newsfilter
← Latest News
GlobeNewswire·

Q2 Metals Reports Multiple Wide Intercepts, Including 264.6 Metres at 1.84% Li₂O and 152.9 Metres at 1.59% Li₂O in Drill Hole 71 at the Cisco Lithium Project in Quebec, Canada

Highlights: CS25-071: Six (6) separate intervals, including: 264.6 m at 1.84% Li2O; and152.9 m at 1.59% Li2O CS25-074: Three (3) separate intervals, including: 202.7 m at 1.58% Li2O; and96.8 m at 1.64% Li2O CS26-077: