of harmful interference. See infra sections III.D.5, III.E.1, III.E.2. What are the costs and benefits of this paired block? Are there technical or operational benefits or efficiencies gained by pairing the 1685-1695 MHz and 2020-2025 MHz bands in this manner? We ask that commenters provide feedback on whether potential use cases can benefit from Alternative Option 2, particularly for the paired 15 megahertz of spectrum. Would this Alternative Option 2 increase competition during the auction and in the provision of wireless services? Would it be sufficient to provide entry opportunities for small entities? To the extent that it would be appropriate to implement such measures, how would they affect the usage of these bands? How would this hybrid approach impact potential D2D operations? We seek comment on the costs and benefits of Alternative Option 2. Commenters who support Alternative Option 2 should explain why it is preferable to the proposed band plan. Alternative Option 2 – Paired Band Plan 5. License Term 56. Consistent with the license terms of other flexible-use bands, See Review of the Commission’s Rules Governing the 896-901/935-940 MHz Band, WT Docket No. 24-99, RM-11977, Report and Order, FCC 26-9, at 24, para. 64 (Feb. 19, 2026) (900 MHz Broadband Report and Order) (adopting a 15-year license term for the 3/3 and 5/5 900 MHz broadband licensees and a 10-year renewal term); 3.45 GHz Report and Order, 36 FCC Rcd at 6029, paras. 116-17 (adopting a 15-year license term for the 3.45 GHz service); 3.7 GHz Report and Order, 35 FCC Rcd at 2384-85, paras. 90-91 (adopting a 15-year license term for the 3.7 GHz service). we propose a 15-year term for licenses for the 1675-1695 MHz and 2020-2025 MHz bands. The Commission typically has adopted 10-year license terms for part 27 services. See 47 CFR § 27.13. However, in certain cases, the Commission has found a longer initial license term to be in the public interest. See, e.g., Review of the Commission’s Rules Governing the 896-901/935-940 MHz Band, WT Docket No. 17- 200, Report and Order, Order of Proposed Modification, and Orders, 35 FCC Rcd 5183, 5233, para. 124 n.356 (2020) (citing Service Rules for Advanced Wireless Services in the 1.7 GHz and 2.1 GHz Bands, WT Docket No. 02-353, Report and Order, 18 FCC Rcd 25162, 25190, para. 70 (2003) (finding that the transition warranted a 15-year initial license term, with 10-year terms thereafter)); Expanding the Economic and Innovation Opportunities of Spectrum Through Incentive Auctions, GN Docket No. 12-268, Report and Order, 29 FCC Rcd 6567, 6875, para. 759 (2014) (finding that the transition warranted a 12-year initial license term, with 10-year terms thereafter). In the 1675-1680 MHz NPRM, the Commission proposed and sought comment on a 15-year term for the 1675-1680 MHz band, 1675-1680 MHz NPRM, 34 FCC Rcd at 3565, para. 32 (proposing a 15-year license term for licensees in the 1675-1680 MHz band because it would afford licensees sufficient time to make long-term investments in deployment). and no commenters in the record opposed it. We seek to refresh the record on this issue in light of the additional spectrum being considered, and tentatively conclude that a 15-year term would provide licensees sufficient time to make long-term investments in deployment, especially in light of the proposed coordination requirements with federal incumbents. We also propose a 15-year term for subsequent license terms for the 1675-1695 MHz and 2020-2025 MHz bands, which aligns with the license terms of other wireless broadband spectrum bands. See 47 CFR § 27.13(m) (3700-3980 MHz band), (o) (3450-3550 MHz band). We seek comment on the proposed license terms, including the costs and benefits of these proposals. Is a 15-year license term appropriate for these bands? Is this license term sufficient for licensees to develop and implement their networks, or can greater efficiency be achieved by requiring faster deployment? Does the potential for D2D services in these band favor a longer or shorter license term? We invite commenters to submit alternative proposals for their preferred license term. Commenters proposing a different term should provide reasoning, including a discussion of the costs and benefits, as well as an explanation for why a 15-year term is not suitable for these bands. 6. Performance Requirements a. Traditional Terrestrial Operations 57. Population-based performance requirements. The Commission establishes performance requirements to promote expeditious deployment of new technologies and services, and to ensure that spectrum, as a valuable national resource, is used intensely, and efficiently, and deployed as quickly as possible. See, e.g., H Block Report and Order, 28 FCC Rcd at 9558-59, para. 195; see also AWS-3 Report and Order, 29 FCC Rcd at 4659-60, para. 135; Expanding the Economic and Innovation Opportunities of Spectrum Through Incentive Auctions, GN Docket No. 12-268, Report and Order, 29 FCC Rcd 6567, 6877-78, para. 764 (2014). For auctioned services, section 309(j) requires that the Commission’s rules include “performance requirements, such as appropriate deadlines and penalties for performance failures, to ensure prompt delivery of service to rural areas, to prevent stockpiling or warehousing of spectrum by licensees or permittees, and to promote investment in and rapid deployment of new technologies and services.” 47 U.S.C. § 309(j)(4)(B). These requirements play a critical role in ensuring that licensed spectrum does not lie fallow, in part by incentivizing investment in spectrum licenses by those entities willing and able to develop that spectrum toward its highest and best use. Accordingly, considering the situation and characteristics of these bands, we propose to require a terrestrial licensee in the 1675-1695 MHz and/or 2020-2025 MHz bands to provide reliable signal coverage and offer service to at least 45% of the population in each of its license areas as an interim performance benchmark, and to at least 80% of the population in each of its license areas as a final performance benchmark. CTIA and EchoStar both support a population coverage requirement (in addition to a geographic area coverage option), but do not suggest specific coverage levels. See EchoStar Refresh PN Comments at 4; CTIA Comments at 4 (rec. June 21, 2019) (CTIA Comments). We proposed these same benchmarks in the 1675-1680 MHz NPRM, and no commenter objected to the proposed coverage levels, while Ligado supported them. See 1675-1680 MHz NPRM, 34 FCC Rcd at 3565, para. 34; Ligado Comments at 14-15. These are also the benchmarks we recently adopted for the Upper C-band. See 2026 Upper C-band Order at 31, para. 64. We seek comment on these proposed benchmark levels for terrestrial operations. 58. We propose that the period for complying with these performance benchmarks would begin on the date that the license is granted. In the Upper C-band, the need to transition incumbent satellite users out of the band constituted a sufficient obstacle to beginning construction such that the start date for the compliance period was set later than the date of license grant. See 2026 Upper C-band Order at 31, para. 64 (setting the Upper C-band performance deadlines at two and six years after the relevant Transition Deadline rather than two and six years from license grant, and distinguishing the treatment of Upper C-band licenses from Lower C-band licenses in this regard due to the different incumbent situations in each band). In the 2020-2025 MHz band, there are no incumbent users, and thus no obstacle to deployment. In the 1675-1695 MHz band, there are federal incumbent users, some of whom will remain in the band; however, the number of incumbents is much less than in Upper C-band, and the areas around the remaining protected sites are envisioned as coordination zones, not exclusion zones. We seek comment below on how these incumbents and the related coordination zones should impact our performance requirements in this band. See infra para. 60. However, the extent of those incumbencies (four protected sites) is significantly less than in Upper C-band, where the preliminary list of incumbent earth stations potentially qualifying for relocation reimbursement contained more than 17,000 entries. See 2026 Upper C-band Order at 46-47, para. 95 (citing International Bureau Releases Preliminary List of Incumbent Earth Stations in the 3.7-4.2 GHz Band in the Contiguous United States, IB Docket No. 20-205; GN Docket No. 20-305, Public Notice, DA 20-703 (IB July 6, 2020)). In addition, after satisfying the final performance benchmark, we propose to require a licensee to continue to provide at least that level of service continuing through the end of the license term in order to qualify for renewal. This requirement applies to many wireless services, as codified in our Wireless Radio Services (WRS) rules. See 47 CFR § 1.949(e)(2). We believe that establishing performance benchmarks before the end of the license term would help ensure continuity of service over the license term, which is essential to our evaluation under the Commission’s renewal standards. We seek comment on these proposals, including their costs and benefits and the costs and benefits of any proposed alternatives. 59. We seek comment on the appropriate timeline for fulfilment of our proposed interim and final terrestrial benchmarks. In the 2019 1675-1680 MHz NPRM, the Commission proposed that the interim benchmark be evaluated at 6 years after license grant, and the final benchmark at 12 years, in a proposed 15-year license term. 1675-1680 MHz NPRM, 34 FCC Rcd at 3565, paras. 32-34. More recent buildout timelines, however, have focused on promoting expeditious deployment by setting interim benchmarks within two to three years of the relevant start date, and final benchmarks at four to five years after the most recent interim benchmark. See 2026 Upper C-band Order at 31, para. 64 (setting interim benchmark of 45% population coverage at two years after the relevant Transition Deadline, and final benchmark of 80% population coverage at six years); SpaceX-EchoStar Order at 24-26, para. 57 (setting the first interim benchmarks at two years from the expected transaction consummation date, and final benchmarks at five years after the second interim benchmark); Grain-T-Mobile Order at 19-22, para. 48 (setting the first interim benchmarks at three years from the waiver grant allowing additional service types (for terrestrial service) or three years from the selection of a satellite partner (for D2D services), and final benchmarks at eight years after waiver (terrestrial) or five years after the second interim benchmark (D2D)). This shift to more accelerated timelines provides greater value to consumers, whose access to digital connectivity might otherwise be delayed by longer deadlines. This is especially true in bands where equipment ecosystems or technical standards already exist, and licensees therefore have a greater ability to begin deployment immediately. We seek comment on how these and other factors would affect appropriate deployment timelines in the 1675-1695 MHz and 2020-2025 MHz bands. What is the current state of the equipment ecosystem for these bands? Is there any necessary standards development work that would need to be completed before equipment could be developed or deployed? Could equipment designed for the adjacent AWS bands be made expeditiously available for these bands? 60. We note that several of the federal incumbent services in the 1675-1695 MHz band will either cease operation or relocate within the band pursuant to the transition between the GOES-R and GeoXO satellite systems currently scheduled for 2036, See NTIA SPRES-FO Report at Fig. 2; NOAA, Geostationary Operational Environmental Satellites (GOES)-R Series, https://www.ncei.noaa.gov/products/satellite/goes-r (last visited July 14, 2026). which is likely to fall in the middle of our proposed license term. This transition may result in a shift in available spectrum within a given area, with some portions of the band becoming available and others becoming less available. How, if at all, should this transition affect the buildout timeline? We propose below to manage coordination with these federal incumbents through the use of coordination zones. To the extent that we issue licenses in the 1675-1695 MHz band on a PEA basis, should the licenses covered or partially covered by these coordination zones be treated differently than other licenses in terms of the timing of performance benchmarks? Alternatively, should these coordination zones instead affect the calculation of licensee coverage or license area population for the purpose of evaluating fulfillment of our performance requirements? For example, should the population of some portion of these coordination zones be excluded from the population of the license area for the purpose of determining what percent of the population a licensee’s service covers? We seek comment on the potential costs and benefits of these possibilities. 61. We seek comment generally on how the above factors should impact the appropriate timeline for our interim and final terrestrial performance benchmarks in these bands. What timing for both the interim and final benchmarks will allow licensees adequate time to deploy their networks while also encouraging expeditious and comprehensive deployment in these bands? To the extent that commenters support a license term of other than 15 years, should such alternate license term alter the timeline on which the interim and final performance benchmarks are measured? 62. In conjunction with our proposed performance benchmarks, we seek to adopt a meaningful and enforceable penalty for failing to meet those benchmarks. When a licensee fails to meet an interim buildout requirement, the Commission commonly imposes an acceleration of the final performance benchmark as a penalty. See, e.g., 2026 Upper C-band Order at 32, para. 66 (imposing a one year acceleration of the final benchmark). We propose to impose such a penalty for licenses in these bands, and we seek comment on the appropriate period of acceleration, which may depend in part on the time period between the interim and final buildout benchmarks. For example, in Upper C-band we adopted a timeline of interim benchmark at 2 years (after the relevant Transition Deadline) and final benchmark at 6 years, with an acceleration penalty of one year, while older services with longer timelines have instead used longer acceleration periods. See 2026 Upper C-band Order at 32, para. 66; AWS-3 Report and Order, 29 FCC Rcd at 4659-60, paras.135-36 (establishing, in 2014, an interim benchmark at 6 years after license grant, a final benchmark at 12 years, and an acceleration penalty of 2 years). We propose that in the event a licensee in these bands fails to meet the final performance benchmark, its authorization for each such license shall automatically terminate without further Commission action. The Commission has adopted similar penalties for failure to meet performance requirements in other geographically licensed wireless services. See 47 CFR § 27.1505(c)(2); 900 MHz Broadband Report and Order at 29, para. 76. We seek comment as to the effectiveness of these proposed provisions to ensure prompt and meaningful deployment of service. We also seek comment on any proposed alternatives. 63. We are aware, however, of the argument that certain licensees may purposely accept the shortened final construction deadline and license term in order to delay capital expenditures and wait until the final construction deadline to deploy service. Accordingly, we seek comment on whether, in the alternative, we should require that licensees that fail to meet the interim deadline must satisfy the 45% population benchmark at some later point in the license term, in advance of the shortened final construction deadline. The licensee would remain subject to the shortened final construction deadline and license term. Failure to meet the new 45% deadline would result in automatic termination of the license. We seek comment on what the timeline for this potential fallback interim benchmark date should be. For example, if we impose the interim (45%) benchmark at 3 years after license grant and the final (80%) benchmark at 8 years after license grant, should licensees who miss the interim benchmark deadline be required to meet the 45% benchmark at 5 years after license grant? Or at some other time? We also seek comment on any proposed alternatives. 64. We further propose that, in the event a licensee’s authority to operate terminates, the licensee’s spectrum rights would become available for reassignment pursuant to the competitive bidding provisions of section 309(j). Further, consistent with the Commission’s rules for other Wireless Radio Services (WRS) licenses, including the adjacent AWS-3 and AWS-4 bands, we propose that any licensee in the 1675-1695 MHz or 2020-2025 MHz band that forfeits its license for failure to meet its performance requirements would be precluded from regaining that license in such subsequent competitive bidding procedure. See, e.g., 47 CFR § 27.14(a) (AWS-1 and AWS-3), (q)(6) (AWS-4), (r)(4) (H Block). Finally, we seek comment on whether there are other alternative buildout and enforcement mechanisms we should consider. 65. Internet of Things Performance Requirements. While a population-based metric is suitable for a wide range of mobile and fixed service offerings, there are services that are potentially less suited to a population coverage metric. As noted in the 1675-1680 MHz NPRM, terrestrial licensees providing Internet of Things (IoT) type services may benefit from an alternative performance benchmark metric, such as a performance metric based on geographic area coverage (or presence in a license area) that could allow for networks that provide a service not necessarily based on residential population coverage. 1675-1680 MHz NPRM, 34 FCC Rcd at 3566, para. 38. CTIA and EchoStar both support the addition of a geographic area metric. See EchoStar Refresh PN Comments at 4; CTIA Comments at 4. Accordingly, we seek comment on whether and how we should apply such a metric to the 1675-1695 MHz and 2020-2025 MHz bands. We seek comment on a requirement of presence in subset units of the license area, such as census tracts, counties, or some other area. Licensees would demonstrate compliance with this metric through a showing of the equipment and deployments that are part of a network providing actual service, either to external customers, or for internal uses. We seek comment on the appropriate performance metrics for IoT-type services consistent with the population-based approach. For example, would a requirement of presence in 35 percent of subset units at the interim deadline and presence in 65 percent of subset units at the final deadline provide licensees with sufficient time to satisfy their obligations, while also effectively encouraging rapid deployment? We request comment on these coverage metrics and any alternative levels of coverage that may be appropriate, including the costs and benefits of such alternatives. 66. Compliance Procedures. In addition to being subject to procedures applicable to all part 27 licensees for demonstrating compliance with performance requirements, including the filing of electronic coverage maps and supporting documentation, See 47 CFR §§ 1.946(d), 27.14(k). we propose that such electronic coverage maps must accurately depict the boundaries of each license area in the licensee’s service territory. If a licensee does not provide reliable signal coverage to an entire license area, we propose that its map must accurately depict the boundaries of the area or areas within each license area that are not being served, and not extend beyond the borders of the license area. Further, we propose that each licensee also must file supporting documentation regarding the type of service it is providing for each licensed area within its service territory and the type of technology used to provide such service, and certify the accuracy of such documentation. Supporting documentation must include the assumptions, calculations, and technical parameters used to create the coverage maps, including the propagation model and the signal strength threshold necessary to provide reliable service with the licensee’s technology. Documentation should also include GIS-compatible files depicting the claimed coverage area and the locations of the transmitters supporting that coverage. We seek comment on our proposals. 67. Our proposed band plan envisions that a provider could obtain an unpaired link to be used in conjunction with another band to provide service. For example, the unpaired link in one of the 1675-1695 MHz/2020-2025 MHz blocks could serve as uplink in conjunction with downlink in another band. This would qualify as using the 1675/2020 MHz Service license to “provide service” under our current rules; in other words, a licensee could meet its 45% interim performance requirement (and its 80% final performance requirement) by demonstrating that the band is an integral component of how the licensee is providing reliable coverage and service, consistent with our typical practice. The same would be true of a 1675/2020 MHz Service license used for downlink in conjunction with uplink in another band. We seek comment on how this approach might impact compliance with performance requirements. b. D2D Operations 68. The parallel D2D Modernization NPRM seeks comment on appropriate performance requirements for D2D services and deployments. D2D Modernization NPRM at section III.B. Given that we are proposing to authorize SCS in the 1675-1695 MHz band (assuming such use is consistent with NTIA’s findings) and in the 2020-2025 MHz band in this rulemaking proceeding, we seek comment on whether the performance requirements proposed in the companion proceeding are appropriate for D2D services in these bands, or if there are any considerations specific to the 1675-1695 MHz or 2020-2025 MHz bands that warrant a different approach. We do not propose to require D2D operators to fulfill the terrestrial performance requirements we describe above. C. Competitive Bidding Procedures 69. If we adopt a geographic area licensing scheme that allows acceptance of mutually exclusive applications, we will grant the licenses through a system of competitive bidding consistent with our statutory mandate. See 47 U.S.C. § 309(j)(1). We propose to conduct an auction for licenses for spectrum in the 1675-1695 MHz and 2020-2025 MHz bands in conformity with the part 1, subpart Q general competitive bidding rules, subject to any modification of the part 1 rules that the Commission may adopt in the future. See 47 CFR §§ 1.2101-1.2114. 70. The Commission proposed and sought comment on this approach with respect to the lower five megahertz of the spectrum at 1675-1680 MHz. 1675-1680 MHz NPRM, 34 FCC Rcd at 3567-68, para. 42. Commenters who addressed this proposal generally supported this approach, noting these rules are time-tested and would provide the simplest manner for disseminating licenses while recovering a portion of the proceeds for the U.S. Treasury. DISH Reply at 3; EchoStar Refresh PN Comments at 1-2. 71. We now expand this proposal to include the 1680-1695 MHz and 2020-2025 MHz bands to the extent that it is determined that sharing in the 1680-1695 MHz band is feasible. We seek to refresh the record on the general application of the part 1 competitive bidding rules to any auction of licenses for these bands and whether any of our part 1 rules or other competitive bidding policies would be inappropriate or should be modified for an auction of licenses in these bands. Commenters should address the costs and benefits of these proposals. 72. ORBIT Act. We tentatively conclude that there is no statutory bar to prohibit the proposal to permit the 1675-1695 MHz and 2020-2025 MHz bands to be auctioned for use by terrestrial fixed and mobile (except aeronautical mobile) services and satellite D2D operations via SCS on a secondary basis. The ORBIT Act, enacted in 2000, prohibits the Commission from “assign[ing] by competitive bidding orbital locations or spectrum used for the provision of international or global satellite communications services.” Open-Market Reorganization for the Betterment of International Telecommunications Act, Pub. L. No. 106-180, § 647, 114 Stat. 48, 57 (2000) (ORBIT Act). This prohibition, codified in section 765(f) of the ORBIT Act, was intended to prevent the imposition of auction-based licensing regimes on international satellite operators, which could lead to burdensome and duplicative auction requirements in multiple jurisdictions. See 47 U.S.C. § 765(f). We seek comment on our tentative conclusion that the ORBIT Act does not prevent our proposed auctioning of the 1675-1695 MHz and 2020-2025 MHz bands for flexible-use terrestrial services on a primary basis and SCS on a secondary basis. 73. The Commission has consistently auctioned terrestrial spectrum for flexible use, pursuant to service rules that were later amended to permit SCS on a secondary basis. See, e.g., SCS Report and Order, 39 FCC Rcd 2622. We have also granted waivers such that buildout requirements for auctioned terrestrial spectrum could be satisfied through the provision of SCS. See, e.g., para. 3 & n.4, n.5. We see no distinction between those decisions and the instant matter. The ORBIT Act is focused on prohibiting the use of auctions to assign orbital locations on the geostationary arc and it applies solely to situations where the orbital locations or spectrum is used “international[ly] or global[ly] [for] satellite communications services.” ORBIT Act, Pub. L. No. 106-180, § 647, 114 Stat. 57; 47 U.S.C. § 765(f). The ORBIT Act does not define what constitutes international or global satellite communications, and the Commission has found that it does not apply to services like Direct Broadcast Satellite (DBS) that are primarily domestic, even if they use spectrum also employed by international services such as NGSO FSS. See, e.g., FCC, Auction of Direct Broadcast Satellite Licenses, 69 Fed. Reg. 8965, 8965-66 (Feb. 26, 2004). The Commission has also maintained that the ORBIT Act does not bar auctions for terrestrial services like the Multichannel Video Distribution and Data Service (MVDDS), even when they share spectrum with international satellite services. The D.C. Circuit has issued two key rulings interpreting the ORBIT Act’s auction prohibition. In the appeal of the Commission’s decision to allocate MVDDS by auction, the court upheld the Commission’s authority to auction such licenses, finding the statute did not unambiguously ban the auctioning of those licenses and that the Commission’s interpretation that MVDDS did not fall within the ORBIT Act’s prohibition was reasonable. Northpoint Tech. v. FCC, 414 F.3d 61 (D.C. Cir. 2005). However, in the appeal of the Commission’s decision to auction DBS licenses, the court vacated and remanded that decision, holding that the Commission’s conclusion—that DBS is a purely domestic service exempt from the ORBIT Act—was not adequately supported by the administrative record. Northpoint Tech. v. FCC, 412 F.3d 145 (D.C. Cir. 2005). 74. We tentatively conclude that we may auction the 1675-1695 MHz and 2020-2025 MHz bands for flexible-use terrestrial services on a primary basis and SCS on a secondary basis in a manner consistent with the ORBIT Act. We propose to allow non-federal use of the 1675-1695 MHz band by the fixed and mobile (except aeronautical mobile) services on a co-primary basis. Moreover, non-federal use of the 2020-2025 MHz band by the fixed and mobile services is already allocated on a co-primary basis. See supra section II.D. Congress has explicitly authorized the use of auctions to assign spectrum for terrestrial services. See, e.g., Pub. L. No. 119-21, § 40002(b), 139 Stat. 72, 129 (2025). To the extent that these bands can also be used for D2D operations, such satellite operations in the bands will be conducted through a proposed secondary allocation for MSS under the SCS regime. Given the detrimental effects of lag on D2D operations, it is unlikely that any satellite D2D operations would be achievable by satellites using GSO locations and would be limited to NGSO satellites. We tentatively conclude that such secondary use of the spectrum for satellite communications, which will likely be limited to NGSO satellites, does not fall within the prohibition of the ORBIT Act. We seek comment on the foregoing. 75. Auction Features to Facilitate Competitive Bidding Among Operators with Different Use Cases. We seek comment on whether specific auction features might facilitate the highest valued use of this spectrum by enabling applicants seeking to serve different areas with different uses to compete directly for the licenses and effectively deploy services using those licenses. For example, potential licensees in this band might seek licenses on a nationwide or regional basis, possibly for the opportunity to provide broad-ranging D2D service, while others might seek licenses that cover smaller areas, such as PEAs. Do the various use cases for this spectrum present different levels of exposure risk for bidders depending on their deployment needs? Exposure risk refers to the possibility that a bidder interested in holding licenses only across multiple geographic areas ultimately wins only some of those areas, and is therefore required to pay winning bids for licenses that they cannot use. If so, can auction procedures be used to address this exposure risk even if the spectrum is licensed by smaller geographic area, such as PEAs? In particular, we seek comment on whether the assignment phase of a clock auction can be tailored to reduce the risk that winning bidders are unable to ensure contiguity of frequencies across their winning bids at a regional level. Final auction rules and procedures will be developed pursuant to the Commission’s regular pre-auction notice and comment process. We encourage robust input on the features discussed here, however, given that additional time may be needed to develop the features fully. 76. Alternatively, if the exposure risk is very significant, we potentially could accommodate different use cases of potential licensees by varying the size of the geographic area license for each block in the band (e.g., PEA for one block, REAG for another block) with service rules such as buildout obligations applying across the relevant geographic area, as discussed in the band plan section above. If all spectrum blocks are licensed using the same geographic area, we may be able to achieve similar benefits by implementing an auction feature of “bundling” those licenses within a frequency block into larger geographic areas and auction each bundle as a separate product (i.e., accept bids for areas of different sizes in different blocks). Under this approach, bidders could only bid on the defined product and would not be permitted to bid on the individual licenses within the bundle or to create their own bundles of licenses to bid on. 77. Another auction design feature that might accommodate different use cases of potential bidders would be to accept both bids on individual licenses as well as bids for a nationwide package of individual licenses in at least some of the spectrum frequency blocks, with the latter being on an all-or-nothing basis. While this would significantly reduce exposure risk for those interested in holding licenses only on a nationwide basis, would introducing novel package bidding procedures into the Commission’s established clock auction process discourage participation by bidders interested in holding license(s) only in smaller geographic areas or create other issues otherwise not present in a standard clock auction? For example, because each bidder for individual PEA licenses will have an incentive to bid up prices in order to compete with a bid for a nationwide package of PEAs, bidders may bid strategically in areas that they are not interested in to make it more likely that those other pieces bear this disproportionate burden, thereby distorting bidding and auction’s assignment of licenses. One way to address this particular issue may be to limit an acceptable nationwide package to fewer than all the available blocks. If at least some blocks must be assigned on a PEA basis, bids for those PEA blocks are more likely to reflect PEA-bidder value rather than an attempt to drive up PEA bids to compete with the nationwide package. For example, using the Commission’s familiar clock auction process, the 1675-1695 MHz frequencies could be auctioned in a clock phase as two “generic” ten megahertz blocks, with frequency assignments determined in a subsequent assignment phase. Bidders also might be allowed to bid for up to one generic ten megahertz nationwide package in the 1675-1695 MHz band in the clock phase. The auction would allocate at most only one of the generic blocks to a nationwide package bid. In other words, the auction would select at most one bid for a ten megahertz nationwide package as a winning bid (i.e., at most one of the two ten megahertz blocks would be assigned on an all-or-nothing basis) and at least one of the ten megahertz blocks in each PEA would be allocated using bids on a PEA basis. We note that, because this particular approach requires that multiple generic blocks be available for bidding in each geographic area, it could not be applied to a 5 megahertz block in 2020-2025 MHz band. Nor could it be used with the paired band plan described above. Additional features may be needed to resolve further concerns created in this scenario. For example, the all-or-nothing nature of the nationwide package bid means that reductions in demand for the package could result in unallocated individual PEA generic blocks after the clock phase. To address this concern, a supplementary auction phase might be conducted for any unallocated PEA blocks after the clock phase and before the assignment phase. 78. We seek comment on the extent to which the exposure risk associated with the Commission’s standard clock auction format is greater than usual in these spectrum bands such that it is likely to dissuade participation from bidders who may otherwise be interested in participating if they were permitted the option to bid on a nationwide package. To the extent that exposure risk associated with this spectrum is unusually high, we seek comment on the advantages and disadvantages of using any of the auction features described above to reduce that risk. To the extent that any approach helps to resolve the exposure problem, might it also create different issues that may discourage competition from bidders interested in smaller geographic areas? 79. Designated Entity Bidding Credits. We propose to make available bidding credits for designated entities for the 1675-1695 MHz and 2020-2025 MHz bands. Consistent with recent Commission auctions of 5G-capable spectrum, See, e.g., 2026 AWS-3 Auction PN, at 34, para. 96 (noting the availability of small business bidding credits in the 2026 AWS-3 auction); Auction of Flexible-Use Services Licenses in the 3.7-3.98 GHz Band for Next-Generation Wireless Services et al., AU Docket No. 20-25, Public Notice, 35 FCC Rcd 8404, 8425-26, para. 68 (OEA/WTB 2020) (noting the availability of small business bidding credits in the 2021 C-band auction). we propose to offer small business bidding credits to eligible entities, subject to a cap of no less than $25 million, as described in section 1.2110(f)(2)(ii) of the Commission’s rules. See 47 CFR § 1.2110(f)(1), (2). The precise cap will be set through the process setting auction-specific procedures. See 47 CFR § 1.2110(f)(2)(ii) (noting that a cap on small business bidding credits, no less than $25 million, will be established on an auction-by-auction basis). We propose to define a “small business” as an entity with average gross revenues for the preceding five years not exceeding $55 million and a “very small business” as an entity with average gross revenues for the preceding five years as not exceeding $20 million. See id. § 1.2110(f)(2)(i)(B)-(C). A qualifying “small business” would be eligible for a bidding credit of 15%, and a qualifying “very small business” would be eligible for a bidding credit of 25%. See id. 80. We seek comment on these proposed small business definitions and bidding credits. Are these definitions and bidding credits suitable for an auction of the 1675-1695 MHz and 2020-2025 MHz bands? We seek comment on whether the characteristics of these bands and our proposed licensing approach suggest that we should adopt different small business size definitions and associated bidding credits than we have used previously. Commenters advocating for different definitions and/or bidding credits are encouraged to identify specific circumstances and characteristics of licenses in the bands and to provide specific, data-driven arguments in support of their proposals. 81. In addition, we propose to offer rural service providers a designated entity bidding credit for the 1675-1695 MHz and 2020-2025 MHz bands. Consistent with the Commission’s approach in other bands where the spectrum is likely to be used to provide 5G services, See id. § 1.2110(f)(4). The precise cap will be set through the process setting auction-specific procedures. See id. § 1.2110(f)(4)(ii) (noting that a cap on rural provider bidding credits, no less than $10 million, will be established on an auction-by-auction basis). See, e.g., 2025 AWS-3 Report and Order, 40 FCC Rcd at 5558-59, paras. 35-37; see also 2025 AWS-3 Auction PN, 40 FCC Rcd at 1487, para. 16 (highlighting that the Commission adopted a $10 million cap on rural service provider bidding credits that may be awarded to an eligible small business in Auctions 101, 102, 103, 105, 107, 108, and 110). we propose to offer a 15% bidding credit, subject to a bidding credit cap of no less than $10 million, to any eligible rural service provider as defined in section 1.2110(f)(4)(i) of the Commission’s rules that has not claimed a small business bidding credit. See, e.g., 2025 AWS-3 Report and Order, 40 FCC Rcd at 5558-59, paras. 35-37; see also 2025 AWS-3 Auction PN, 40 FCC Rcd at 1487, para. 16 (highlighting that the Commission adopted a $10 million cap on rural service provider bidding credits that may be awarded to an eligible small business in Auctions 101, 102, 103, 105, 107, 108, and 110). 82. We seek comment on the proposed bidding credit for rural service providers. Is this bidding credit appropriate for an auction of the 1675-1695 MHz and 2020-2025 MHz bands? Commenters addressing this proposal should consider what details of licenses in the bands may affect whether rural service providers would apply for them. Those advocating for an alternative should provide data-driven arguments in support of their proposals. Finally, are there steps that we could take to promote connectivity in historically unserved or underserved areas? As one example, the Commission conducted a Tribal licensing window as part of the transition of the 2.5 GHz band to encourage deployment of communications services in rural Tribal lands. See Transforming the 2.5 GHz Band, WT Docket No. 18-120, Report and Order, 34 FCC Rcd 5446 (2019) (modified by Erratum, 34 FCC Rcd 10386 (WTB 2019)). D. Technical Rules 83. We propose to allow fixed and mobile (downlink or uplink) terrestrial operations in the 1675-1695 MHz and 2020-2025 MHz bands and to apply technical standards similar to those in other AWS bands. We also take notice of the technical rules governing the adjacent bands at 1670-1675 MHz, 1695-1710 MHz, and 2000-2020 MHz, and seek comment on how the bands we consider today can best coexist with these adjacent bands, either separately or in combination. Several commenters have advocated for aligning the technical rules for the 1675-1680 MHz band with those for the adjacent 1670-1675 MHz band. See Ligado Refresh PN Comments at 3, 9; Select Spectrum Refresh PN Comments at 2-3; Brattle Refresh PN Reply at 2. We seek to establish technical rules that will help optimize the potential uses of this spectrum while minimizing the impact on other users in these bands or in adjacent bands, consistent with the public interest. We note that these technical rules are intended to apply to terrestrial operations in these bands. 84. The separate D2D Modernization NPRM adopted today seeks comment on appropriate technical rules for D2D operations in a variety of bands under a revised SCS framework. We seek comment on how the proposals and suggestions for technical rules governing D2D operations raised in the companion D2D Modernization NPRM would apply to the 1675-1695 MHz and 2020-2025 MHz bands in the event that we permit secondary operation of SCS for these bands. D2D Modernization NPRM at section III.A.5. 1. Power Limits 85. We propose to allow fixed and base stations in both the 1675-1695 MHz and 2020-2025 MHz bands to operate up to 3280 watts/MHz equivalent isotropically radiated power (EIRP) in low-population density areas (counties with a population density of 100 or fewer persons per square mile), and up to 1640 watts/MHz EIRP in all other areas. For emission bandwidths of 1 MHz or less, the limits would be 3280W and 1640W respectively. This is also consistent with the existing rules for AWS bands. See 47 CFR § 27.50(d)(1)(i), (d)(2)(i). We propose to allow mobile and portable stations operating in these bands to operate up to 2 watts EIRP. These limits are consistent with existing power limits for the other AWS bands These power limits for fixed and base stations apply to all AWS downlink bands: 1995-2000 MHz, 2110-2155 MHz, 2155-2180 MHz and 2180-2200 MHz. 47 CFR § 27.50(d)(1), (d)(2). Operations in 2000-2020 MHz are also permitted up to these same limits pursuant to grant of a waiver. DISH Network Corporation; Petition for Waiver of Sections 27.5(j) and 27.53(h)(2)(ii) of the Commission’s Rules and Request for Extension of Time, WT Docket No. 13-225, Memorandum Opinion and Order, 28 FCC Rcd 16787, 16799-800, para. 29 (WTB 2013). For mobile and portable stations, the power limit is 1 watt EIRP in the 1695-1710 MHz, 1710-1755 MHz, and 1755-1780 MHz bands, and 2 watts EIRP in the 2000-2020 MHz band. 47 CFR § 27.50(d)(4), (d)(7). and similar to the power limits for the adjacent 1670-1675 MHz band. The power limit for 1670-1675 MHz is 2000 watts EIRP peak power for fixed and base stations and 4 watts EIRP peak power for mobile stations. 47 CFR § 27.50(f). These power limits are intended to balance the need to provide for a robust service with the ability to coexist with the incumbent services in 1675-1695 MHz, as well as to facilitate potential combined operations between licenses in 1675-1695 MHz or 2020-2025 MHz and licenses in adjacent bands. Ligado has advocated for power limits in 1675-1680 MHz matching the 1670-1675 MHz band. See Ligado Refresh PN Comments, Attach. A at 1. In the 1675-1680 MHz NPRM, the Commission proposed to adopt those power levels. 1675-1680 MHz NPRM, 34 FCC Rcd at 3569, para. 45. However, today we also consider other bands not adjacent to the 1670-1675 MHz band, and we must consider how licensees in the 1685-1695 MHz block and the 2020-2025 MHz band can potentially harmonize their operations with licenses and operations in bands adjacent to them, including the 1695-1710 MHz and 2000-2020 MHz bands. We seek comment on these proposals, including their costs and benefits. We also seek comment on any alternative power limits that commenters believe would strike a better balance between supporting robust service and supporting coexistence with incumbent services in 1675-1695 MHz specifically. To the extent that commenters support other power limits, how would those limits impact the size of the coordination zones we discuss below? See infra sections III.E.1.a, 2.a. We encourage commenters to discuss the costs and benefits of any alternative proposal. 86. The power levels surveyed for AWS services were intended to facilitate conventional mobile broadband as it is currently deployed. We seek comment on how the power levels should be set for other potential terrestrial services. For instance, this band could be used for deployments that support IoT services or industrial or private networks, such as sensor networks, which may require significantly lower power. Are there other power levels that would benefit the deployment of IoT or other services? We seek comment on this question, along with technical support for any proposed alternatives. What specific impact, if any, on incumbent operations would this power limit create? 87. We envision that the power limits proposed for D2D services in the corresponding D2D Modernization NPRM adopted today would be applicable to any subsequently authorized D2D services in the 1675-1695 MHz and 2020-2025 MHz bands. D2D Modernization NPRM at section III.A.5. Is there any deviation that would be appropriate given the specific characteristics of these bands, or any other band-specific considerations we should be aware of for D2D-specific power limits? 2. Out of Band Emissions 88. We propose an out-of-band emissions (OOBE) limit for terrestrial transmitters of all types, in both the 1675-1695 MHz and 2020-2025 MHz bands, of 43 + 10 log10 (P) dB, where P is the transmit power in watts. This limit would be measured in alignment with section 27.53(h) of our rules. See 47 CFR § 27.53(h)(3). This OOBE limit has been used to protect adjacent operations from harmful interference in several AWS services and adjacent bands operating at 1670-1675 MHz, 1695-1710 MHz, and 2000-2020 MHz. See 47 CFR § 27.53. An extension of the same emission limit to the 1675-1695 MHz and 2020-2025 MHz bands would appear to enhance their compatibility with existing bands. This is also the OOBE limit recommended by NTIA for 1675-1680 MHz. 2026 NTIA Identification Letter at 3 (recommending the same OOBE limit as applies to 1670-1675 MHz). That limit is also 43 + 10 log10 (P) dB. 47 CFR §27.53(k). We seek comment on whether there are any services in adjacent bands that might require more stringent protection to prevent harmful interference, such as space-based receivers above 2025 MHz. We seek comment on our proposed OOBE limit, including its costs and benefits, and those of any proposed alternatives. 89. We note that Ligado has suggested a stricter emissions limit, an attenuation of at least 70 + 10 log10 (P) dB, for emissions below 1675 MHz specifically, unless the licensee either establishes unified operations across the entire 1670-1680 MHz band or enters into a private agreement with the licensee of the 1670-1675 MHz band. See Ligado Refresh PN Comments, Attach. A at 1-2; Ligado Reply Comments at 21-22. Is such a limit necessary to protect operations in the 1670-1675 MHz band? Would such a limit at the band edge allow typical terrestrial operations, similar to those deployed in other AWS bands, in the 1675-1685 MHz block? Would that limit materially change the potential value or utility of the 1675-1685 MHz block as compared to the 1685-1695 MHz block? The AWS-4 OOBE limits into H Block, which Ligado references as a comparison, were established to balance the competing needs of potential licensees in each band, and to maximize the overall economic value and usefulness of the spectrum. Ligado Reply Comments at 21-22; Service Rules for Advanced Wireless Services in the 2000-2020 MHz and 2180-2200 MHz Bands et al., WT Docket No. 12-70 et al., Report and Order and Order of Proposed Modification, 27 FCC Rcd 16102, 16135, paras. 79-80 (2012) (AWS-4 Order). We note that while AWS-4 licensees were held to an emissions limit of 70 + 10 log10 (P) dB at the band edge, as Ligado would have us do here for licensees in the 1675-1685 MHz block, H Block licensees were in return held to that same limit starting at 2005 MHz, while Ligado is not required to comply with a similar limit starting at 1680 MHz in this case. See AWS-4 Order, 27 FCC Rcd at 16135, para. 79; H Block Report and Order, 28 FCC Rcd at 9508, para. 63; 47 CFR § 27.53(k) (requiring that “the power of any emission outside the licensee’s frequency band(s) of operation shall be attenuated below the transmitter power (P) by at least 43 + 10 log (P) dB”). Would Ligado’s suggested OOBE limit better support these goals than our generally proposed limit of 43 + 10 log10 (P) dB? We seek comment on the costs and benefits of each of these options for the OOBE limit below 1675 MHz. 90. We also seek comment on any additional OOBE limits that may be necessary to protect Global Positioning System (GPS) signals centered on 1575.42 MHz. This GPS band is a significant spectral distance away from the bands under consideration in this item, and it is unlikely that transmissions meeting the OOBE limit we propose generally will exceed the established 3GPP limits on spurious emissions into “protected bands” such as GPS. The applicable 3GPP standards specify a limit of -50 dBm/MHz for user equipment and -52 dBm/MHz from base stations. See 3GPP TS38.101-1 NR, User Equipment (UE) radio transmission and reception, Part 1: Range 1 Standalone, Section 6.5.3 and Table 6.5.3.2-1; 3GPP TS38.104 NR, Base Station (BS) radio transmission and reception, Section 6.6.5 and Table 6.6.5.2.3-1. However, GPS is a critical service and ensuring its protection is a priority. In addition to the general OOBE limit we propose above, should we also require compliance with the established 3GPP protection levels for spurious emissions into this GPS band? 91. Recognizing the potential use of this band with the adjacent AWS bands, we propose to allow a licensee in this service to enter into a private agreement with a licensee in any of the 1670-1675 MHz, 1695-1710 MHz, or 2000-2020 MHz bands to allow the 43 + 10 log10 (P) dB OOBE limit of either licensee to be exceeded within the other party’s band. We propose that a licensee that is a party to such an agreement must maintain a copy of the agreement and disclose it, upon request, to prospective assignees, transferees, or spectrum lessees, and to the Commission. See, e.g., 47 CFR § 27.53(a)(10), (h)(4), (m)(7). Similar to our approach to emissions limits in AWS-4, to the extent that a licensee establishes unified operations in blocks within these and an adjacent band, we propose that such a licensee may choose not to observe the OOBE limit, strictly between its adjacent block licenses in a geographic area, so long as it complies with other Commission rules and is not adversely affecting the operations of other parties by virtue of exceeding the limit. Id. § 27.53(h)(4)(i). Compliance with this emission limit would be based on the measurement procedures described in paragraph (a)(5) of section 27.53 of the Commission’s rules. Id. § 27.53(a)(5). We seek comment on this proposal. 92. We anticipate that the proposed D2D-specific OOBE limits proposed in today’s companion D2D Modernization NPRM would be applicable to any future D2D operations in these bands. See D2D Modernization NPRM at section III.A.5. We seek comment on whether any band-specific characteristic of the 1675-1695 MHz or 2020-2025 MHz bands warrants a different approach to OOBE limits than the standard approach teed up in that item. 3. Antenna Height 93. We propose not to adopt a limit on the height of antennas for either fixed or base stations throughout the 1675-1695 MHz and 2020-2025 MHz bands. Current part 27 rules do not impose any height limit on fixed or base stations in AWS services operating above 1 GHz, See, e.g., AWS-3 Report and Order, 29 FCC Rcd at 4641, paras. 77-78 (declining to adopt specific antenna height limitations for the AWS-3 band because base station antenna heights are effectively limited by (1) the requirement to limit antenna heights to elevations that do not present a hazard to air navigation, 47 CFR § 27.56; (2) the limitations on field strength at the edge of a licensee’s geographic service area, id. § 27.55(a); and (3) the need for spectral reuse); Service Rules for Advanced Wireless Services in the 2000-2020 MHz and 2180-2200 MHz Bands, WT Docket No. 12-70, Report and Order and Order of Proposed Modification, 27 FCC Rcd 16102, 16162, para. 154 (2012) (same). with the exception of a limit of 10 meters above ground for fixed stations in the AWS-1 band. 47 CFR § 27.50(d)(4). There are no antenna height limits in the adjacent 1670-1675 MHz band, or in the 1695-1710 MHz or 2000-2020 MHz bands. We note, however, that our rules require notification to the Federal Aviation Administration for the construction or alteration of structures more than 60.96 meters (200 feet) in height above ground level at the site. 47 CFR § 17.7. This approach was also proposed in the 1675-1680 MHz NPRM, and no commenter has opposed it. See 1675-1680 MHz NPRM, 34 FCC Rcd at 3571, para. 51. Any antenna height limits necessary to facilitate deployment within coordination zones will be defined as part of the coordination process for each site. We seek comment on this proposal, including any costs or benefits or any considerations specific to these bands that may warrant different treatment in this regard. 4. Power Limits at Market Boundary 94. We propose to limit a licensee’s predicted or measured field strength to a power flux density (PFD) of −76 dBm/m2/MHz at any location along or beyond the border of its license area. While in the 1675-1680 MHz NPRM we proposed to use the same limit as is currently applied to the other AWS bands (47 dBµV/m), See id. at 3571, para. 50; 47 CFR § 27.55(a)(1). the PFD paradigm we propose today is more straightforward to calculate or measure, and also scales with channel bandwidth to provide licensees flexibility for demonstrating compliance. See 2026 Upper C-band Report and Order, at 39, para. 79. Both the PFD paradigm and this specific limit have been adopted in recent years for the 3.45 GHz Service and Upper C-band. See 3.45 GHz Report and Order, 36 FCC Rcd at 6020, para. 93; 2026 Upper C-band Report and Order at 39, para. 79. We also propose to allow licensees to exceed this limit with the permission of the relevant adjacent licensee(s). We seek comment on these proposals, including on the use of the PFD metric and on the specific level proposed. 5. Uplink/Downlink 95. We propose to allow terrestrial and D2D licensees to use both the 1675-1695 MHz and 2020-2025 MHz bands as either uplink, downlink, or TDD, with no restriction in this regard. It is our general policy to allow licensees maximum flexibility to operate either uplink or downlink in their licensed spectrum, consistent with appropriate protection of incumbent services. While some commenters are skeptical that terrestrial downlink in the 1675-1680 MHz band would be consistent with adequate protection of federal incumbent uses, See AGU et al. Refresh PN Comments at 4; ASRI/IATA Refresh PN Reply at 7. NTIA specifies that the band is suitable for terrestrial use as uplink or downlink, provided that we impose the same OOBE limit as applies to the 1670-1675 MHz band, which we propose to do above. See 2026 NTIA Identification Letter at 3; supra section III.D.2. Ligado has also advocated for allowing uplink, downlink, and TDD operations in the 1675-80 MHz band, emphasizing that this would be consistent with the conclusions in SPRES-FO. See Ligado Refresh PN Comments at 9-10. We also note that NTIA is continuing to study the 1675-1695 MHz band for suitability for commercial use, including D2D use. 2026 NTIA Identification Letter at 3; see NTIA, Band Repurposing Studies, https://www.spectrum.gov/band-repurposing-studies (last visited July 17, 2026) (highlighting repurposing studies for four spectrum bands, including the including the 1675-1695 MHz band, under the OBBB Act). How should that study inform our conclusions, particularly if it finds downlink in the 1680-1695 MHz portion of the band to be feasible, as the previous study found for the 1675-1680 MHz band? We seek comment on our proposal, including its costs and benefits. We also seek comment on, as an alternative, whether it would be beneficial to restrict some blocks to either uplink or downlink in order to facilitate coexistence with adjacent bands or blocks and reduce the potential for harmful interference. For example, should we require the 1675-1685 MHz block and the 1685-1695 MHz block to be used as both uplink, or both downlink, in order to reduce the risk of harmful interference between licenses at 1685 MHz? Should we treat D2D services differently than terrestrial services in this regard? Are there specific considerations, including impact on adjacent or in-band incumbent services, that should inform our analysis? We seek comment below on the potential use of guard bands or other coordination mechanisms to protect adjacent-band services, and on how uplink versus downlink in these bands might affect that issue. See infra paras. 123, 126. Finally, we seek comment on whether we should adopt any technical rules specific to either terrestrial or D2D uplink, downlink, or TDD operations, including the costs and benefits of doing so. 6. Other Technical Issues 96. Part 27 contains several additional technical rules applicable to all part 27 services, including equipment authorization, RF safety, frequency stability, antenna structures, and air navigation safety. 47 CFR §§ 27.51, 27.52, 27.54, 27.56. We propose that all of these part 27 technical rules should apply to all licenses and licensees in the 1675-1695 MHz and 2020-2025 MHz bands, including licensees who acquire their licenses through partitioning or disaggregation. We seek comment on this approach, including its costs and benefits and those of any suggested alternatives. 97. We also seek comment on whether to impose an interoperability requirement across the 1675-1695 MHz and 2020-2025 MHz bands, as the Commission has done for certain other part 27 services, in order to facilitate greater equipment availability, especially in the 2020-2025 MHz band, and to better support the possibility of licensees using multiple licenses in these bands in conjunction. See 47 CFR § 27.75. Existing interoperability rules in part 27 require mobile and portable stations used in the covered bands (here, 1675-1695 MHz and 2020-2025 MHz) to be capable of operating across these bands using the same air interfaces that the equipment uses on any frequency in the bands, without requiring licensees to use any particular industry standard. See id. Would such an interoperability requirement be useful or necessary in these bands to promote equipment availability in either band portion? Would the cost of complying with such a requirement outweigh any benefits to licensees or to consumers? E. Coordination and Protection of Incumbent and Adjacent Operations 1. 1675-1680 MHz 98. The major incumbent use of the 1675-1680 MHz band is the DCS associated with the GOES-R satellite system operated by NOAA. NTIA SPRES-FO Report at 14. DCS operates at 1679.7-1680.1 MHz and functions as the downlink for the GOES-R satellites, receiving and disseminating critical real-time information on weather, hydrologic and other environmental conditions, and solar activity to a range of federal, state and local government, and private sector users. Id. The GOES-R satellite constellation is expected to operate through 2036 before being replaced by a successor constellation, GeoXO, which will operate its downlink at 1691.9 MHz. NTIA SPRES-FO Report at Fig. 2; NOAA, Geostationary Operational Environmental Satellites (GOES)-R Series, https://www.ncei.noaa.gov/products/satellite/goes-r (last visited Oct. 6, 2026). The GRB also operates in conjunction with the GOES-R satellites nearby at 1681.15-1692.05 MHz. NTIA SPRES-FO Report at 14. 99. NOAA and NTIA have undertaken a series of studies examining the potential for sharing or reallocating the 1675-1680 MHz band for private sector use. In 2022, NOAA released the SPRES Report, which examined potential harmful interference from commercial LTE deployments into DCS downlink sites and other NOAA systems, as well as potential mitigation measures and alternative data distribution possibilities. See generally SPRES Report. In 2024, NOAA released the SPRES-FO Report, which refined the analysis of the SPRES Report and elaborated on the details of a potential alternative distribution system (ADS) to replace many of the DCS downlink sites and thereby reduce the overall coordination burden on private sector licensees. See generally SPRES-FO Report. In conjunction with the SPRES-FO Report, NTIA released a report focusing on a potential coordination methodology to protect the remaining DCS downlink sites. See generally NTIA SPRES-FO Report. In February 2026, NTIA submitted a letter to the FCC formally identifying the 1675-1680 MHz band for commercial use under the mandate of the OBBB Act and identifying the four DCS downlink sites to be protected on a continuing basis. 2026 NTIA Identification Letter at 1, 2. 100. We note that this section is focused primarily on coordination of terrestrial operations with both federal in-band incumbents and services in adjacent bands. We acknowledge that D2D systems will also require coordination to successfully coexist with federal incumbents specifically, and possibly with adjacent-band operations as well. The D2D Modernization NPRM seeks comment on appropriate coordination mechanisms for D2D operations. See D2D Modernization NPRM at section III.A.5. We propose to implement the coordination procedures developed by the D2D Modernization proceeding in the 1675-1695 MHz and 2020-2025 MHz bands as well. We seek comment on this proposal, and on whether any band-specific coordination rules are necessary here in addition to that general framework. a. Coordination Process 101. We propose to require that commercial licensees coordinate their terrestrial operations with federal incumbent operations in this band through the use of coordination zones. Specifically, we propose to define coordination zones around the four DCS receive sites identified in the 2026 NTIA Identification Letter (at Fairmont, WV; Sioux Falls, SD; Suitland, MD; and Wallops, VA), and require that commercial licensees seeking to deploy within those zones first successfully coordinate with NTIA. 2026 NTIA Identification Letter at 2. We also propose to adopt the protection criteria for these DCS sites developed in the SPRES Report and as set out in the NTIA SPRES-FO Report. That is, the harmful interference threshold, above which receiver performance will begin to degrade. SPRES Report at 315-338; NTIA SPRES-FO Report at 22. We seek comment on these proposals, including the costs and benefits of the use of coordination zones as well as any suggested alternatives, including with respect to adding a secondary MSS allocation for SCS in the space-to-Earth direction to these bands. 102. We seek comment on how to define the radius or contours of the coordination zones around the four DCS sites. In its 2024 report, NTIA set out a process for calculating this radius by modeling likely terrestrial deployment and then drawing a circle around each receive site based on the likely aggregate interference from this modeled deployment into the receive site itself. NTIA SPRES-FO Report at 32-36. Inputs into this process included assumptions about terrestrial deployment, clutter and propagation models, and the harmful interference threshold calculated for both DCS and GRB receivers. Id. at 20-22 (parameters for commercial equipment), 28-31 (models for terrestrial deployment). NTIA used the Irregular Terrain Model (ITM) as the propagation model, and Recommendation ITU-R P.2108 to calculate clutter. See id. at 21, 25. Specifically, the NTIA SPRES-FO Report assumed a base station EIRP of 65 dBm, a base station downtilt of 0 degrees, a base station azimuth pointing directly at the relevant federal location, a base station height of 30 meters, and a downlink load of 100%. Id. at 20. We seek comment on each of these inputs and variables, and especially on appropriate assumptions with respect to likely terrestrial deployment. By NTIA’s own admission, the assumptions in the NTIA report are designed to be conservative. Id. at 20 (stating that “[t]he simulation inputs for this analysis were chosen to provide an upper bound for the regulatory constraints”). Would assumptions that more closely track actual terrestrial deployment in nearby bands be more appropriate here? In the earlier SPRES Report, NOAA used data from real world AWS deployments, among other sources, to calculate exclusion zone contours. SPRES Report at 64-66. A summary of the differences between the SPRES report and NTIA report assumptions may be found at NTIA SPRES-FO Report at 20-21. Would that set of assumptions be a better choice for calculating the coordination zone contours we propose today? 103. We do not propose the use of any secondary or additional dynamic coordination zones around the other DCS sites, such as those described in the SPRES and SPRES-FO reports, due to the complexity of such a system, the corresponding potential difficulties of its implementation, and the planned development of an alternative data distribution system (ADS) to replace the functionality of those other receive sites. The SPRES Report described a dynamic system in which static exclusion zones would be fixed at a radius corresponding to typical aggregate interference potential, with additional dynamic exclusion zones or sectors which would activate during periods of atmospheric conditions conducive to “ducting,” requiring terrestrial deployments within those areas to cease transmission while such ducting conditions exist. SPRES Report at 84-87. Atmospheric ducting significantly increases the range within which terrestrial deployment can contribute to aggregate interference at a particular site. SPRES Report at 69-71. The SPRES-FO Report proposed static coordination zones for the four specified DCS receive sites and dynamic coordination zones for all other DCS receive sites, which would be activated only during “enhanced” conditions, such as a significant weather event, that would put the DCS user at a heightened operating status and potentially require the reliability of direct access to DCS data rather than access through the ADS. SPRES-FO Report at 102-104. However, to the extent that commenters believe that dynamic coordination zones could be feasible, we seek detailed comment on how such coordination zones, or other alternative coordination process, could be effectively and efficiently implemented. 104. We also seek comment on how, if at all, the potential inclusion of D2D services in this band should inform the coordination process, especially in terms of establishing the contours of the coordination zones for operations. In the separate D2D Modernization NPRM, we seek comment on coordination and interference resolution for D2D operations. D2D Modernization NPRM at section III.A.5. We seek comment on whether to apply those proposals to the 1675-1695 band, and to what extent the band-specific issues discussed here impact coordination for D2D services. For example, if D2D services are ultimately authorized for this band, are coordination zones also the appropriate mechanism to manage coexistence between federal incumbents and D2D operations? Assuming coordination zones are used, would inclusion of D2D services require any change in the process of coordination or how the coordination zone contours for terrestrial operations are calculated? As noted above, NTIA’s process for calculating coordination zones begins with modelling likely aggregate interference. NTIA SPRES-FO Report at 34. Would it be necessary to include likely D2D transmissions or deployment in these calculations? If so, what specifications or assumptions about D2D deployments, equipment, and transmissions would be the appropriate inputs for these calculations? Conversely, can the D2D coverage and service areas as currently contemplated by industry be sufficiently controlled so that the coordination mechanisms for terrestrial services and D2D services should be considered separately? We note that the parallel D2D Modernization NPRM seeks comment on appropriate coordination mechanisms and interference resolution for D2D operations generally. See D2D Modernization NPRM at section III.A.5 (seeking comment on streamlined mechanism to address coordination and interference issues among prospective D2D licensees, adjacent band operators, and co-channel operators). 105. We also seek comment on what coordination measures, if any, are necessary to protect incumbents below 1675 MHz. Ligado has suggested that, in the absence of successful coordination or private agreement with adjacent incumbents, licensees in this band should be restricted to minimal power levels below 1678 MHz (fixed and base stations) and 1679 MHz (mobile and transportable stations). Ligado Refresh PN Comments, Attach. A at 1. We seek comment on what coordination measures might protect adjacent incumbents without unduly burdening 1675-1695 MHz licensees. We encourage commenters to discuss the costs and benefits of any suggested approach. b. Guard Bands 106. As a complement or an alternative to the coordination mechanism we propose above, we also seek comment on the use of guard bands to protect federal operations while affording commercial entrants the greatest possible flexibility for deployment. Both the SPRES Report and the NTIA SPRES-FO Report suggest that leaving a guard band of 250 kilohertz below the bottom edge of the DCS downlink band at 1679.7 MHz (that is, beginning at 1679.45 MHz) would meaningfully reduce the likelihood of harmful interference into the remaining four DCS receivers and allow commercial operations to deploy closer to the receive sites. SPRES Report at 93-95; NTIA SPRES-FO Report at 49-50. We seek comment on this suggestion, including its technical feasibility and potential costs and benefits. 107. Specifically, we seek comment on whether a guard band would offer any additional benefit in conjunction with the coordination mechanism proposed above. If we establish coordination zones around the four DCS receive sites, would imposing a guard band for all transmitters, including those outside the coordination zones, provide any additional protection to the receive sites? Could it allow those coordination zones to be smaller and still adequately protect the receive sites from harmful interference? Or would a guard band potentially be a complete substitute for coordination zones, allowing them to be reduced to a minimal radius or perhaps eliminated entirely? We note that the NTIA SPRES-FO Report mentions guard bands as a potential mitigation measure allowing commercial licensees to deploy closer to the receive sites within the coordination zones. See NTIA SPRES-FO Report at 47, 49-50. If there is minimal benefit to establishing a guard band for transmitters outside the coordination zones, and the primary function of a guard band would be to allow commercial stations to deploy closer to DCS receivers within a coordination zone, should we establish such a guard band in our rules at all, or is this matter more efficiently handled by coordination between NTIA and the commercial operator(s)? To the extent that commenters support the adoption of a guard band, we also seek comment on whether the 250 kilohertz width discussed by NOAA and NTIA would be the appropriate size, or whether a smaller or larger guard band would offer a better combination of costs and benefits. 108. We also seek comment on the applicability of guard bands to potential D2D services in this band. Is there any reason to adopt guard bands in the terrestrial context but not for D2D services, or vice versa? Should any guard band for D2D services be identical to those applicable to terrestrial operations, or should they be smaller or larger? Should the presence or size of the guard band vary depending on whether the operations are in the downlink or the uplink direction, either for D2D or for terrestrial operations? We seek comment on the costs and benefits of these options. c. Alternative Data Distribution System 109. Per NTIA’s 2026 Identification Letter, all current DCS sites other than the four remaining protected sites would transition to a non-spectrum-based ADS in order to retain necessary distribution functionality without requiring interference protection at those sites. 2026 NTIA Identification Letter at 2. We agree that use of this ADS, as developed and operated by NOAA, will allow greater availability and more efficient use of this band. We seek comment on how to effectuate this proposal. 110. The SPRES-FO Report provides preliminary estimates of the cost of modifying the downlink sites and operating the new distribution system. SPRES-FO Report at 74-81. NTIA will provide an updated cost estimate to the Commission six months prior to any auction of this spectrum. 2026 NTIA Identification Letter at 3. We seek comment on the preliminary SPRES-FO cost estimates with respect to implementation, operation, and maintenance of this system. Have any estimated system requirements or components changed since the SPRES-FO Report was compiled? How have the costs of hardware, software, or other system components and inputs changed in that time? 111. We also seek comment on the likely timeline for deployment of the ADS and the logistics of the transition. How soon would this system be available for current users? What accommodations might be required of licensees in the initial transition phase, to ensure that current users’ access to mission critical data is not interrupted? What effect, if any, should such accommodations have on our rules and requirements for licensees, such as the timeline for meeting buildout requirements? We encourage commenters to discuss the costs and benefits of any suggestions. 112. We also seek comment on how the ADS should be funded. Should the initial transition costs be borne by the auction winner(s)? Should the operational costs? For what period of time? Ligado has suggested that the licensee should be obligated to fund “the design, deployment, and operation of the [ADS] over the initial ten-year license term” as a condition of the license. Letter from Gerard J. Waldron, Counsel to Ligado Networks LLC, to Marlene H. Dortch, Secretary, FCC, WT Docket No.19-116, 6, Attach. at 2 (filed Jan. 16, 2026). Would this be the optimal funding mechanism? We note that we seek comment above on the appropriate geographic area for licenses in the 1675-1695 MHz band, including on PEAs and EAs. If there are multiple auction winners across different geographic areas, how should ADS costs be apportioned between them? If there are D2D operators distinct from the terrestrial licensee(s), how, if at all, should they be included in any such apportionment? Alternatively, should a federal entity be responsible for funding the ADS? 113. Finally, we seek comment on how the ADS or its implementation may be structured to address concerns about its adequacy as a substitute for the current distribution system, especially in the matter of latency and reliability. See, e.g., Satellite Telemetry Interagency Working Group Refresh PN Comments at 2 (rec. Feb. 28, 2025); AGU et al. Refresh PN Reply Comments at 3 (rec. Mar. 18, 2025); ASRI/IATA Refresh PN Reply at 8; Letter from the American Meteorological Society et al., to Marlene H. Dortch, Secretary, FCC, WT Docket No. 19-116 et al, at 2 (filed Sept. 13, 2022). Are there any solutions that would complement or augment an Internet- or cloud-based system that would satisfy these concerns? Are there specific parameters of an Internet- or cloud-based system that would address these concerns? We encourage any commenters suggesting alternative or additional solutions to discuss the benefits and costs of such alternative system as compared to NOAA’s proposed methodology. 2. 1680-1695 MHz 114. There are several federal incumbents currently operating in the 1680-1695 MHz band: the DCS sites discussed above in the context of the 1675-1680 MHz band, whose transmissions extend up to 1680.1 MHz; the GRB service, operating from 1681.15-1692.05 MHz; and the High-Rate Information Transmission (HRIT), operating at 1693.5-1694.7 MHz. NTIA SPRES-FO Report at 14-15. The SPRES and SPRES-FO Reports did not analyze HRIT systems, because “spectrum sharing [in 1675-1680 MHz] presents low risk of causing impacts to HRIT given the frequency separation” between 1675-1680 MHz and the bottom of edge of HRIT at 1693.5 MHz. NTIA SPRES-FO Report at 9. In addition, the next-generation GeoXO satellite system will operate its downlink at 1691.9 MHz once it is deployed in approximately 2035. NTIA SPRES-FO Report at 14, Fig. 2. NTIA and other federal agencies are currently studying this band for potential repurposing for both traditional commercial deployments and D2D. 2026 NTIA Identification Letter at 3. In anticipation of this forthcoming report, we seek comment on how best to coordinate with these existing and planned federal operations while facilitating expeditious and efficient commercial deployment in these bands. a. Coordination Mechanism 115. Foundationally, we propose to adopt the same coordination mechanism for this portion of the band as the one we propose above for the 1675-1680 MHz band: a small number of coordination zones around key incumbent sites, with licensees required to coordinate with NTIA for deployments within those zones and unencumbered by coordination requirements outside them. As with the 1675-1680 MHz band, such a system requires identifying key sites to be protected, as well as appropriate protection criteria for those sites and appropriate models and assumptions from which to calculate the contours of the coordination zones. We seek comment on each of these aspects of coordination, as well as any additional considerations needed in light of our proposed secondary MSS allocation for SCS in the space-to-Earth direction in these bands. 116. First, we seek comment on which sites would need to be protected. This applies to both the current GRB and HRIT sites, as well as future GeoXO downlink sites, which are scheduled to begin operation before the end of a hypothetical 15-year license term in this band. The DCS receive sites to be protected are those already specified in the Identification Letter—their protection will extend to the 1680-1695 MHz portion of the band as well. See 2026 NTIA Identification Letter at 2. There are currently 25 GRB receive sites and 17 HRIT receive sites in the United States, several of which are combined with each other or with GOES-R DCS receive sites. See NTIA SPRES-FO Report at 15-16. We note that the four protected GOES-R DCS sites also operate GRB receivers (at Fairmont, WV, and Wallops, VA) and HRIT receivers (all four sites). Id. Would it be possible to use only these sites for GRB and HRIT operations, and transfer other sites to an ADS like that contemplated for the other DCS sites? Would it be possible to use that ADS, specifically, to replace any GRB or HRIT sites, or would those systems require development of their own, separate ADS? What would be the timeline for such development and transition? With regard to the GeoXO receive sites, have those sites already been identified? If so, will they be the same as the current DCS sites, or will they be located elsewhere? If the coordination zones for the future GeoXO sites will be different from the current protected DCS sites, either in size or location, how should those future zones be treated? Should a commercial licensee be allowed to deploy or operate in those areas before GeoXO is active (and then potentially be required to cease operation in those areas once it is)? Conversely, should licensees be required to coordinate with NTIA with respect to the GeoXO receive sites, even before they are active, to avoid a situation where commercial operations deployed before GeoXO is launched are situated such that they cause harmful interference to the receive sites once the receive sites go live? 117. Second, we seek comment on the appropriate protection criteria or threshold for any GRB or HRIT sites that cannot be transitioned to an ADS, as well as for the forthcoming GeoXO downlink sites. We acknowledge that this question will likely be a subject of NTIA’s forthcoming report on potential sharing in this band, and welcome such input when it arrives. We also seek any comment on this matter that may currently be available. NOAA and NTIA have already identified harmful interference thresholds for both DCS and GRB receivers. Id. at 22. Are the relevant thresholds for HRIT and GeoXO downlink similar, or are those services or receive sites more or less sensitive? Are these services and receive sites also subject to the effects of atmospheric ducting discussed in the context of GOES-R DCS? See SPRES Report at 69-71. 118. Third, we seek comment on the appropriate assumptions and specifications for modeling commercial deployments in order to calculate the appropriate size and shape of the coordination zones. As with the 1675-1680 MHz band, with respect to terrestrial deployments we seek comment on the methodology and assumptions contained in the SPRES Report See id. at 64-66. and the more restrictive assumptions used by the NTIA SPRES-FO Report, NTIA SPRES-FO Report at 20-21. as well as any alternatives. Is there any reason to use a different set of assumptions about terrestrial deployment in this portion of the band (1680-1695 MHz) as compared to the 1675-1680 MHz portion of the band, or should the coordination zones in each portion of the band be calculated in the same way? We seek comment on the costs and benefits of the SPRES Report paradigm, the NTIA SPRES-FO Report paradigm, and any suggested alternative. As with the 1675-1680 MHz band, we also seek comment on the extent to which potential D2D deployment should inform the use of coordination zones and the calculation of coordination zone contours, as well as the appropriate assumptions or inputs regarding D2D deployments that should be used for that purpose. 119. Finally, we note that the parallel D2D Modernization NPRM seeks comment on appropriate coordination mechanisms for D2D services generally, but we encourage commenters here to discuss D2D coordination as it relates to the specifics of this band and the NOAA incumbents. D2D Modernization NPRM at section III.A.5. Are the coordination zones we propose above also the appropriate mechanism to manage coexistence between federal incumbents and D2D? Is there another mechanism that would strike a better balance between support for broad D2D availability and protection of these critical weather systems? How should D2D downlink, specifically, be coordinated or managed to avoid causing interference to federal receivers? We encourage commenters to highlight potential opportunities or challenges of any suggested or opposed mechanism, including any specific capabilities of D2D systems that would suggest any particular mechanism over another. b. Guard Bands 120. As a complement or an alternative to the coordination mechanism we propose above, we also seek comment on the use of guard bands in this band to protect federal operations while affording commercial entrants the widest possible flexibility and efficiency for deployment. Given the wide spectral footprint of the current GRB sites (1681.15-1692.05 MHz), in addition to HRIT and the upper edge of DCS above 1680 MHz, a guard band solution for 1680-1695 MHz does not appear to be realistic as a complete solution while all of these GOES-R receive services are operating. However, after these services are retired along with the GOES-R constellation, or if the GRB sites can be universally transitioned to an ADS, the spectral footprint would shrink considerably. We seek comment on the potential use of guard bands under those circumstances. 121. We seek comment on the use of guard bands above DCS, around the future GeoXO downlink, and potentially around HRIT at 1693.5-1694.7 MHz if any such sites cannot be transitioned. Would guard bands around any or all of these services be necessary to protect these services from harmful interference, or make coordination with commercial operations easier? If commenters support the adoption of guard bands around any or all of these services, what would be the appropriate size? Would the 250 kilohertz offset suggested by NOAA and NTIA for the lower edge of GOES-R DCS also be the appropriate size for the upper edge of that service? For the GeoXO DCS and/or HRIT? Or would some other size be more appropriate? 122. As with the 1675-1680 MHz band, we also seek comment on how guard bands might be combined with coordination zones. Should a guard band be applied only within coordination zones? If applied everywhere, would they reduce the necessary size of coordination zones, or potentially eliminate the need for them entirely? Alternatively, if there is minimal benefit to additional spectral separation outside of coordination zones, and their primary function would be to allow commercial operators to deploy closer to protected receive sites, should we establish such guard bands in our rules at all, or is this matter more efficiently handled by coordination between NTIA and the commercial operators? We seek comment on these possible solutions, including the costs and benefits of each. 123. We also seek comment on the applicability of guard bands to potential D2D services in this band. Is there any reason to adopt guard bands in the terrestrial context but not for D2D services, or vice versa? Should any guard band for D2D services be identical to those applicable to terrestrial operations, or should they be smaller or larger? Should the presence or size of the guard band vary depending on whether transmissions are in the downlink or the uplink direction? We seek comment on the costs and benefits of these options. 124. Finally, we seek comment on whether a guard band would be necessary or beneficial to prevent interference into the adjacent 1695-1710 MHz band. We propose above to allow licensees in the 1675-1695 MHz band to use their spectrum for their choice of uplink, downlink, or TDD. See supra section III.D.5. In the event that the 1685-1695 MHz block is used for downlink, should we establish a guard band below 1695 MHz? If so, how wide should such a guard band be? Should this vary depending on whether the operations are uplink or downlink? Is there any other coordination mechanism or requirement, either instead of or in conjunction with a guard band, that would be useful or necessary in preventing harmful interference between operations in the 1675-1695 MHz and 1695-1710 MHz bands? How should we balance the need to protect operations above 1695 MHz with the need to avoid unduly burdening licenses in the 1685-1695 MHz block? 3. 2020-2025 MHz 125. While there are no regularly licensed incumbent users in this band, we seek comment on whether coordination measures are necessary with respect to operations in adjacent bands, such as Electronic News Gathering (including the Broadcast Auxiliary Service (BAS)) and various federal operations above 2025 MHz (including Space Operation, EESS, and Space Research), as well as both federal and non-federal Space Launch operations. 47 CFR § 2.106. 126. We seek comment on what coordination measures, if any, are necessary to protect federal and non-federal operations above 2025 MHz. Are there specific sites that may require coordination in their immediate areas, such as satellite earth stations or space launch facilities? How should licensees in 2020-2025 MHz coordinate with BAS operations above 2025 MHz, which may deploy dynamically and with short notice? What measures may be necessary to protect Space Operation uplinks to space-based receivers in 2025-2110 MHz? Does the potential for D2D operations in this band alter any coordination needs with respect to adjacent-band operations, such as protection of space-based receivers? 127. We also seek comment on what coordination measures, if any, are necessary to ensure that both terrestrial and D2D operators in this band and in the 2 GHz MSS/AWS-4 band below 2020 MHz do not cause harmful interference to one another. SpaceX is authorized to operate D2D services in the 2000-2020 MHz band in the space-to-Earth direction, except in the U.S. Virgin Islands and Puerto Rico, where the authorization is for the Earth-to-space direction. SpaceX D2D Authorization. Should we impose these same directional limits, or their terrestrial equivalents, on operations in the 2020-2025 MHz band? Alternatively, should we authorize TDD or bidirectional use in this band, which we propose to license unpaired? F. Canada/Mexico Coordination 128. Our part 27 rules currently provide that the AWS bands adjacent to the bands in this proceeding are subject to international coordination agreements with Mexico and Canada. 47 CFR § 27.57(c). We propose to use this approach for the 1675-1695 MHz and 2020-2025 MHz bands as well. Until any adjustments are made to agreements between the United States, Mexico and/or Canada, operations in these bands must not cause harmful interference across the border, consistent with the terms of the agreements currently in force. See FCC, International Agreements, https://www.fcc.gov/general/international-agreements (last visited Oct. 6, 2026). We note that our proposed rules, and any rules that may ultimately become effective pursuant to this proceeding, may need to be modified to comply with any future agreements with Canada and Mexico. We seek comment on this proposal. IV. PROCEDURAL MATTERS 129. Regulatory Flexibility Act. The Regulatory Flexibility Act of 1980, as amended (RFA), 5 U.S.C. §§ 601 et seq., as amended by the Small Business Regulatory Enforcement and Fairness Act (SBREFA), Pub. L. No. 104-121, 110 Stat. 847 (1996). requires that an agency prepare a regulatory flexibility analysis for notice-and-comment rulemaking proceedings, unless the agency certifies that “the rule will not, if promulgated, have a significant economic impact on a substantial number of small entities.” Id. § 605(b). Accordingly, the Commission has prepared an Initial Regulatory Flexibility Analysis (IRFA) concerning potential rule and policy changes contained in this Further Notice of Proposed Rulemaking. The IRFA is set forth in Appendix B. The Commission invites the general public, in particular small businesses, to comment on the IRFA. Comments must be filed by the deadlines for comments on the Further Notice of Proposed Rulemaking indicated on the first page of this document and must also have a separate and distinct heading designating them as responses to the IRFA. 130. Paperwork Reduction Act Analysis. This FNPRM may contain proposed new or revised information collections. The Commission, as part of its continuing effort to reduce paperwork burdens, invites the general public and the Office of Management and Budget (OMB) to comment on any information collections contained in this document, as required by the Paperwork Reduction Act of 1995, 44 U.S.C. §§ 3501-3521. In addition, pursuant to the Small Business Paperwork Relief Act of 2002, 44 U.S.C. § 3506(c)(4), we seek specific comment on how we might further reduce the information collection burden for small business concerns with fewer than 25 employees. 131. Providing Accountability Through Transparency Act. The Providing Accountability Through Transparency Act requires each agency, in providing notice of a rulemaking, to post online a brief plain-language summary of the proposed rule. 5 U.S.C. § 553(b)(4).  The Providing Accountability Through Transparency Act, Pub. L. No. 118-9 (2023), amended section 553(b) of the Administrative Procedure Act.   Accordingly, the Commission will publish the required summary of this Notice of Proposed Rulemaking on https://www.fcc.gov/proposed-rulemakings. 132. Ex Parte Presentations. The proceeding this FNPRM initiates shall be treated as a “permit-but-disclose” proceeding in accordance with the Commission’s ex parte rules. 47 CFR § 1.1200 et seq. Persons making ex parte presentations must file a copy of any written presentation or a memorandum summarizing any oral presentation within two business days after the presentation (unless a different deadline applicable to the Sunshine period applies). Persons making oral ex parte presentations are reminded that memoranda summarizing the presentation must (1) list all persons attending or otherwise participating in the meeting at which the ex parte presentation was made, and (2) summarize all data presented and arguments made during the presentation. If the presentation consisted in whole or in part of the presentation of data or arguments already reflected in the presenter’s written comments, memoranda or other filings in the proceeding, the presenter may provide citations to such data or arguments in his or her prior comments, memoranda, or other filings (specifying the relevant page and/or paragraph numbers where such data or arguments can be found) in lieu of summarizing them in the memorandum. Documents shown or given to Commission staff during ex parte meetings are deemed to be written ex parte presentations and must be filed consistent with rule 1.1206(b). In proceedings governed by rule 1.49(f) or for which the Commission has made available a method of electronic filing, written ex parte presentations and memoranda summarizing oral ex parte presentations, and all attachments thereto, must be filed through the electronic comment filing system available for that proceeding, and must be filed in their native format (e.g., .doc, .xml, .ppt, searchable .pdf). Participants in the proceeding should familiarize themselves with the Commission’s ex parte rules. 133. Comment Period and Filing Procedures. Pursuant to sections 1.415 and 1.419 of the Commission’s rules, 47 CFR §§ 1.415, 1.419, interested parties may file comments and reply comments on or before the dates indicated on the first page of this document. Comments may be filed using the Commission’s Electronic Comment Filing System (ECFS). · Electronic Filers: Comments may be filed electronically using the Internet by accessing the ECFS: http://www.fcc.gov/ecfs/. · Paper Filers: Parties who choose to file by paper must file an original and one copy of each filing. o Filings can be sent by hand or messenger delivery, by commercial courier, or by the U.S. Postal Service. All filings must be addressed to the Secretary, Federal Communications Commission. o Hand-delivered or messenger-delivered paper filings for the Commission’s Secretary are accepted between 8:00 a.m. and 4:00 p.m. by the FCC’s mailing contractor at 9050 Junction Drive, Annapolis Junction, MD 20701. All hand deliveries must be held together with rubber bands or fasteners. Any envelopes and boxes must be disposed of before entering the building. o Commercial courier deliveries (any deliveries not by the U.S. Postal Service) must be sent to 9050 Junction Drive, Annapolis Junction, MD 20701. o Filings sent by U.S. Postal Service First-Class Mail, Priority Mail, and Priority Mail Express must be sent to 45 L Street NE, Washington, DC 20554. 134. People with Disabilities. To request materials in accessible formats for people with disabilities (braille, large print, electronic files, audio format), send an e-mail to fcc504@fcc.gov or call the Consumer & Governmental Affairs Bureau at 202-418-0530. 135. Availability of Documents. Comments, reply comments, and ex parte submissions will be publicly available online via ECFS 136. Further Information. For further information about this proceeding, contact Christine Parola, Wireless Telecommunications Bureau, Mobility Division, by email at Christine.Parola@fcc.gov. V. ORDERING CLAUSES 137. Accordingly, IT IS ORDERED, pursuant to sections 1, 2, 4(i), 301, 302(a), 303, 304, 307, 308, 309, 310, 316, and 403 of the Communications Act of 1934, as amended, 47 U.S.C. §§ 151, 152, 154(i), 301, 302a(a), 303, 304, 307, 308, 309, 310, 316, and 403, and by section 40002 of the OBBB Act, that this Further Notice of Proposed Rulemaking IS ADOPTED. Pursuant to Executive Order 14215, 90 Fed. Reg. 10447 (Feb. 24, 2025), this regulatory action has been determined to be significant under Executive Order 12866, 58 Fed. Reg. 51735 (Oct. 4, 1993). 138. IT IS FURTHER ORDERED that the Commission’s Office of the Secretary SHALL SEND a copy of this Further Notice of Proposed Rulemaking, including the Initial Regulatory Flexibility Analysis, to the Chief Counsel for the Small Business Administration (SBA) Office of Advocacy. FEDERAL COMMUNICATIONS COMMISSION Marlene H. Dortch Secretary 2 APPENDIX A Proposed Rules For the reasons discussed in the document above, the Federal Communications Commission proposes to amend 47 CFR parts 1, 2, and 27 as follows: PART 1 – PRACTICE AND PROCEDURE 1. The authority citation for part 1 continues to read as follows: Authority: 47 U.S.C. chs. 2, 5, 9, 13; 28 U.S.C. 2461 note; 47 U.S.C. 1754, unless otherwise noted. 2. Section 1.907 is amended by revising the definition of “Covered geographic licenses” to read as follows: § 1.907 Definitions. Covered geographic licenses. Covered geographic licenses consist of the following services: 1.4 GHz Service (part 27, subpart I, of this chapter); 1.6 GHz Service (part 27, subpart J); 24 GHz Service and Digital Electronic Message Services (part 101, subpart G, of this chapter); 218-219 MHz Service (part 95, subpart F, of this chapter); 220-222 MHz Service, excluding public safety licenses (part 90, subpart T, of this chapter); 600 MHz Service (part 27, subpart N); 700 MHz Commercial Services (part 27, subparts F and H); 700 MHz Guard Band Service (part 27, subpart G); 800 MHz Specialized Mobile Radio Service (part 90, subpart S); 900 MHz Specialized Mobile Radio Service (part 90, subpart S); 900 MHz Broadband Service (part 27, subpart P); 3.45 GHz Service (part 27, subpart Q); 3.7 GHz Service (part 27, subpart O); 1675/2020 MHz Service (part 27, subpart R); Advanced Wireless Services (part 27, subparts K and L); Air-Ground Radiotelephone Service (Commercial Aviation) (part 22, subpart G, of this chapter); Broadband Personal Communications Service (part 24, subpart E, of this chapter); Broadband Radio Service (part 27, subpart M); Cellular Radiotelephone Service (part 22, subpart H); Citizens Broadband Radio Service (part 96, subpart C, of this chapter); Intelligent Transportation Systems Radio Service in the 5895-5925 MHz band, excluding public safety licenses (part 90, subpart M); Educational Broadband Service (part 27, subpart M); H Block Service (part 27, subpart K); Local Multipoint Distribution Service (part 101, subpart L); Multichannel Video Distribution and Data Service (part 101, subpart P); Multilateration Location and Monitoring Service (part 90, subpart M); Multiple Address Systems (EAs) (part 101, subpart O); Narrowband Personal Communications Service (part 24, subpart D); Paging and Radiotelephone Service (part 22, subpart E; part 90, subpart P); VHF Public Coast Stations, including Automated Maritime Telecommunications Systems (part 80, subpart J, of this chapter); Space Launch Services (part 26 of this chapter); Upper Microwave Flexible Use Service, except for the 37-37.6 GHz band (part 30 of this chapter); and Wireless Communications Service (part 27, subpart D). 3. Section 1.9005 is amended by adding paragraph (rr) to read as follows: § 1.9005 Included services. * * * * * (rr) 1675/2020 MHz Service (part 27 of this chapter). PART 2 – FREQUENCY ALLOCATIONS AND RADIO TREATY MATTER; GENERAL RULES AND REGULATIONS 4. The authority citation for part 2 continues to read as follows: Authority: 47 U.S.C. 154, 302a, 303, and 336, unless otherwise noted. 5. Section 2.106 is amended by revising pages 35 and 36 of the Table of Frequency Allocations to read as follows: § 2.106 Table of Frequency Allocations. * * * * * 2 Federal Communications Commission FCC 26-70 Table of Frequency Allocations 1626.5-2110 MHz (UHF)Page 35International TableUnited States TableFCC Rule Part(s) Region 1 TableRegion 2 TableRegion 3 TableFederal TableNon-Federal Table1626.5-1660 MOBILE-SATELLITE (Earth-to-space) 5.351A 5.341 5.351 5.353A 5.354 5.355 5.357A 5.359 5.362A 5.374 5.375 5.3761626.5-1660 MOBILE-SATELLITE (Earth-to-space) US308 US309 US315 US380 5.341 5.351 5.375 Satellite Communications (25) Maritime (80) Aviation (87)1660-1660.5 MOBILE-SATELLITE (Earth-to-space) 5.351A RADIO ASTRONOMY 5.149 5.341 5.351 5.354 5.362A 5.376A1660-1660.5 MOBILE-SATELLITE (Earth-to-space) US308 US309 US380 RADIO ASTRONOMY 5.341 5.351 US342 Satellite Communications (25) Aviation (87)1660.5-1668 RADIO ASTRONOMY SPACE RESEARCH (passive) Fixed Mobile except aeronautical mobile 5.149 5.341 5.379 5.379A1660.5-1668.4 RADIO ASTRONOMY US74 SPACE RESEARCH (passive)1668-1668.4 MOBILE-SATELLITE (Earth-to-space) 5.351A 5.379B 5.379C RADIO ASTRONOMY SPACE RESEARCH (passive) Fixed Mobile except aeronautical mobile 5.149 5.341 5.379 5.379A5.341 US2461668.4-1670 METEOROLOGICAL AIDS FIXED MOBILE except aeronautical mobile MOBILE-SATELLITE (Earth-to-space) 5.351A 5.379B 5.379C RADIO ASTRONOMY 5.149 5.341 5.379D 5.379E 1668.4-1670 METEOROLOGICAL AIDS (radiosonde) RADIO ASTRONOMY US74 5.341 US99 US342 51 1670-1675 METEOROLOGICAL AIDS FIXED METEOROLOGICAL-SATELLITE (space-to-Earth) MOBILE MOBILE-SATELLITE (Earth-to-space) 5.351A 5.379B 5.341 5.379D 5.379E 5.380A1670-1675 5.341 US211 US3621670-1675 FIXED MOBILE except aeronautical mobile 5.341 US211 US362 Wireless Communications (27)1675-1690 METEOROLOGICAL AIDS FIXED METEOROLOGICAL-SATELLITE (space-to-Earth) MOBILE except aeronautical mobile 5.3411675-1680 METEOROLOGICAL-SATELLITE (space-to-Earth) US88 5.341 US211 US3621675-1680 FIXED METEOROLOGICAL-SATEL- LITE (space-to-Earth) US88 MOBILE except aeronautical Mobile-Satellite (Earth-to-space)(space-to-Earth 5.341 US211 US362 Wireless Communications (27)1680-1695 METEOROLOGICAL-SATELLITE (space-to-Earth) US88 5.341 US211 US3621680-1695 FIXED MOBILE (except aeronautical mobile) Mobile-Satellite (Earth-to-space)(space-to-Earth 5.341 US211 US2891690-1700 METEOROLOGICAL AIDS METEOROLOGICAL-SATELLITE (space-to-Earth) Fixed Mobile except aeronautical mobile 5.289 5.341 5.3821690-1700 METEOROLOGICAL AIDS METEOROLOGICAL-SATELLITE (space-to-Earth) 5.289 5.341 5.3811695-1710 METEOROLOGICAL-SATELLITE (space-to-Earth) US881695-1710 FIXED MOBILE except aeronautical mobile Wireless Communications (27)1700-1710 FIXED METEOROLOGICAL-SATELLITE (space-to-Earth) MOBILE except aeronautical mobile 5.289 5.3411700-1710 FIXED METEOROLOGICAL-SATELLITE (space-to-Earth) MOBILE except aeronautical mobile 5.289 5.341 5.3845.3415.341 US881710-1930 FIXED MOBILE 5.384A 5.388A 5.388B1710-1761 5.341 US91 US378 US3851710-1780 FIXED MOBILE5.149 5.341 5.385 5.386 5.387 5.3881761-1780 SPACE OPERATION (Earth-to-space) G42 US915.341 US91 US378 US3851780-1850 FIXED MOBILE SPACE OPERATION (Earth-to-space) G421780-18501850-2025 1850-2000 FIXED MOBILE Mobile-satellite NG33A RF Devices (15) Personal Communications (24) Satellite Communications (25 Wireless Communications (27) Fixed Microwave (101)1930-1970 FIXED MOBILE 5.388A 5.388B 5.3881930-1970 FIXED MOBILE 5.388A 5.388B Mobile-satellite (Earth-to-space) 5.3881930-1970 FIXED MOBILE 5.388A 5.388B 5.3881970-1980 FIXED MOBILE 5.388A 5.388B 5.3881980-2010 FIXED MOBILE MOBILE-SATELLITE (Earth-to-space) 5.351A5.388 5.389A 5.389B 5.389F2000-2020 FIXED MOBILE MOBILE-SATELLITE (Earth-to-space) Satellite Communications (25) Wireless Communications (27)2010-2025 FIXED MOBILE 5.388A 5.388B2010-2025 FIXED MOBILE MOBILE-SATELLITE (Earth-to-space)2010-2025 FIXED MOBILE 5.388A 5.388B2020-2025 FIXED MOBILE Mobile-Satellite (Earth-to-space)(space-to-Earth) Wireless Communications (27)5.3885.388 5.389C 5.389E5.3882025-2110 SPACE OPERATION (Earth-to-space) (space-to-space) EARTH EXPLORATION-SATELLITE (Earth-to-space) (space-to-space) FIXED MOBILE 5.391 SPACE RESEARCH (Earth-to-space) (space-to-space) 5.3922025-2110 SPACE OPERATION (Earth-to-space) (space-to-space) EARTH EXPLORATION-SATELLITE (Earth-to-space) (space-to-space) SPACE RESEARCH (Earth-to-space) (space-to-space) FIXED MOBILE 5.391 5.392 US90 US92 US222 US346 US3472025-2110 FIXED NG118 MOBILE 5.391 Space Operation (Earth-to-space) US94 5.392 US90 US92 US222 US346 US347Space Launch Services (26) TV Auxiliary Broadcasting (74F) Cable TV Relay (78) Local TV Transmission (101J) Page 36 Federal Communications Commission FCC 26-70 PART 27 – MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES 6. The authority citation for part 27 continues to read as follows: Authority: 47 U.S.C. 154, 301, 302a, 303, 307, 309, 332, 336, 337, 1403, 1404, 1451, and 1452, unless otherwise noted. 7. Section 27.4 is amended by adding, in alphabetical order, the definition of “1675/2020 MHz Service” to read as follows: 1675/2020 MHz service. A radiocommunication service licensed under this part for the frequency bands specified in § 27.5(p). 8. Section 27.5 is amended by adding paragraph (p) to read as follows: § 27.5 Frequencies. * * * * * (p) 1675-1695 MHz and 2020-2025 MHz bands. The 1675/2020 MHz Service is comprised of Block A (1675-1685 MHz), Block B (1685-1695 MHz), and Block C (2020-2025 MHz). These unpaired blocks are available for assignment on a geographic area basis. 9. Section 27.13 is amended by adding paragraph (p) to read as follows: § 27.13 License period. * * * * * (p) 1675/2020 MHz Service. Authorizations for licenses in the 1675/2020 MHz Service in the 1675-1685 MHz, 1685-1695 MHz, and 2020-2025 MHz bands will have a term not to exceed 15 years from the date of issuance or renewal. 10. Section 27.14 is amended by revising the first sentence of paragraphs (a) and the first sentence of paragraph (k) to read as follows: § 27.14 Construction requirements. (a) AWS and WCS licensees, with the exception of WCS licensees holding authorizations for the 600 MHz band, Block A in the 698-704 MHz and 728-734 MHz bands, Block B in the 704-710 MHz and 734-740 MHz bands, Block E in the 722-728 MHz band, Block C, C1 or C2 in the 746-757 MHz and 776-787 MHz bands, Block A in the 2305-2310 MHz and 2350-2355 MHz bands, Block B in the 2310-2315 MHz and 2355-2360 MHz bands, Block C in the 2315-2320 MHz band, Block D in the 2345-2350 MHz band, in the 3450-3550 MHz band, and in the 3700-4140 MHz band, and with the exception of licensees holding AWS authorizations in the 1915-1920 MHz and 1995-2000 MHz bands, the 2000-2020 MHz and 2180-2200 MHz bands, the 1695-1710 MHz band, the 1755-1780 MHz and 2155-2180 MHz bands, or the 1675-1695 MHz and 2020-2025 MHz bands, must, as a performance requirement, make a showing of “substantial service” in their license area within the prescribed license term set forth in § 27.13. * * * * * * * * (k) Licensees holding WCS or AWS authorizations in the spectrum blocks enumerated in paragraphs (g), (h), (i), (q), (r), (s), (t), (v), (w), (x), and (y) of this section, including any licensee that obtained its license pursuant to the procedures set forth in paragraph (j) of this section, shall demonstrate compliance with performance requirements by filing a construction notification with the Commission, within 15 days of the expiration of the applicable benchmark, in accordance with the provisions set forth in §1.946(d) of this chapter. * * * 11. Section 27.50 is amended by revising the introductory text of paragraphs (d), (d)(1), and (d)(2) and adding paragraph (d)(11) to read as follows: § 27.50 Power limits and duty cycle. * * * * * (d) The following power and antenna height requirements apply to stations transmitting in the 1695-1710 MHz, 1710-1755 MHz, 1755-1780 MHz, 1915-1920 MHz, 1995-2000 MHz, 2000-2020 MHz, 2110-2155 MHz, 2155-2180 MHz and 2180-2200 MHz bands, and the 1675/2020 MHz Service: (1) The power of each fixed or base station transmitting in the 1995-2000 MHz, 2110-2155 MHz, 2155-2180 MHz or 2180-2200 MHz band, or the 1675/2020 MHz Service, and located in any county with population density of 100 or fewer persons per square mile, based upon the most recently available population statistics from the Bureau of the Census, is limited to: * * * * * (2) The power of each fixed or base station transmitting in the 1995-2000 MHz, 2110-2155 MHz, 2155-2180 MHz, or 2180-2200 MHz band, or the 1675/2020 MHz Service, and situated in any geographic location other than that described in paragraph (d)(1) of this section is limited to: * * * * * (11) Mobile and transportable (handheld) stations operating in the 1675/2020 MHz Service are limited to 2 watts EIRP. * * * * * 12. Section 27.53 is amended by adding paragraph (p) to read as follows: § 27.53 Emission limits. * * * * * (p)(1) For operations in the 1675/2020 MHz Service, the power of any emission outside the licensee’s frequency band(s) of operation shall be attenuated below the transmitter power in watts (P) by at least 43 + 10 log (P) dB. Compliance with these provisions is based on the procedures described in paragraph (a)(5) of this section. (2) To the extent a licensee in the 1675/2020 MHz Service establishes unified operations across that license and a license in a qualified adjacent band (1670-1675 MHz, 1695-1710 MHz, or 2000-2020 MHz), that licensee may choose not to observe the emission limit specified in paragraph (p)(1) of this section, strictly between its adjacent block licenses in a geographic area, so long as it complies with other Commission rules and is not adversely affecting the operations of other parties by virtue of exceeding the emission limit. (3) Private Agreements. Licensees in the 1675/2020 MHz Service may enter into a private agreement with all affected licensees operating in a qualified adjacent band (1670-1675 MHz, 1695-1710 MHz, or 2000-2020 MHz), to allow the out-of-band emission limit described in this paragraph to be exceeded only between the 1675/2020 MHz Service block and the adjacent block in the qualified adjacent band. A licensee who is a party to a private agreement described in this section (3) must maintain a copy of the agreement in its station files and disclose it, upon request, to prospective assignees, transferees, or spectrum lessees, and to the Commission. * * * * * 13. Section 27.55 is amended by adding paragraph (f) to read as follows: § 27.55 Power strength limits. * * * * * (f) Power flux density for stations operating in the 1675-1695 MHz and 2020-2025 MHz bands. For base and fixed stations operating in the 1675-1695 MHz and 2020-2025 MHz bands in accordance with the provisions of § 27.50(d), the power flux density (PFD) at any location on the geographical border of a licensee’s service area shall not exceed −76 dBm/m2/MHz. This power flux density will be measured at 1.5 meters above ground. Licensees in adjacent geographic areas may voluntarily agree to operate under a higher PFD at their common boundary. 14. Section 27.57 is amended by revising paragraph (c) to read as follows: § 27.57 International coordination. * * * * * (c) Operation in the 1675-1695 MHz, 1695-1710 MHz, 1710-1755 MHz, 1755-1780 MHz, 1915-1920 MHz, 1995-2000 MHz, 2000-2020 MHz, 2020-2025 MHz, 2110-2155 MHz, 2155-2180 MHz, 2180-2200 MHz, 3450-3550 MHz, and 3700-4140 MHz bands is subject to international agreements with Mexico and Canada. 15. Add subpart R, consisting of §§ 27.1700, 27.1701, and 27.1710, to read as follows: Subpart R—1675/2020 MHz Service Sec. 27.1700 1675/2020 MHz Service subject to competitive bidding. 27.1701 Designated entities in the 1675/2020 MHz Service. 27.1710 Protection of Federal Government operations. § 27.1700 1675/2020 MHz Service subject to competitive bidding. Mutually exclusive initial applications for licenses in the 1675/2020 MHz Service are subject to competitive bidding. The general competitive bidding procedures set forth in 47 CFR part 1, subpart Q of this chapter will apply unless otherwise provided in this subpart. § 27.1701 Designated entities in the 1675/2020 MHz Service. (a) Eligibility for small business provisions. (1) Definitions. (i) Small business. A small business is an entity that, together with its affiliates, its controlling interests, and the affiliates of its controlling interests, has average gross revenues not exceeding $55 million for the preceding five (5) years. (ii) Very small business. A very small business is an entity that, together with its affiliates, its controlling interests, and the affiliates of its controlling interests, has average gross revenues not exceeding $20 million for the preceding five (5) years. (2) Bidding credits. A winning bidder that qualifies as a small business, as defined in this section, or a consortium of small businesses may use the bidding credit of 15 percent, as specified in § 1.2110(f)(2)(i)(C) of this chapter. A winning bidder that qualifies as a very small business, as defined in this section, or a consortium of very small businesses may use the bidding credit of 25 percent, as specified in § 1.2110(f)(2)(i)(B) of this chapter. (b) Eligibility for rural service provider bidding credit. A rural service provider, as defined in § 1.2110(f)(4)(i) of this chapter, that has not claimed a small business bidding credit may use the bidding credit of 15 percent specified in § 1.2110(f)(4) of this chapter. § 27.1710 Protection of Federal Government operations. (a) Meteorological-Satellite operations in the 1675-1695 MHz band. (1) Four (4) Protection Zones. Within four Protection Zones, prior to operating a fixed or base station in the 1675-1695 MHz band, licensees must successfully coordinate such fixed or base station operations with Federal Government entities operating meteorological satellite Earth-station receivers in the 1675-1710 MHz band. These protections zones shall be centered on the federal satellite downlink sites at Fairmont, WV (lat. 39.4336, long. -80.1928); Sioux Falls, SD (lat. 43.7351, long. -96.6255); Suitland, MD (lat. 38.8522, long. -76.9367); and Wallops, VA (lat. 37.9465, long. -75.4621). The Commission and the National Telecommunications and Information Administration (NTIA) shall jointly issue a public notice detailing the contours of the Protection Zones around each of these points. (2) Additional Protection Zones. Additional Protection Zones in the 1675-1695 MHz band may be added subject to approval by NTIA and in compliance with a coordination process that will be announced jointly by the FCC and NTIA via Public Notice. (3) Interference. If protected Federal earth stations receive harmful interference from operations in the 1675-1695 MHz band, a 1675-1695 MHz band licensee must, upon notification, modify its operations and/or technical parameters as necessary to eliminate the interference. (4) Point of contact. 1675-1695 MHz band licensees must provide and maintain a point of contact in ULS at all times so that immediate contact can be made should interference against protected Federal sites occur. (5) Coordination procedures. Federal use of the radio spectrum is generally governed by NTIA while non-Federal use is governed by the Commission. As such, any guidance or details concerning Federal/non-Federal coordination must be issued jointly by NTIA and the Commission. The Commission may jointly issue with NTIA one or more public notices with guidance or details concerning the coordination procedures for the 1675-1695 MHz band. (b) Satellite operations in the 2025-2110 MHz band. (1) Interference. If Federal satellite receivers operating in the Space Research, Earth Exploration-Satellite, or Space Operation Services in the 2025-2110 MHz band receive harmful interference from space-to-Earth operations in the 2020-2025 MHz band, a licensee operating in the 2020-2025 MHz band must, upon notification, modify its operations and/or technical parameters as necessary to eliminate the interference. (2) Point of contact. 2020-2025 MHz band licensees in the must provide and maintain a point of contact in ULS at all times so that immediate contact can be made should interference against Federal satellite receivers occur. 2 APPENDIX B Initial Regulatory Flexibility Analysis 1. As required by the Regulatory Flexibility Act of 1980, as amended (RFA), 5 U.S.C. §§ 601 et seq., as amended by the Small Business Regulatory Enforcement and Fairness Act (SBREFA), Pub. L. No. 104-121, 110 Stat. 847 (1996). the Federal Communications Commission (Commission) has prepared this Initial Regulatory Flexibility Analysis (IRFA) of the policies and rules proposed in the Further Notice of Proposed Rulemaking (FNPRM) assessing the possible significant economic impact on a substantial number of small entities. The Commission requests written public comments on this IRFA. Comments must be identified as responses to the IRFA and must be filed by the deadlines for comments specified on the first page of the FNPRM. The Commission will send a copy of the FNPRM, including this IRFA, to the Chief Counsel for the Small Business Administration (SBA) Office of Advocacy. Id. § 603(a). In addition, the FNPRM and IRFA (or summaries thereof) will be published in the Federal Register. Id. A. Need for, and Objectives of, the Proposed Rules 2. Through this proceeding, the Commission continues its efforts to restore American leadership in wireless and meet the nation’s growing need for connectivity that fuels daily life. The FNPRM paves the way to make 25 megahertz of prime mid-band spectrum available for commercial use. We do so by proposing rules that will enable shared use of the 1675-1695 MHz band between incumbent federal and new, non-federal operations and unleash underutilized spectrum in the 2020-2025 MHz band. The FNPRM reexamines proposals set forth in the Commission’s 2019 Notice of Proposed Rulemaking and expands the scope of its inquiry to encompass additional mid-band spectrum and consider additional use cases. Further, we propose rules regarding reallocation, licensing, competitive bidding, and technical parameters, as well as measures regarding coordination and protection of incumbent and adjacent operations with respect to the 1675-1695 MHz and 2020-2025 MHz bands. 3. In the FNPRM, the Commission’s proposals seek to unlock the 1675-1695 MHz and 2020-2025 MHz bands for next-generation commercial wireless services, while also setting the stage to leverage these bands for emergent direct-to-device (D2D) services. D2D services provide fast and ubiquitous connectivity directly to a smartphone or device from next-generation satellites, resulting in seamless, high-speed coverage across the country, including in rural and remote areas. We anticipate that ongoing D2D innovations will continue to benefit the American public by eliminating dead zones, enhancing competition, improving public safety, and providing coverage to underserved areas. 4. In addition, the Commission proposes to introduce more mid-band spectrum into the marketplace while recognizing the importance of ensuring that new services will coexist with incumbent federal operations. The National Oceanic and Atmospheric Administration (NOAA) uses several frequencies in the 1675-1695 MHz band for transmitting weather and other environmental data to a wide scope of users in the federal government, state and local agencies, and private sector. We seek to work collaboratively with the National Telecommunications and Information Administration (NTIA) and NOAA to ensure that federal and non-federal users continue to seamlessly obtain and utilize this data. B. Legal Basis 5. The proposed action is authorized pursuant to sections 1, 2, 4(i), 301, 302(a), 303, 304, 307, 308, 309, 310, 316, and 403 of the Communications Act of 1934, as amended, 47 U.S.C. §§ 151, 152, 154(i), 301, 302a(a), 303, 304, 307, 308, 309, 310, 316, and 403, and by section 40002 of the One Big Beautiful Bill Act. C. Description and Estimate of the Number of Small Entities to Which the Proposed Rules will Apply 6. The RFA directs agencies to provide a description of and, where feasible, an estimate of the number of small entities that may be affected by the proposed rules, if adopted. 5 U.S.C. § 603(b)(3). The RFA generally defines the term “small entity” as having the same meaning as the terms “small business,” “small organization,” and “small governmental jurisdiction.” Id. § 601(6). In addition, the term “small business” has the same meaning as the term “small business concern” under the Small Business Act. Id. § 601(3) (incorporating by reference the definition of “small-business concern” in the Small Business Act, 15 U.S.C. § 632). Pursuant to 5 U.S.C. § 601(3), the statutory definition of a small business applies “unless an agency, after consultation with the Office of Advocacy of the Small Business Administration and after opportunity for public comment, establishes one or more definitions of such term which are appropriate to the activities of the agency and publishes such definition(s) in the Federal Register.” A “small business concern” is one which: (1) is independently owned and operated; (2) is not dominant in its field of operation; and (3) satisfies any additional criteria established by the SBA. 15 U.S.C. § 632. The SBA establishes small business size standards that agencies are required to use when promulgating regulations relating to small businesses; agencies may establish alternative size standards for use in such programs, but must consult and obtain approval from SBA before doing so. 13 CFR § 121.903. 7. Our actions, over time, may affect small entities that are not easily categorized at present. We therefore describe three broad groups of small entities that could be directly affected by our actions. 5 U.S.C. § 601(3)-(6). In general, a small business is an independent business having fewer than 500 employees. See SBA, Office of Advocacy, Frequently Asked Questions About Small Business (July 23, 2024), https://advocacy.sba.gov/wp-content/uploads/2024/12/Frequently-Asked-Questions-About-Small-Business_2024-508.pdf. These types of small businesses represent 99.9% of all businesses in the United States, which translates to 34.75 million businesses. Id. Next, “small organizations” are not-for-profit enterprises that are independently owned and operated and not dominant in their field. 5 U.S.C. § 601(4). While we do not have data regarding the number of non-profits that meet that criteria, over 99 percent of nonprofits have fewer than 500 employees. See SBA, Office of Advocacy, Small Business Facts, Spotlight on Nonprofits (July 2019), https://advocacy.sba.gov/2019/07/25/small-business-facts-spotlight-on-nonprofits/. Finally, “small governmental jurisdictions” are defined as cities, counties, towns, townships, villages, school districts, or special districts with populations of less than fifty thousand. 5 U.S.C. § 601(5). Based on the 2022 U.S. Census of Governments data, we estimate that at least 48,724 out of 90,835 local government jurisdictions have a population of less than 50,000. See U.S. Census Bureau, 2022 Census of Governments—Organization, https://www.census.gov/data/tables/2022/econ/gus/2022-governments.html, tables 1-11. 8. The rules proposed in the FNPRM will apply to small entities in the industries identified in the chart below by their six-digit North American Industry Classification System (NAICS) The North American Industry Classification System (NAICS) is the standard used by federal statistical agencies in classifying business establishments for the purpose of collecting, analyzing, and publishing statistical data related to the U.S. business economy. See www.census.gov/NAICS for further details regarding the NAICS codes identified in this chart. codes and corresponding SBA size standard. The size standards in this chart are set forth in 13 § CFR 121.201, by six digit North American Industrial Classification System (NAICS) code. Where available, we also provide additional information regarding the number of potentially affected entities in the industries identified below. TABLE 1. 2022 U.S. CENSUS BUREAU DATA BY NAICS CODE Regulated Industry (Footnotes specify potentially affected entities within a regulated industry where applicable)NAICS Code SBA Size Standard Total Firms U.S. Census Bureau, “Selected Sectors: Employment Size of Firms for the U.S.: 2022.” Economic Census, ECN Core Statistics Economic Census: Establishment and Firm Size Statistics for the U.S., Table EC2200SIZEEMPFIRM, 2025, “Selected Sectors: Sales, Value of Shipments, or Revenue Size of Firms for the U.S.: 2022.” Economic Census, ECN Core Statistics Economic Census: Establishment and Firm Size Statistics for the U.S., Table EC2200SIZEREVFIRM, 2025. Total Small Firms Id. % Small FirmsOther Communications Equipment Manufacturing Affected Entities in this industry include Radio Frequency Equipment Manufacturers (Non-standard specialized equipment) and Vendors of Infrastructure Development_Network Buildout. 334290800 employees31029494.84%Wireless Telecommunications Carriers (except Satellite) Affected Entities in this industry include Wireless Carriers and Service Providers and Wireless Communications Services. 5171121,500 employees1,1841,08191.30%Satellite Telecommunications Affected Entities in this industry include Mobile Satellite Earth Stations. 517410$44 million33219558.73% D. Description of Economic Impact and Projected Reporting, Recordkeeping, and Other Compliance Requirements for Small Entities 9. The RFA directs agencies to describe the economic impact of proposed rules on small entities, as well as projected reporting, recordkeeping and other compliance requirements, including an estimate of the classes of small entities which will be subject to the requirements and the type of professional skills necessary for preparation of the report or record. 5 U.S.C. § 603(b)(4). 10. The proposed changes in the FNPRM, if adopted, may require small entities to hire attorneys, engineers, consultants, or other professionals to comply. Although the Commission cannot quantify the cost of compliance at this time, several of the proposed rule changes are consistent with and mirror existing policies and requirements used for other part 27 flexible use licenses. Therefore, small entities with existing licenses in other bands may already be familiar with such policies and requirements and have the processes and procedures in place to facilitate compliance, resulting in minimal incremental costs to comply with our requirements for the 1675-1695 MHz and 2020-2025 MHz bands. We anticipate that the comments we receive will assist the Commission in identifying and evaluating the extent of these potential burdens on small entities, including compliance costs such as whether small entities will have to hire professionals, and other burdens that may result from the inquiries we make in the FNPRM. Below is an overview of areas discussed in the FNPRM that contain proposals that may, if adopted, lead to modified or additional compliance requirements for small entities. 11. Allocation: 1675-1695 MHz Band. In the FNPRM, the Commission proposes and seeks comment on reallocating the 1675-1695 MHz band on a co-primary basis for fixed and mobile (except aeronautical mobile) services for non-federal use. The FNPRM requests comment on the propagation characteristics that make this band well-suited for certain services and technologies, the types of services and technologies that would be best suited for this spectrum, the potential use cases that would promote intensive use of this spectrum, the potential effects that reallocation may have on this band, and the costs and benefits of reallocating the 1675-1695 MHz band. The Commission further proposes that federal operations in the Meteorological-Satellite (space-to-Earth) (MetSat) Service remain primary in this band. The Commission also seeks to refresh the proposal to remove the unused non-Federal Meteorological Aids (MetAids) Service allocation from the 1675-1680 MHz band and expand the proposal by seeking comment on removing that allocation from the entire 1675-1695 MHz band, given that there are currently no non-federal radiosonde licensees in this band. We seek comment on these proposals and whether to include the protections for federal operations discussed in the Commission’s rules or as a footnote to the U.S. Table of Frequency Allocations (U.S. Table). 12. To the extent that this spectrum can be used for such purposes, the FNPRM also proposes to reallocate the 1675-1695 MHz band on a secondary basis to accommodate satellite use for D2D. Accordingly, the Commission proposes to add a secondary MSS allocation for domestic supplemental coverage from space (SCS) in both the Earth-to-space and space-to-Earth directions and accordingly propose to add this band to footnote NG33A in the U.S. Table of Frequency Allocation. The Commission seeks comment on this proposal and notes that any changes to the SCS regime adopted in the companion D2D Modernization NPRM would thus apply should the band be used for D2D services. Commenters are invited to discuss the propagation characteristics that make this band well-suited for D2D operations, the best possible use cases for D2D operations, the potential effects that reallocation may have on this band. 13. Allocation: 2020-2025 MHz Band. For the 2020-2025 MHz band, the FNPRM proposes to retain the primary allocations for non-federal fixed and mobile services only and to add a secondary MSS allocation for domestic SCS in both the Earth-to-space and space-to-Earth directions. The Commission also seeks comment on whether the band should instead be allocated only to either terrestrial or MSS use, and the cost and benefits of limiting the use of the band in this way at the allocation level. Additionally, the Commission seeks comment on any potential adjacent-band impact to AWS-4 operations in the 2000-2020 MHz band from new terrestrial or D2D operations in the band. 14. Licensing and Operational Rules: Flexible Use Under Part 27. Regarding terrestrial operations, the Commission proposes to license the 1675-1695 MHz and 2020-2025 MHz bands for terrestrial use under part 27, subject to all licensing and operational rules that are applicable to all part 27 services, including flexible use, regulatory status, compliance with construction notification requirements, renewal criteria, permanent discontinuance of operations, partitioning and disaggregation, and spectrum leasing. The FNPRM seeks comment on this approach and asks commenters to identify any aspects of the Commission’s general part 27 service rules that should be modified to accommodate the particular characteristics of the 1675-1695 MHz or 2020-2025 MHz bands. Commenters are asked to discuss the costs and benefits associated with these proposals and any alternatives that are proposed. 15. Regarding D2D operations, a parallel D2D Modernization NPRM adopted concurrently seeks broad comment on a new D2D framework and service rules. See generally Unleashing Licensed Spectrum for Direct-to-Device et al., GN Docket No. 26-281, Notice of Proposed Rulemaking, FCC 26-71 (2026). The Commission anticipates that, if it adopts D2D rules developed in that proceeding, they will apply to the bands under consideration in the FNPRM, assuming that allowing D2D operations is consistent with NTIA’s ongoing study of the 1675-1695 MHz band, and assuming that we adopt our proposal to include a secondary MSS allocation for SCS for both bands. Given this, the Commission invites commenters to address the sufficiency of the rules and framework under consideration in the D2D Modernization NPRM proceeding for the 1675-1695 MHz and 2020-2025 MHz bands. The Commission also seeks comment on how the inclusion of D2D operations or services in 1675-1695 MHz and 2020-2025 MHz may affect the appropriate rules or regulations for terrestrial service in these bands. 16. Licensing and Operational Rules: Eligibility. Consistent with previous Commission actions, we propose to adopt an open eligibility standard for the licensing of the 1675-1695 MHz and 2020-2025 MHz bands. We note that an open eligibility approach would not affect citizenship, character, or other generally applicable qualifications that may apply under our rules. The FNPRM seeks comment on adopting this proposal and on whether adopting an open eligibility standard for licenses in these bands would encourage the development of new technologies, products, and services while helping to maximize the efficient and intensive use of this spectrum. Commenters should discuss the costs and benefits of the open eligibility proposal on competition, innovation, and investment. The FNPRM notes that the companion D2D Modernization NPRM seeks comment on revised eligibility criteria for SCS licensees, and, to the extent that such criteria are adopted and assuming SCS use is permitted in these bands, the Commission proposes that such criteria would apply to SCS use of these bands for D2D operations. 17. Licensing and Operational Rules: Mobile Spectrum Holding Policies. In the FNPRM, we propose to include the 1675-1695 MHz and/or 2020-2025 MHz bands in the Commission’s spectrum screen for evaluating proposed secondary market transactions. We tentatively conclude that this spectrum would be “suitable and available” for mobile services, and seek comment on that conclusion, including on how the similarity of this spectrum to spectrum currently included in the screen should be factored into its analysis. The Commission does not propose adopting a pre-auction bright-line limit on the ability of any entity to acquire spectrum in the 1675-1695 MHz and/or 2020-2025 MHz bands through competitive bidding at auction. Additionally, the Commission proposes to review spectrum holdings on a case-by-case basis when applications for initial licenses are filed post-auction to ensure that the public interest benefits of having a threshold on spectrum applicable to secondary market transactions are not rendered ineffective. To the extent that we include a secondary MSS allocation for SCS for this band, we seek comment on applying these mobile spectrum holdings policies to the proposed D2D use of the band, and we seek comment on applying these mobile spectrum holdings policies to the proposed D2D use of the band or whether any changes are needed for SCS use of the band. 18. Licensing and Operational Rules: Band Plan and License Term. In light of the additional spectrum being considered in this proceeding and the possibility of adding a secondary MSS allocation for SCS to support D2D operations, the Commission seeks to refresh the record regarding its proposal to license on a geographic area basis and invites commenters to discuss this proposal for the 1675-1695 MHz and 2020-2025 MHz bands. The FNPRM does not offer a specific geographic area proposal at this time but requests comment on whether to license these bands on a nationwide, Regional Economic Area Groupings (REAGs), or Partial Economic Area (PEA) basis. Commenters should address the economic, technical, and public interest considerations for their preferred geographic market area. The FNPRM also seeks comment on whether the use of either geographic area size would be consistent with the requirements and objectives of section 309(j) of the Communications Act. The Commission also requests comment on a licensing approach for the Gulf of America as well as the U.S. territories, including Puerto Rico, the U.S. Virgin Islands, American Samoa, Guam, and Northern Mariana Islands. The FNPRM seeks comment on whether a geographically independent area (GIA), as established in the Supplemental Coverage from Space Report and Order, covering the contiguous United States is the most appropriate way to license D2D services as it applies in the context of the 1675-1695 MHz and 2020-2025 MHz bands and whether using GIAs is the most effective approach in this instance of whether we should consider other options similar to those raised in the D2D Modernization NPRM. 19. To optimize use of the 1675-1695 MHz and 2020-2025 MHz bands, the FNPRM proposes a band plan consisting of two unpaired ten megahertz blocks and one unpaired five megahertz block. The frequency ranges for these bands would be 1675-1685 MHz, 1685-1695 MHz, and 2020-2025 MHz. This proposed configuration would allow adjacent band incumbents to aggregate contiguous spectrum, nearby licensees to expand their spectrum holdings, and new entrants to access desirable mid-band spectrum. The Commission seeks comment on this proposal, several tentative conclusions, the proposed block sizes, licensing on an unpaired basis, and the costs and benefits of the proposed band plan. Further, the Commission seeks comment on the tentative conclusion that the proposed band plan could support D2D offerings through a broad range of options and seeks comment on the proposed band plan’s block sizes, unpaired band approach, and flexibility to tailor operations for D2D services. The FNPRM also seeks comment on whether, instead of using the same geographic area size for all spectrum in these bands, we should adopt separate licensing configurations for each band. 20. We also propose and seek comment on a 15-year term for licenses for the 1675-1695 MHz and 2020-2025 MHz bands. Further, we propose a 15-year term for subsequent license terms for these bands, which aligns with the license terms of other wireless broadband spectrum bands. We seek comment on the proposed license terms, including the costs and benefits of these proposals. 21. Licensing and Operational Rules: Performance Requirements. The Commission establishes performance requirements to promote expeditious deployment of new technologies and services and to ensure that spectrum, as a valuable national resource, is used intensely and efficiently and deployed as quickly as possible. Considering the situation and characteristics of these bands, we propose and seek comment on requiring a terrestrial licensee in the 1675-1695 MHz and 2020-2025 MHz bands to provide reliable signal coverage and offer service to at least 45% of the population in each of its license areas as an interim performance benchmark, and to at least 80% of the population in each of its license areas as a final performance benchmark. We also propose that the period for complying with these performance benchmarks would begin on the date that the license is granted and, after satisfying the final performance benchmark, propose to require a licensee to continue to provide at least that level of service continuing through the end of the license term in order to qualify for renewal. We seek comment on both of these proposals. Regarding the timeline, the FNPRM seeks comment on the appropriate timeline for fulfilment of our proposed interim and final terrestrial benchmarks. 22. The FNPRM also notes that several of the federal incumbent services in the 1675-1695 MHz band will either cease operation or relocate within the band pursuant to the transition between the GOES-R and GeoXO satellite systems currently scheduled for 2036, which is likely to fall in the middle of the proposed license term. The Commission seeks comment on how, if at all, this transition should affect the buildout timeline. Because of the anticipated coordination zones for certain federal sites in the 1675-1695 MHz band, if licenses for this band are issued on a PEA basis, the Commission asks about whether the licenses covered or partially covered by the coordination zones should be treated differently than other licenses in terms of the timing or performance benchmarks. 23. To ensure a meaningful and enforceable penalty for failing to meet those benchmarks, the Commission proposes to impose an acceleration of the final performance benchmark as a penalty in these bands and seeks comment on the appropriate period of acceleration. In addition, the Commission proposes that in the event a licensee in these bands fails to meet the final performance benchmark, its authorization for each such license shall automatically terminate without further Commission action. Regarding licensees who fail to meet the interim benchmark requirement, the Commission acknowledges the argument that certain licensees may purposely accept the shortened final construction deadline and license term in order to delay capital expenditures and wait until the final construction deadline to deploy service and seeks comment, as an alternative, on whether we should require that licensees that fail to meet the interim deadline must satisfy the 45% population benchmark at some later point in the license term in advance of the shortened final construction deadline. In the event that a licensee’s authority to operate terminates, the Commission proposes that the licensee’s spectrum rights would become available for assignment pursuant to the competitive bidding provisions of section 309(j). Further, consistent with the Commission’s rules for other Wireless Radio Service licenses, the Commission proposes that any licensee in the 1675-1695 MHz or 2020-2025 MHz bands that forfeits its license for failure to meet its performance requirements would be precluded from regaining that license in such subsequent competitive bidding procedure. 24. While a population-based metric is suitable for a wide range of mobile and fixed service offerings, there are services that are potentially less suited to a population coverage metric. For example, terrestrial licensees providing Internet of Things (IoT)-type services may benefit from an alternative performance benchmark metric, such as a performance metric based on geographic area coverage (or presence in a license area) that could allow for networks that provide a service not necessarily based on residential population coverage. Accordingly, the Commission seeks comment on whether and how such a metric should be applied to the 1675-1695 MHz and 2020-2025 MHz bands. The FNPRM also seeks comment on a requirement of presence in subset units of the license area, such as census tracts, counties, or some other area. For example, licensees would demonstrate compliance with this metric through a showing of the equipment and deployments that are part of a network providing actual service, either to external customers, or for internal uses. The Commission seeks comment on the appropriate performance metrics for IoT-type services consistent with the population-based approach. 25. The Commission also puts forth several proposals regarding compliance procedures. In addition to being subject to procedures applicable to all part 27 licensees for demonstrating compliance with performance requirements, including the filing of electronic coverage maps and supporting documentation, we propose that such electronic coverage maps must accurately depict the boundaries of each license area in the licensee’s service territory. If a licensee does not provide reliable signal coverage to an entire license area, we propose that its map must accurately depict the boundaries of the area or areas within each license area that are not being served and not extend beyond the borders of the license area. Further, we propose that each licensee also must file supporting documentation regarding the type of service it is providing for each licensed area within its service territory and the type of technology used to provide such service and certify the accuracy of such documentation. Supporting documentation would include the assumptions used to create the coverage maps, including the propagation model and the signal strength necessary to provide reliable service with the licensee’s technology. We seek comment on these proposals. Our proposed band plan envisions that a provider could obtain an unpaired link to be used in conjunction with another band to provide service, and we seek comment on how this approach might impact compliance with performance requirements. 26. The companion D2D Modernization NPRM seeks comment on appropriate performance requirements for D2D services and deployments. Given that the Commission is proposing to authorize SCS in the 1675-1695 MHz (assuming such use is consistent with NTIA’s findings) and 2020-2025 MHz bands, it seeks comment on whether the performance requirements proposed in the companion proceeding are appropriate for these bands or if there are any considerations specific to 1675-1695 MHz or 2020-2025 MHz that warrant a different approach. We note that the FNPRM does not propose to require D2D operators to fulfill the terrestrial performance requirements described above. 27. Competitive Bidding Procedures. If we adopt a geographic area licensing scheme that allows acceptance of mutually exclusive applications, we will grant the licenses through a system of competitive bidding consistent with our statutory mandate in section 309(j)(1) of the Communications Act. We propose to conduct an auction for licenses for the spectrum in the 1675-1695 MHz and 2020-2025 MHz bands in conformity with the part 1, subpart Q general competitive bidding rules, subject to any modification of the part 1 rules that the Commission may adopt in the future. In light of the original proposal for the 1675-1680 MHz band spectrum, we expand this proposal to include the 1680-1695 MHz and 2020-2025 MHz bands to the extent that it is determined that sharing in the 1680-1695 MHz band is feasible. The FNPRM also seeks to refresh the record on the general application of the part 1 competitive bidding rules to any auction of licenses for these bands and whether any of our part 1 rules or other competitive bidding policies would be inappropriate or should be modified for an auction of licenses in these bands. 28. ORBIT Act. We tentatively conclude that there is no statutory bar to prohibit the proposal to permit the 1675-1695 MHz and 2020-2025 MHz bands to be auctioned for use by terrestrial fixed and mobile (except aeronautical mobile) services and satellite D2D operations via SCS on a secondary basis. The ORBIT Act, enacted in 2000, prohibits the Commission from “assign[ing] by competitive bidding orbital locations or spectrum used for the provision of international or global satellite communications services.” This prohibition, codified in section 765f of the ORBIT Act, was intended to prevent the imposition of auction-based licensing regimes on international satellite operators, which could lead to burdensome and duplicative auction requirements in multiple jurisdictions. We seek comment on our tentative conclusion that the ORBIT Act does not prevent our proposed auctioning of the 1675-1695 MHz and 2020-2025 MHz bands for flexible-use terrestrial services on a primary basis and SCS on a secondary basis. The Commission seeks comment on its ORBIT Act analysis. 29. Auction Features to Facilitate Competitive Bidding Among Operators with Different Use Cases. The Commission seeks comment on whether specific auction features might facilitate the highest valued use of this spectrum by enabling applicants seeking to serve different areas with different uses to compete directly for the licenses and effectively deploy services using those licenses. The Commission seeks comment on whether the assignment phase of a clock auction can be tailored to reduce the risk that winning bidders are unable to ensure contiguity of frequencies across their winning bids at a regional level. We also potentially could accommodate different use cases of potential licensees by varying the size of the geographic area license for each block in the band (e.g., PEA for one block, REAG for another block) with service rules such as buildout obligations applying across the relevant geographic areas. The FNPRM addresses another auction design feature that might accommodate different use cases of potential bidders, and that would be to accept both bids on individual licenses as well as bids for a nationwide package of individual licenses in at least some of the spectrum frequency blocks, with the latter being on an all-or-nothing basis. 30. Designated Entity Bidding Credits. The Commission also proposes to make bidding credits available for designated entities for the 1675-1695 MHz and 2020-2025 MHz bands. Consistent with recent Commission auctions of 5G-capable spectrum, we propose to offer small business bidding credits to eligible entities, subject to a cap of no less than $25 million, as described in section 1.2110(f)(2)(ii) of the Commission’s rules. We propose to define a “small business” as an entity with average gross revenues for the preceding five years not exceeding $55 million and a “very small business” as an entity with average gross revenues for the preceding five years as not exceeding $20 million. A qualifying “small business” would be eligible for a bidding credit of 15%, and a qualifying “very small business” would be eligible for a bidding credit of 25%. We seek comment on these proposed small business definitions and bidding credits. In addition, we propose to offer rural service providers a designated entity bidding credit for the 1675-1695 MHz and 2020-2025 MHz bands. Consistent with the Commission’s approach in other bands where the spectrum is likely to be used to provide 5G services, we propose to offer a 15% bidding credit, subject to a bidding credit cap of no less than $10 million, to any eligible rural service provider as defined in section 1.2110(f)(4)(i) of the Commission’s rules that has not claimed a small business bidding credit. We seek comment on the proposed bidding credit for rural service providers. The FNPRM also seeks comment on steps the Commission could take to promote connectivity in historically unserved or underserved areas. 31. Technical Rules. The FNPRM notes that these technical rules are intended to apply to terrestrial operations in the 1675-1695 MHz and 2020-2025 MHz bands. The companion D2D Modernization NPRM adopted concurrently seeks comment on appropriate technical rules for D2D operations in a variety of bands under a revised SCS framework. The Commission seeks comment on how the proposals and suggestions for technical rules governing D2D operations raised in the companion D2D Modernization NPRM would apply to the 1675-1695 MHz and 2020-2025 MHz bands should the Commission adopt an allocation allowing SCS on a secondary basis for these bands. Additionally, we anticipate that the D2D-specific technical rules proposed in the companion D2D Modernization NPRM would be applicable to these particular bands in the event that we permit secondary operations of D2D for these bands. 32. Technical Rules: Power Limits. The Commission proposes to allow fixed and base stations in both the 1675-1695 MHz and 2020-2025 MHz bands to operate up to 3280 watts/MHz equivalent isotropically radiated power (EIRP) in low-population density areas (counties with a population density of 100 or fewer persons per square mile), and up to 1640 watts/MHz EIRP in all other areas. Further, we propose to allow mobile and portable stations operating in these bands to operate up to 2 watts EIRP. 33. Technical Rules: Out-of-Band Emissions. The FNPRM proposes and seeks comment on an out-of-band emissions (OOBE) limit for terrestrial transmitters of all types, in both the 1675-1695 MHz and 2020-2025 MHz bands, of 43 + 10 log10 (P) dB, where P is the transmit power in watts. This OOBE limit has been used to protect adjacent operations from harmful interference in several AWS services and adjacent bands. We also seek comment on any additional OOBE limits that may be necessary to protect Global Positioning System (GPS) signals centered on 1575.42 MHz. Likewise, we ask whether we should require compliance with the established 3GPP protection levels for spurious emissions into this GPS band. Recognizing the potential use of this band with the adjacent AWS bands, the Commission proposes to allow a licensee in this service to enter into a private agreement with a licensee in any of the 1670-1675 MHz, 1695-1710 MHz, or 2000-2020 MHz bands to allow the 43 + 10 log10 (P) dB OOBE limit of either licensee to be exceeded within the other party’s band. The Commission also proposes that a licensee that is a party to such an agreement must maintain a copy of the agreement and disclose it, upon request, to prospective assignees, transferees, or spectrum lessees, and to the Commission. To the extent that a licensee establishes unified operations in blocks within these and an adjacent band, the FNPRM proposes that such a licensee may choose not to observe the OOBE limit, strictly between its adjacent block licenses in a geographic area, so long as it complies with other Commission rules and is not adversely affecting the operations of other parties by virtue of exceeding the limit. Compliance with this emission limit would be based on the measurement procedures described in paragraph (a)(5) of section 27.53 of the Commission’s rules. We anticipate that the D2D-specific OOBE limit proposed in the companion D2D Modernization NPRM would be applicable to any future D2D operations in these bands. 34. Technical Rules: Antenna Height. We propose not to adopt a limit on the height of antennas for either fixed or base stations throughout the 1675-1695 MHz and 2020-2025 MHz bands. Current part 27 rules do not impose any height limit on fixed or base stations in Advanced Wireless Services (AWS) operating above 1 GHz, with the exception of a limit of 10 meters above ground for fixed stations in the AWS-1 band. There are no antenna height limits in the adjacent 1670-1675 MHz, 1695-1710 MHz, or 2000-2020 MHz bands. Any antenna height limits necessary to facilitate deployment within coordination zones will be defined as part of the coordination process for each site. 35. Technical Rules: Power Limits at Market Boundary. The Commission proposes to limit a licensee’s predicted or measured field strength to a power flux density (PFD) of −76 dBm/m2/MHz at any location along or beyond the border of its license area. While in the 1675-1680 MHz NPRM we proposed to use the same limit as is currently applied to the other AWS bands (47 dBµV/m), the PFD paradigm we propose today is more straightforward to calculate or measure and also scales with channel bandwidth to provide licensees flexibility for demonstrating compliance. Both the PFD paradigm and this specific limit have been adopted in recent years for the 3.45 GHz Service and Upper C-band. We also propose and seek comment on allowing licensees to exceed this limit with the permission of the relevant adjacent licensee(s). We seek comment on these proposals, including on the use of the PFD metric and on the specific level proposed. 36. Technical Rules: Uplink/Downlink. The Commission proposes to allow terrestrial and D2D licensees to use both the 1675-1695 MHz and 2020-2025 MHz bands as either uplink, downlink, or time division duplexing (TDD), with no restriction in this regard. NTIA specifies that the band is suitable for terrestrial use as uplink or downlink, provided that the Commission imposes the same OOBE limit as applies to the 1670-1675 MHz band. We also note that NTIA is continuing to study the 1675-1695 MHz band for suitability for commercial use, including D2D use, and seeks comment on how that study should inform our conclusions, particularly if it finds downlink in the 1680-1695 MHz portion of the band to be feasible. The FNPRM also seeks comment on whether the Commission should adopt any technical rules specific to either terrestrial or D2D uplink, downlink, or TDD operations, including the costs and benefits of doing so. 37. Technical Rules: Other Technical Issues. Part 27 contains several additional technical rules applicable to all part 27 services, including equipment authorization, RF safety, frequency stability, antenna structures, and air navigation safety. The Commission proposes that all of these part 27 technical rules should apply to all licenses and licensees in the 1675-1695 MHz and 2020-2025 MHz bands, including licensees who acquire their licenses through partitioning or disaggregation. The Commission also seeks comment on whether to impose an interoperability requirement across the 1675-1695 MHz and 2020-2025 MHz bands, as the Commission has done for certain other part 27 services in order to facilitate greater equipment availability, especially in the 2020-2025 MHz band, and to better support the possibility of licensees using multiple licenses in these bands in conjunction. 38. Coordination and Protection of Incumbent and Adjacent Operations: 1675-1680 MHz. The Commission proposes to require that commercial licensees coordinate their terrestrial operations with federal incumbent operations in this band through the use of coordination zones. Specifically, the FNPRM proposes to define coordination zones around the four Data Collection System (DCS) receive sites identified by NTIA (in Fairmont, WV; Sioux Falls, SD; Suitland, MD; and Wallops, VA) and require the commercial licensees seeking to deploy within those zones first successfully coordinate with NTIA. The Commission also proposes to adopt the protection criteria for these DCS sites developed in the NOAA SPRES Report and as set out in the NTIA SPRES-FO Report. 39. Further, the Commission requests comment on how to define the radius or contours of the coordination zones around the four aforementioned DCS sites, the variables set forth by NTIA, and appropriate assumptions with respect to likely terrestrial deployment. Commenters should also discuss how, if at all, the potential inclusion of D2D services in this band should inform the coordination process, especially in terms of establishing the contours of the coordination zones for terrestrial operations. In considering protections for incumbents below 1675 MHz, the Commission seeks comment on what coordination measures, if any, are necessary and what coordination measures might protect adjacent incumbents without unduly burdening 1675-1695 MHz licensees. 40. As a complement or an alternative to the coordination mechanism proposed above, the FNPRM seeks comment on the use of guard bands to protect federal operations while affording commercial entrants the greatest possible flexibility for deployment. The NOAA SPRES Report and NTIA SPRES-FO Report suggest that leaving a guard band of 250 kilohertz below the bottom edge of the DCS downlink band beginning at 1679.45 MHz would meaningfully reduce the likelihood of harmful interference into the remaining four DCS receivers and allow commercial operations to deploy closer to the receive sites. The Commission seeks comment on this proposal, including its technical feasibility, the advantages of using a guard band in conjunction with the proposed coordination mechanism, the added protection given by imposing a guard band, and the role a guard band would serve here. Finally, we seek comment on the applicability of guard bands to potential D2D services in this band. 41. NTIA has stated that all current DCS sites (outside of the four remaining protected sites) will transition to a non-spectrum-based Alternative Distribution System (ADS) to retain necessary distribution functionality without requiring interference protection at those sites. The Commission agrees that use of this ADS, as developed and operated by NOAA, will allow greater availability and more efficient use of this band, and we seek comment on how to effectuate this proposal. The SPRES-FO Report provides preliminary estimates of the cost of modifying the downlink sites and operating the new distribution system. The Commission seeks comment on the preliminary cost estimates with respect to implementation, operation, and maintenance of this system. It also requests comment on who should fund the ADS and the likely timeline for deployment of the ADS. Finally, the FNPRM seeks comment on how the ADS or its implementation may be structured to address concerns about its adequacy as a substitute for the current distribution system, especially in the matter of latency and reliability. 42. Coordination and Protection of Incumbent and Adjacent Operations: 1680-1695 MHz. There are several federal incumbents currently operating in the 1680-1695 MHz band, and NTIA and other federal agencies are currently studying this band for potential repurposing for both traditional commercial deployments and D2D. In anticipation of this forthcoming report, the Commission seeks comment on how best to coordinate with the existing and planned federal operations while facilitating expeditious and efficient commercial deployments in these bands. In addition, the Commission proposes to adopt the same coordination mechanism for this portion of the band as the one proposed for the 1675-1680 MHz band: a small number of coordination zones around key incumbent sites, with licensees required to coordinate with NTIA for deployments within those zones and unencumbered by coordination requirements outside them. The FNPRM seeks comment on each of these aspects of coordination. 43. Further, the FNPRM seeks comment on the use of guard bands in this band to protect federal operations while affording commercial entrants the widest possible flexibility and efficiency for deployment. A guard band for the 1680-1695 MHz band does not appear to be realistic as a complete solution while all of these GOES-R receive services are operating, but the FNPRM contemplates that it may be feasible once the GOES-R services and constellation are retired and sites are transitioned to an ADS. The Commission seeks comment on the potential use of guard bands under those circumstances. We also seek comment on the use of guard bands above DCS, around the future GeoXO downlink, and potentially around the High Rate Information Transfer service at 1693.5-1694.7 MHz if any such sites cannot be transitioned. Additionally, we seek comment on how guard bands might be combined with coordination zones as well as ask commenters to discuss the applicability of guard bands to potential D2D services in this band. The FNPRM also seeks comment on whether a guard band would be necessary or beneficial to prevent interference into the adjacent 1695-1710 MHz band and on whether, in the event that the 1685-1695 MHz block is used for downlink, we should establish a guard band below 1695 MHz. 44. Coordination and Protection of Incumbent and Adjacent Operations: 2020-2025 MHz. While there are no regularly licensed incumbent users in this band, coordination measures may still be necessary, and the Commission seeks comment on what coordination measures, if any, are needed to protect federal and non-federal operations above 2025 MHz. We also seek comment on what coordination measures, if any, are necessary to ensure that both terrestrial and D2D operators in this band and in the 2 GHz MSS/AWS-4 band below 2020 MHz do not cause harmful interference to one another. 45. Canada/Mexico Coordination. The Commission’s part 27 rules provide that the AWS bands adjacent to the bands in this proceeding are subject to international coordination agreements with Mexico and Canada. The FNPRM proposes and seeks comment on using this approach for the 1675-1695 MHz and 2020-2025 MHz bands as well. Until any adjustments are made to agreements between the United States, Mexico and/or Canada, operations in these bands must not cause harmful interference across the border, consistent with the terms of the agreements currently in force. The proposed rules, and any rules that may ultimately become effective pursuant to this proceeding, may need to be modified to comply with any future agreements with Canada and Mexico. E. Discussion of Significant Alternatives Considered That Minimize the Significant Economic Impact on Small Entities 46. The RFA directs agencies to provide a description of any significant alternatives to the proposed rules that would accomplish the stated objectives of applicable statutes, and minimize any significant economic impact on small entities. 5 U.S.C. § 603(c). The discussion is required to include alternatives such as: “(1) the establishment of differing compliance or reporting requirements or timetables that take into account the resources available to small entities; (2) the clarification, consolidation, or simplification of compliance and reporting requirements under the rule for such small entities; (3) the use of performance rather than design standards; and (4) an exemption from coverage of the rule, or any part thereof, for such small entities.” Id. § 603(c)(1)-(4). 47. In the FNPRM, the Commission proposes a band plan and considers two alternative band plans for configuring the 1675-1695 MHz and 2020-2025 MHz bands. The first alternative band plan is comprised of five 5-megahertz blocks (Alternative Option 1), and the second is comprised of two 10-megahertz and one 5-megahertz blocks (with the upper 10 megahertz and 5 megahertz blocks set as a pair) (Alternative Option 2). The Commission anticipates that these band plans and their corresponding block sizes will each enable competition during the auction and in the provision of services, thereby providing small entities with the opportunity to obtain an appropriate amount of spectrum needed for their operations. The alternative band plans also offer options for both paired and unpaired spectrum for interested parties to consider, and the FNRPM seeks comment on whether each band plan would provide entry opportunities for small entities in particular. 48. Regarding license area size, we propose to license the 1675-1695 MHz and 2020-2025 MHz bands on a geographic area basis, but the FNPRM does not specify a geographic area at this time. Instead, we request comment on whether to license these bands on a nationwide and/or PEA basis. In seeking comment on this issue, we ask whether using either of these geographic area sizes would encourage competition and enable a wide range of bidders to participate in the auction, including both small and large providers. The FNPRM also inquires about whether the Commission should consider other license sizes for licensing this spectrum. We seek to provide entities with flexibility to allow them to participate in the auction while only attempting to acquire the spectrum needed to develop their wireless networks. The Commission encourages commenters who support using a geographic area size other than nationwide or PEAs to discuss the economic, technical, public interest, and other relevant considerations for their preferences. 49. Consistent with Commission precedent, the FNPRM also proposes to make bidding credits available for designated entities in the 1675-1695 MHz and 2020-2025 MHz bands. In the FNPRM, the Commission proposes definitions for a “small business” and a “very small business.” The FNPRM seeks comment on whether the Commission should diverge from the small business definitions and associated bidding credits than it has used previously. The Commission’s goal is to provide bidding credits to lessen the burden on small businesses so that the auction is accessible to a wide scope of entities, and the Commission seeks comment on alternatives for these definitions and bidding credits to accomplish this goal. 50. The Commission also seeks comment on an alternative emissions limit recommendation by Ligado for an attenuation of at least 70 + 10 log10 (P) dB for emissions below 1675 MHz specifically, unless the licensee either establishes unified operations across the entire 1670-1680 MHz band or enters into a private agreement with the licensee of the 1670-1675 MHz band. The FNPRM further seeks comment on several questions regarding Ligado’s recommendation, including whether such a limit would be necessary to protect operations in the 1670-1675 MHz band, allow typical terrestrial operations, and materially change the potential value or utility of the 1675-1685 MHz block. The FNPRM also seeks comment on, as an alternative, whether it would be beneficial to restrict some blocks to either uplink or downlink to facilitate coexistence with adjacent bands and reduce the potential for harmful interference as well as whether we should adopt any technical rules specific to either terrestrial or D2D uplink, downlink, or TDD operations. 51. In addition, to align with NOAA’s SPRES-FO Report and NTIA SPRES-FO Report, the Commission proposes to require that commercial licensees coordinate their terrestrial operations with federal incumbent operations in the 1675-1695 MHz band through the use of coordination zones. While the FNPRM proposes to define coordination zones around the four DCS receive sites at Fairmont, West Virginia; Sioux Falls, South Dakota; Suitland, Maryland; and Wallops, Virginia, we do not propose the use of any secondary or additional dynamic coordination zones around the other DCS sites. Alternatively, to the extent commenters believe that dynamic coordination zones could be feasible, the Commission considers how such coordination zones, or other alternative coordination processes, could be effectively and efficiently implemented. We seek detailed comment from small and other entities on this issue. 52. Additionally, the FNPRM contemplates whether leaving a guard band of 250 kilohertz below the bottom edge of the DCS downlink band at 1679.9 MHz would be beneficial, as the SPRES-FO Report and NTIA SPRES-FO Report suggest that this guard band would meaningfully reduce the likelihood of harmful interference into the four aforementioned DCS receivers. Because of this recommendation, the Commission seeks comment on the use of a guard band in the 1675-1695 MHz band as a complement or alternative to the proposed coordination mechanism. The Commission anticipates that a guard band would further protect incumbent federal operations while affording new commercial entrants, including small entities, the greatest possible flexibility for deployment. Moreover, the FNPRM asks several questions about whether a guard band would offer additional benefits to non-federal licensees, allow for smaller coordination zones at the four protected DCS sites, and permit closer deployment to DCS receiver sites. Commenters should also discuss whether the 250 kilohertz width discussed by the SPRES-FO Report and NTIA SPRES-FO Report would be the appropriate size or alternatively, whether a smaller or larger guard band would offer a better combination of costs and benefits. 53. In addition to the four previously noted DCS receive sites that will be protected through the use of coordination zones, all other current DCS sites that use the 1675-1695 MHz band to obtain data would transition to a non-spectrum-based ADS to retain necessary distribution functionality without requiring interference protection at those sites. As a result, the Commission agrees that use of the ADS, as developed and operated by NOAA, will allow greater availability and more efficient use of this band. To ensure continuous funding for the ADS, the Commission seeks comment on which party should be financially responsible for it, specifically asking whether it should be the auction winner(s) or a federal entity. The FNPRM also encourages any commenters suggesting alternative or additional solutions to discuss the benefits and costs of such an alternative system as compared to NOAA’s proposed methodology. 54. Finally, the Commission asks commenters to provide alternatives to its proposals for issues concerning the license term, power limits, performance benchmarks (including for IoT services), penalties for failing to meet performance benchmarks, buildout enforcement mechanisms, coordination zones, and application of part 27 additional technical rules. As we evaluate these proposed alternatives, the Commission will fully consider the economic impact on small entities, including costs and benefits identified in the record, and expects that comments filed in the record will provide additional insight into the potential compliance challenges these entities may face. The Commission’s evaluation of the comments filed in this proceeding will shape the final conclusions it reaches, the final alternatives it considers, and the actions it ultimately takes to minimize any significant economic impact that may occur on small entities from the final rules. F. Federal Rules that May Duplicate, Overlap, or Conflict with the Proposed Rules 55. None. APPENDIX C Regulatory Impact Analysis I. SUMMARY 1. This FNPRM seeks comment on making 25 megahertz of prime mid-band spectrum available via auction in the 1675-1695 MHz and 2020-2025 MHz bands. The FNPRM proposes primary allocation for fixed and mobile terrestrial service, secondary allocation for Mobile Satellite Service (MSS) for Supplemental Coverage from Space (SCS), and seeks comment on service and technical rules. 2. To assess the economic impact of the proposals set out in the FNPRM, we evaluate the expected benefits and costs for the five years following the release of a subsequent Report and Order. To estimate the expected benefits associated with the proposals, we derive producer surplus by projecting anticipated auction revenues using proceeds from a recently concluded auction. This is based on the assumption that the benefit of winning the licenses must at least be equal to what the company is willing to pay for the license, in order for these entities to bid. Auction proceeds are estimated based on the results of Auction 113 (AWS-3 licenses), which involved similar spectrum bands. We then calculate a range of predicted benefits based on a 50% buffer of the Auction 113 megahertz-pops price and find that the present value of benefits discounted over the five years following a Report and Order would be between $2.6 billion and $7.7 billion using a 3% discount rate, and between $2.3 billion and $7.0 billion using a 7% discount rate. To estimate the expected costs, we consider the costs to the providers of participating in the auction and the costs to the government of conducting the auction. We conclude that the costs associated with this item are significantly smaller than the benefits, totaling $6.6 million in present value for both the 3% and 7% discount rate calculations (given no discounting is necessary). As a result, we find that the overall benefits of the regulatory action outweigh the total costs. Present ValuePresent Value(3% Discount Rate)(7% Discount Rate)CategoryLower BoundUpper BoundLower BoundUpper BoundBenefits (5 Years Following Order)Producer Surplus$2.6 billion$7.7 billion$2.3 billion$7.0 billionCosts (5 Years Following Order)Auction Participation $4.2 million$4.2 million$4.2 million$4.2 millionGovernment Operation$2.4 million$2.4 million$2.4 million$2.4 millionTotal$6.6 million$6.6 million$6.6 million$6.6 millionNet Impact (5 Years Following Order)Total$2.6 billion$7.7 billion$2.3 billion$7.0 billion II. BENEFITS 3. To estimate the benefits associated with the proposals set out in the FNPRM, we focus on producer surplus. We assume that the auction takes place approximately one year after the adoption of a Report and Order, and that producer surplus accrues annually as service providers benefit from the deployment of additional spectrum. Using a 3% discount rate, we estimate the FNPRM will generate welfare gains between approximately $2.6 billion and $7.7 billion in the five years after the release of the associated Report and Order; and using a 7% discount rate, we estimate welfare gains between approximately $2.3 billion and $7 billion during this time. This additional spectrum that will be put to use will also generate substantial benefits for consumers by improving mobile wireless services and lowering prices. However, the benefit estimates in this RIA do not include any consumer gains because they are difficult to quantify at this point. Nonetheless, the gains to consumers represent an important component of the overall benefits and therefore, the estimated welfare gains presented below are conservative. 4. We derive producer surplus gains for wireless services by estimating the incremental value of the spectrum in question using auction-based MHzPOPs benchmarks. This approach follows the economic logic that spectrum value reflects the present value of profits that can be earned through services that rely on that spectrum. Coleman Bazelon & Giulia McHenry, Mobile Broadband Spectrum: A Vital Resource for the U.S. Economy, Brattle Group Report at 5, https://api.ctia.org/docs/default-source/default-document-library/brattle_spectrum_051115.pdf (2015). As a general matter, auction-based valuations may understate producer surplus because they do not account for information rents to the winning bidder—that is, the difference between the expected net present value of the winning bidder, and the actual auction payment that we observe. See, e.g., Brett Katzman, Julian Reif, Jesse A. Schwartz, The Relation Between Variance and Information Rent in Auctions, 28 International Journal of Industrial Organization 127 (2010) (“[T]he expected price paid in a standard auction equals the expectation of the second-highest bidder value . . . whenever bidder beliefs are independent . . . The winning bidder’s expected surplus is often referred to as information rent.”); see also Roger B. Myerson, Optimal Auction Design, 6 Mathematics of Operations Research (1981). To estimate the potential auction proceeds we use the average price per megahertz-pop from Auction 113, which took place in June 2026 and involved the proximate AWS-3 bands (1695-1710 MHz, 1755-1780 MHz, and 2155-2180 MHz). We note that the secondary allocation for MSS services may increase both producer surplus and consumer surplus. The average price per megahertz-pop in Auction 113 was $2.53. Based on these Auction 113 revenues, we estimate auction proceeds of approximately $21.2 billion for auctioning the three bands at issue across the United States. We multiply $2.53 by the total U.S. population from the 2020 Census (335,073,176) and the total megahertz proposed to be auctioned (25 megahertz). We acknowledge that it is inherently difficult to project auction revenues, thus we apply a 50% buffer to either side of our initial estimate to account for a range of potential auction outcomes. After applying the buffer, we have an estimated range of $10.6 billion to $31.8 billion in auction proceeds. We then convert the computed auction values to perpetuities using a 7% discount rate, In this case, profits are derived from estimates by firms about future profits. The relevant discount rate is then the cost of capital, which Circular A-4 sets to 7%. Circular A-4 at 33. and compute the present values for the first five years after the adoption of a future Report and Order. The present value of a perpetuity at a 7% discount rate with discounting beginning in the second period is (1 + 1 / 7%) = 15.29 times the annual payout. Converting the estimated auction revenue to an annual payment implies that the rights to the additional spectrum is worth between $693.2 million and $2.1 billion annually in additional profits. Limiting our analysis to the five years following the adoption of a Report and Order, we estimate total producer surplus between $2.6 billion and $7.7 billion using a 3% discount rate, and between $2.3 billion and $7.0 billion using a 7% discount rate. III. COSTS 5. We identify two types of costs associated with the Report and Order: 1) auction participation costs for prospective bidders; and 2) government costs associated with planning and conducting an auction. We estimate the costs incurred will be approximately $6.6 million using either a 3% or a 7% discount rate. 6. Participating in the auction will involve a variety of tasks beyond the actual act of bidding, including rule familiarization, government filings, business and strategy planning, and specialized systems training. Winning bidders in the auction must also pay application fees, but as fees are generally only a few thousand dollars each we consider these de minimis relative to labor costs. Auction 113 consisted of 17 qualified bidders, thus we conservatively assume there will be 20 qualified bidders at auction. https://www.fcc.gov/auction/113 In the year preceding the auction, we assume that each company will require a team of five people with diverse expertise, including lawyers, engineers, and other business specialists, in order to able to bid effectively in the auction. We estimate the average annual compensation of a team member to be $211,306, based on the 90th percentile of wages in the telecommunication industry. The Bureau of Labor Statistics reports May 2024 mean annual 75th percentile wages of workers in the telecommunications industry is $144,730. Bureau of Labor Statistics (BLS), Occupational Employment and Wage Statistics Query System, https://data.bls.gov/oes/#/industry/517000 (accessed Sept. 9, 2026). According to the Bureau of Labor Statistics, as of December 2025, civilian wages and salaries averaged $33.45/hour and benefits averaged $15.33/hour. Using these figures, benefits constitute a markup of $15.33/$33.45 ~ 46%. Taking 46% for cost of benefits, we arrive at an annual compensation of $211,306 = ($144,730 × $146%). See Press Release, Bureau of Labor Statistics, Employer Costs for Employee Compensation—December 2025 (March 20, 2025), https://www.bls.gov/news.release/pdf/ecec.pdf. We assume each team member will need to devote 20% of their work hours over one year to auction-related tasks. Therefore, assuming 20 teams with an average team size of five people, we estimate the total costs of all bidders in the auction to be $4.2 million. $4.2 million = $211,306 × 5 team members × 20% time × 1 year × 20 bidders 7. We also assume that in the year preceding the auction, a team of approximately 20 Commission employees will be needed to produce necessary documentation, provide instructions for the participants, and conduct the auction. As the auction will require significant legal and technical expertise, we assume that each employee will, on average, have a relatively high level of total compensation annually of $238,132.61. A Washington DC area employee of the pay grade level GS-14 step 5 earns $163,104 annually. Office of Personnel Management, Salary Table 2026-DCB, https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary- tables/pdf/2026/DCB.pdf (accessed Sept. 8, 2026). Adding 46% for benefits, we find total compensation to be $238,132 = $163,104 × 146%. Assuming that approximately 50% of their time would be spent on the auction, the total compensation of the 20 employees would then be approximately $2.4 million. $2.4 million = $238,133 × 20 employees × 50% time × 1 year. 8. Both the auction participation costs and government costs occur in the first year of our calculations, thus we do not apply any discounting. We therefore estimate costs of $6.6 million in present value using either a 3% or a 7% discount rate. IV. ALTERNATIVE POLICY 9. In this scenario, no action would be taken by the Commission to reallocate spectrum in these bands. We treat this case as the baseline for our analysis, in which no additional benefits or costs are incurred. V. JUSTIFICATION DETERMINATION 10. We calculate the range of net benefits to be between $2.6 billion and $7.7 billion using a 3% discount rate, and between $2.3 billion and $7.0 billion using a 7% discount rate. The conservatively-estimated benefits far outweigh the costs in both the 3% and 7% scenarios. 2 STATEMENT OF CHAIRMAN BRENDAN CARR Re: Auctioning the 1675–1695 MHz and 2020–2025 MHz Bands et al., WT Docket No. 26-284; GN Docket No. 26-281; WT Docket No. 19-116, Further Notice of Proposed Rulemaking (October 29, 2026). As part of our Build America Agenda, the FCC set out to restore U.S. leadership in wireless. And we have been doing exactly that by executing on multiple fronts. On spectrum, we are running a two-part playbook. First, we have acted to ensure that spectrum gets lit up for the benefit of consumers. You can see that in the number of secondary market transactions the FCC has already approved—transactions that have moved more than 165 MHz of wireless spectrum in deals exceeding $65 billion. Second, we have revitalized the FCC’s work on spectrum auctions. After regaining our auction authority just over a year ago, the FCC completed a $3.5 billion auction of AWS-3 spectrum earlier this year. We are now on track to finish an auction of Upper C-band spectrum by July 2027. And the FCC is working to enable three more auctions after that. On top of all this, we are unleashing permissionless innovation by eliminating outdated or unnecessary technical restrictions on spectrum. We push ahead on many of these fronts at today’s meeting, starting with a new spectrum auction. In this NPRM, we propose to auction 25 megahertz of spectrum across the 1675 and 2020 MHz bands. Consistent with our commitment to technological neutrality, the FCC intends to open this auction to a broad range of connectivity providers—from 5G and 6G to D2D, or some hybrid network. We expect big interest in this seemingly modest amount of spectrum. While today’s proposal is a strong start, we must continue to work with our federal partners to finish the job on time, on budget, and with no surprises. Currently, NTIA is working to complete its study of the band by early 2027. And we must ensure that federal incumbents transition out in a timely and efficient manner. I am confident that we will all get this done. After all, we know how to deliver on spectrum. We are doing it right now in the Upper C-band—moving from idea to execution on an unprecedented timeline, managing costs to ensure a successful auction, and adopting technical rules that deliver real value to America’s innovators. We can do it again here. For their excellent work on this item, I thank Baron Chan, Linda Chang, Kamran Etemad, Jessica Greffenius, Michael Ha, Susannah Larson, Mary Lovejoy, Roger Noel, Christine Parola, Joel Taubenblatt, Erik Salovaara, and Catherine Schroeder. 2 STATEMENT OF COMMISSIONER ANNA M. GOMEZ Re: Auctioning the 1675-1695 MHz and 2020-2025 MHz Bands; Unleashing Licensed Spectrum for Direct-to-Device; Allocation and Service Rules for the 1675-1680 MHz Band; WT Docket No. 26-284, GN Docket No. 26-281, WT Docket No. 19-116; Further Notice of Proposed Rulemaking (Oct. 29, 2026). Spectrum management is one of the Federal Communications Commission (FCC) core functions.  The FCC considers consumer demand, incumbent uses, technological innovation as well as its limitations, market competition, and the public interest in making spectrum management decisions. As a Commissioner, I want to make sure firms have the spectrum they need to provide the services consumers want and to continue to develop the technologies that have made the United States a global leader in wireless communications. I also want to make sure we consider existing users of spectrum and carefully review the challenges presented by potential interference to them. There are important technical questions to answer about whether satellite and terrestrial uses can successfully coexist in the bands we consider today, and I look forward to the National Telecommunications and Information Administration’s final study on the subject.  As we have seen in recent FCC items, there is interest in making spectrum available for uses that have not historically coexisted in the same bands. While technical questions remain, this interest also poses queries about spectrum management. As this conversation unfolds, I find myself thinking about the spectrum screen. A spectrum screen is a policy concept and tool that the FCC has used since 2004 to review spectrum aggregation and market concentration. Applications of AT&T Wireless Inc. and Cingular Wireless Corporation For Consent To Transfer of Control of Licenses and Authorizations, Memorandum Opinion and Order, 19 FCC Rcd 21522, 21525, para. 4 (2004)    It helps us identify local markets where changes in spectrum holdings may be of particular concern to competition. Not all bands are part of the spectrum screen. The Commission continuously evaluates which bands of spectrum are “suitable and available” for use and should be included in the spectrum screen. See, e.g., Expanding Flexible Use of the 3.7 to 4.2 GHz Band, GN Docket No. 18-122, Report and Order and Order of Proposed Modification, 35 FCC Rcd 2343, 2381-84, paras. 83-89 (2020), aff’d PSSI Global Services v. FCC, No. 20-1142 (D.C. Cir. Dec. 8, 2020) (per curiam); Incentive Auction Closing and Channel Reassignment, AU Docket No. 14-252, Public Notice, 32 FCC Rcd 2786 (WTB 2017); Sprint-Shentel-NTELOS, 31 FCC Rcd at 3637-38, paras. 15-16; Mobile Spectrum Holdings Report and Order, 29 FCC Rcd at 6172, paras. 82-134; Applications of AT&T Mobility Spectrum LLC, New Cingular Wireless PCS, LLC, Comcast Corporation, Horizon Wi-Com, LLC, Nextwave Wireless, Inc., and San Diego Gas & Electric Company for Consent to Assign and Transfer Licenses, WT Docket No. 12-240, Memorandum Opinion and Order, 27 FCC Rcd 16459, 16470-71, para. 31 (2012).   So far, the spectrum screen has been applied to terrestrial spectrum bands, in secondary market transactions and in auctions whether by using pre-auction limits or post-auction review. A spectrum screen helps us ensure limited spectrum resources are available to support competition.  Given the demand to open more spectrum bands for satellite uses, the fact that competition in satellite services is in flux, and the reality that satellite and terrestrial networks are converging, it is time to start conceptualizing what a spectrum screen can look like for satellite uses. A potential issue to consider in the application of this concept is that some satellite spectrum is for shared, not for exclusive use. Thus, we should ask whether a screen in that context is necessary, and how it could apply to a shared band?   All these important considerations are why I am glad we included a question in this item about whether, if, and how to apply a spectrum screen. I look forward to seeing the record develop on this issue. Finally, I support Tribal licensing windows, and I thank the Chairman for incorporating a question about a tribal licensing window in the 1675-1695 MHz and 2020-2025 MHz bands which we are considering for auction. STATEMENT OF COMMISSIONER OLIVIA TRUSTY Re: Auctioning the 1675-1695 MHz and 2020-2025 MHz Bands; Unleashing Licensed Spectrum for Direct-to-Device; Allocation and Service Rules for the 1675 – 1680 MHz Band, WT Docket No. 26-284, GN Docket No. 26-281, WT Docket No. 19-116, Further Notice of Proposed Rulemaking (Oct. 29, 2026). Last week, I had the opportunity to attend the Dynamic Spectrum Alliance Global Summit in London to discuss the future of connectivity. A part of the discussion focused on how satellite technology can help expand access to broadband in rural and remote communities by integrating satellite services into terrestrial networks. Since 2024, the Commission’s Supplemental Coverage from Space framework has enabled U.S. companies to lead the world in satellite-terrestrial network integration. This framework allows satellite operators to partner with wireless carriers to connect directly to consumer smartphones from space, delivering connectivity to subscribers beyond the reach of traditional cell towers. The benefits of direct-to-device technology are clear. During Hurricanes Helene and Milton in 2024, D2D services kept hundreds of thousands of Americans connected despite significant disruptions to terrestrial networks. And D2D services kept Americans connected during last year’s devastating floods in Texas and wildfires in Los Angeles. Other benefits of D2D include improved service in remote areas surrounding military installations, connectivity when traditional infrastructure is unavailable due to infrastructure vandalism, and access to economic opportunity in some of the nation’s most underserved communities. Today’s item builds on the progress of expanding D2D services by proposing to make another 25 megahertz of spectrum available for flexible commercial use. Specifically, we propose auctioning the 1675–1695 MHz and 2020–2025 MHz bands for terrestrial wireless services, while permitting satellite connectivity on a secondary basis. This approach would give providers the flexibility to invest in new services and more effectively tailor their offerings to meet consumers’ broadband needs. Through the One Big Beautiful Bill Act, Congress and President Trump recognized the importance of putting additional spectrum to work to deliver more connectivity, more innovation, and more growth, and today’s item puts us on track to do just that. As part of this process, I look forward to the Commission’s continued work with NTIA as it completes its study of the 1680–1695 MHz band, while ensuring that critical federal operations remain protected. America’s wireless leadership depends on spectrum policies that keep pace with technological advances and so I welcome today’s progress on bringing this spectrum to auction in the near future. I thank the Wireless Telecommunications Bureau for its work on this item. 2