newsfilter
← Latest News
GlobeNewswire·

Q2 Metals Reports Multiple Wide, Mineralized Intercepts from Infill Drilling at the Cisco Lithium Project, Including 95.1 m and 81.9 m each Grading 1.56% Li₂O

Highlights: Four (4) drill holes from the 2025 infill drill program with strong analytical results are reported herein: CS25-040: 12 separate intervals, including 95.1 metres ("m") at 1.56% Li2O, 81.9 m at 1.56% Li2O