Congressional Forum - Arecibo Observatory
Jennifer González Colón, Michael Waltz, Franklin Lucas, Brian Babin, John Abruzzo, Luis Quintero, Allison Smith, Carlos Padin, Robert Smith
Hearing, Panel, Statement
- The US STEM workforce faces a projected deficit of one million jobs over the next decade, driven by participation rates of 27% for women and 10 to 11% for minorities, while federal law and state legislation currently preclude US science staff from collaborating with China, forcing some users to seek time at China's FAST telescope through a process requiring a Chinese national.
- Concerns exist that if the US falls to second place in space capabilities, it risks becoming "number two or less" globally, a scenario exacerbated by China currently possessing the world's largest fully operational single-dish radio telescope, a capability the US no longer holds.
- The NSF aims to resume the mission of the Angel Ramos Foundation Science and Visitor Center, which previously hosted over 85,000 annual visitors, while expecting over 100 applications for the next year's Star Academy with 35 students already selected.
- Short-term operational goals include renovating the electronics department's instrument by 2023 using hurricane Maria relief funds, expanding the 12-meter antenna's frequency coverage with a cryo-cooled receiver, automating data-taking processes, and potentially increasing observation nights from four to six times per year as conditions permit.
- Medium-to-long-term concepts for a next-generation telescope, supported by over 3,000 endorsements, describe a "revolutionary leap forward" with over four times the power of current planetary radars and 250% increased sky coverage, expected to provide up to seven months of warning for hazardous asteroids and enable the detection and habitability studies of exoplanets in the coming decades.
- Proposed specifications for the new facility include capabilities to monitor millimeter-sized space debris in Earth orbit and meter-sized stationary debris in cislunar orbit, as well as potential reuse of the existing 305-meter telescope's remaining parts to reconstruct HF facilities, an incoherent scatter radar, or install a low-frequency receiver.
- Rough order of magnitude estimates place the cost of the proposed next-generation telescope in the range of $500 million, with a timeline of 20 to 30 years if following the standard National Science Foundation MREFC process, or four to seven years if immediate funding bypasses the standard decadal survey process.
- The NSF expects to review proposals for future Arecibo activities developed through recent workshops or independently, intends to partner with Puerto Rico and congressional appropriators for the region's future, and plans to conduct a full-scale test of a socket and rope assembly at Lehigh University with details to be announced later.
- A draft of the investigation report is scheduled to be provided to the agency in September, while Dr. Allison Smith anticipates combined data from Puerto Rico atmospheric records and a new ISR/HF will allow for a thorough investigation of global climate change characteristics.