newsfilter
← Latest News
GlobeNewswire·

GFG Expands Aljo Gold System 150 m East with Step-Out Results of 7.23 g/t Au over 2.0 m as Discovery-Driven Exploration Advances Across Goldarm

  • GFG Resources Inc. reported assay results from the final two drill holes (ALJ-25-037 & ALJ-25-038) of its Phase 2-2025 program at the Aljo Gold Project in Ontario.
  • Holes ALJ-25-037 and ALJ-25-038 were 150 m and 125 m step-outs east of the historic mine, confirming gold mineralization extends well beyond known limits.
  • ALJ-25-037 intersected the first high-grade intercepts east of the diabase dyke in the Hangingwall Zone with 1.23 g/t Au over 16.0 m, including 7.23 g/t Au over 2.0 m.
  • ALJ-25-038 extended the Main Zone east of historical workings with multiple near-surface intercepts, including 2.23 g/t Au over 5.3 m, containing 13.30 g/t Au over 0.5 m.
  • Results confirm strong grade continuity within a mineralized envelope extending 125–150 m east of the historic Aljo Gold Mine.
  • The 2026 exploration strategy includes an aggressive 6,000 m follow-up drill program at Aljo scheduled to resume in the first half of 2026.
  • District-scale exploration on the Goldarm Property is advancing with a 90-hole sonic base-of-till program 45 holes completed and a 2,500 m diamond drilling campaign targeting the Pipestone Deformation Zone.
  • The Company maintains a strong balance sheet to fund aggressive Aljo expansion while simultaneously financing district-scale exploration across its Goldarm portfolio.
  • New zones FW3 3 and FW4 were previously identified in the Footwall during the Phase 2 program, further expanding the geological model.
  • Future drilling will prioritize systematic infill 3 and step-out programs across the HW, Main, 3 FW Zones to define a resource-scale gold system.