DynaResource — Q3 2026 Earnings Summary

  • Financial Performance:

    • Total revenue for Q3 2026 was $10.1 million, a decrease from $14.1 million in Q3 2025 and $11.4 million in Q2 2026.
    • Net loss for Q3 2026 was $4.4 million, compared to a net income of $1.3 million in Q3 2025 and $0.6 million in Q2 2026.
    • Adjusted EBITDA for Q3 2026 was negative $1.4 million, down from $1.5 million in Q3 2025 and $0.04 million in Q2 2026, marking the third consecutive quarter of negative adjusted EBITDA following six positive quarters.
    • Gross profit for Q3 2026 was $130,022, significantly lower than the $2.7 million recorded in Q3 2025.
    • Operating cash flows before changes in non-cash working capital items were negative $248,503 for Q3 2026, compared to negative $5.7 million in Q3 2025.
    • Cash flow used in operating activities was positive $5.4 million for Q3 2026, contrasting with negative $7.4 million in Q3 2025.
    • Total operating expenses for Q3 2026 were $9.9 million, down from $11.4 million in Q3 2025.
    • Nine-month revenue through September 30, 2026, was $39.5 million, down from $43.7 million in the same period of 2025.
    • Nine-month net loss through September 30, 2026, was $1.3 million, compared to a net income of $2.4 million in 2025.
  • Guidance and Future Outlook:

    • The full-year 2026 production outlook remains uncertain, contingent on the successful transition to a single underground mining contractor and continued operational improvements.
    • The transition to a single underground mining contractor is anticipated to take 3 to 9 months to complete.
    • The 2026 target for the process plant is to achieve a processing rate between 750 to 800 tonnes per day (tpd); the average for the first nine months of 2026 was 731 tpd.
    • Ore bodies expected to remain main contributors to production in the year ahead include San Pablo Sur, San Pablo, La Mochomera, Palos Chinos, and Tres Amigos.
    • Planning for a third tailings storage facility is advancing, with environmental and geotechnical surveys completed in Q3 2026 and the permitting process underway.
  • Business Segments and Product Lines:

    • Gold production in Q3 2026 was 3,417 ounces, down from 4,830 ounces in Q3 2025 and 3,703 ounces in Q2 2026.
    • Milled throughput in Q3 2026 was 62,283 tons, down from 62,741 tons in Q3 2025 and 67,347 tons in Q2 2026.
    • Head grade for Q3 2026 was 2.39 g/t gold, down from 3.39 g/t in Q3 2025 and 2.45 g/t in Q2 2026.
    • Gold metal recoveries averaged 71.17% in Q3 2026, up from 70.50% in Q3 2025.
    • A new gravity concentration circuit utilizing three Falcon concentrators is performing as designed, recovering approximately 26% of gold in a specific gravity concentrate with an average grade of ~300 g/t Au.
    • Tres Amigos provided approximately 53% of process plant feed in Q3 2026, with new ore drives accessing high-grade free gold occurrences.
    • La Mochomera provided approximately 34% of process plant ore feed in Q3 2026, with development intersecting the high-grade "532 Vein."
    • San Pablo and San Pablo Sur deposits provided approximately 13% of process plant feed in Q3 2026.
    • Mine development completed 2,034 meters in Q3 2026, down from 3,013 meters in Q3 2025, due to the termination of one mining contractor.
  • Market and Competitive Landscape:

    • The company operates the San Jose de Gracia (SJG) Mine in the Sierra Madre Occidental belt in Sinaloa, Mexico.
    • The company is actively working to resolve an ongoing matter with tax authorities.
    • The company has improved security measures regarding the handling, processing, and transportation of gold-bearing material and concentrate to reduce unauthorized removal or loss.
  • Risks and Challenges:

    • Q3 2026 results were impacted by lower grades, increased dilution, and unusually heavy seasonal rainfall.
    • The transition to a single underground mining contractor faces challenges, including the contractor's difficulty recruiting experienced miners in Sinaloa.
    • Approximately $4.9 million of the Company's cash was classified as restricted in connection with the ongoing tax authority matter.
    • Planning for a central Raise Bore ventilation shaft was cancelled due to unfavorable geotechnical conditions.
    • Forward-looking statements involve risks including fluctuations in currency markets, commodity price volatility, changes in government regulations, labor disputes, and operational hazards.
  • Management Commentary and Tone:

    • President & CEO Rohan Hazelton stated that while operational challenges remain, improvements are strengthening the foundation for consistent production and sustainable long-term value creation.
    • Management highlighted a meaningful reduction in reported safety incidents and the successful implementation of additional security measures in September 2026, which resulted in improved grades with daily averages remaining above 3 g/t gold.
    • The decision to terminate one underground mining contractor was described as difficult but necessary, leading to a significant decrease in total project manning and safety incidents.
    • Management expressed confidence in the new gravity circuit and the ongoing optimization program aimed at increasing process plant throughput and recoveries.
  • Other Key Points:

    • A new tailings dam was completed in Q3 2024 with a storage capacity of 670,751 cubic meters; the third stage is in use, and the fourth stage is planned.
    • A Community Participation Committee was formed, and activities included road maintenance, school visits, and the construction of a potable water plant for local residents.
    • Mine ventilation was enhanced by connecting the Mochomera and San Pablo Sur mines, resulting in improved working conditions and faster re-entry times.
    • The company is evaluating cost-effective strategies to utilize an additional 50 wet tons per day of processing capacity.
    • Gold concentrate sold (2,718 ounces in Q3 2026) differed from gold produced due to shipment timing, payability discounts, and assay adjustments.