newsfilter
← Latest News
GlobeNewswire·

Q2 Metals Reports Final Winter Assays with Intercept of 137.6 Metres Grading 1.47% Li₂O, Including 40.6 Metres at 3.25% Li₂O at the Cisco Lithium Project in Quebec, Canada

Highlights: CS25-083: three (3) separate intervals, including 73.5 m at 1.34% Li2O;CS25-086: 10 separate intervals, including 50 m at 1.58% Li2O;CS26-087: nine (9) separate intervals, including 46.9 m at 0.97%