newsfilter
← Latest News
GlobeNewswire·

Q2 Metals Reports Multiple Wide, Mineralized Intercepts at the Cisco Lithium Project, Including 272.5 Metres at 1.61% Li20

Highlights: Three (3) drill holes from the 2025 drill program with strong analytical results are reported herein: CS25-036: nine (9) separate intervals, the widest being 272.5 m at 1.61% Li2O. CS25-038: 17