newsfilter
← Latest News
GlobeNewswire·

Q2 Metals Intercepts 457.4 metres of 1.65% Li₂O in Drill Hole 44 at the Cisco Lithium Project

  • Q2 Metals Corp. reported analytical results from the 2025 drill program at its Cisco Lithium Project in Quebec, Canada, including 2,200.4 meters of drilling across four holes.
  • Drill hole CS25-044 identified two separate intervals totaling 494.3 meters, featuring 457.4 meters at 1.65% Li2O & 36.9 meters at 1.65% Li2O, marking the widest continuous spodumene pegmatite interval drilled by the company to date.
  • Additional significant mineralization was intercepted outside the previously defined Exploration Target boundaries in drill holes CS25-063 & CS25-065.
  • Infill drilling required for the initial Mineral Resource Estimate is expected to be completed in the coming weeks, with the estimate anticipated for release in Q1 2026.
  • Four drill rigs operating on the project are scheduled to pause operations in mid-December & resume in early January.
  • The current Exploration Target estimates 215 to 329 million tonnes at a grade of 1.0 to 1.38% Li2O, based on the first 40 holes drilled.
  • Sampling & analysis were conducted by SGS Canada using NQ diamond drilling, with QA/QC protocols including 5% quartz blanks, certified reference materials, & duplicate splits.
  • Neil McCallum, Vice President of Exploration, serves as the Qualified Person who reviewed & approved the technical information in this release.
  • Company representatives are currently attending the Mines & Money Resourcing Tomorrow conference in London, UK.