newsfilter
← Latest News
FCC Press Releases·

FCC Votes to Release More Spectrum for the Skies

  • The Federal Communications Commission adopted a Report and Order on November 19, 2026, to advance American leadership in aerial connectivity while addressing safety and security challenges for uncrewed aircraft systems (UAS).
  • The Commission modified rules for the 450 MHz band to permit air-ground data services, including UAS control and non-payload communications (CNPC), by adding a co-primary Aeronautical Mobile (Route) Service (AM(R)S) allocation.
  • A voluntary transition process was established to convert the incumbent's site-based licenses into a single nationwide geographic license covering the contiguous United States, Alaska, Hawaii, and U.S. territories.
  • AURA Network Systems OpCo, LLC, the sole incumbent licensee, is eligible to modify its existing licenses into the new nationwide license by submitting an Eligibility Certification demonstrating coverage at 25,000 feet and preventing other entities from providing contiguous regional service.
  • The Commission eliminated the requirement for 20 kHz channel spacing and reconfigured the 650 kilohertz of spectrum into a single license, allowing the licensee to channelize internally to prevent interference.
  • The nationwide license term was set at 15 years, and the licensee must comply with section 1.949 rules for license renewal.
  • Geographic partitioning and spectrum disaggregation are permitted for the 450 MHz band, provided the licensee demonstrates how co-channel and adjacent channel interference will be avoided.
  • Spectrum leasing is authorized under part 1 rules, requiring the lessor to demonstrate interference protections along lease boundaries and to neighboring operations.
  • The Commission modified rules for the 24.45–24.65 GHz band to permit federal and non-federal ground-based radiolocation operations on a secondary basis to facilitate UAS detection technologies.
  • Rules governing Commercial Aviation Air-Ground Systems in the 849–851 MHz and 894–896 MHz bands were modernized by changing power limits from peak to average measurements and removing unnecessary or obsolete regulations.
  • All services authorized under this order remain subject to prohibitions on equipment and services that pose unacceptable risks to national security.
  • The Commission declined to require a windfall payment or holding period for the transition to the nationwide license, citing the incumbent's significant prior investment and the emerging nature of the service.
  • The order aligns with Executive Orders issued by President Trump in June 2025 regarding airspace sovereignty and drone dominance.