newsfilter
← Latest News
GlobeNewswire·

Q2 Metals Intercepts 179 Metres of Continuous Spodumene Pegmatite North of the Mineralized Zone at the Cisco Lithium Project in Quebec, Canada

Highlights Drill hole CS25-065 encountered five (5) spodumene pegmatite intervals, with the widest continuous interval of 179.2 metres. Drill hole CS25-065 is located north of the known mineralized zone and west of the