newsfilter
← Interviews
House Committee on Energy and Commerce3h 21m

Where Are We?: Examining Positioning, Navigation, and Timing Capabilities in the United States

Brett Guthrie, Frank Pallone, Richard Hudson, Doris Matsui

Hearing
  • Military and economic sectors anticipate a persistent reliance on GPS for logistics and synchronization, necessitating increased resilience against adversarial jamming and spoofing observed in contested environments, including the risk of catastrophic economic failure from a GPS failure.
  • Russia and China are expected to continue developing space-based weapons threatening U.S. satellite constellations, while adversaries will persist in disrupting GPS signals.
  • The Air Force and Space Force will modernize GPS to enhance security and resistance to threats, with the Space Force canceling an overdue ground station program in April 2026 that triggered a critical software upgrade.
  • Eight of the 32 GPS satellites operate on a single string, creating a vulnerability where a single failure could render them non-operational, despite a space-based PNT industry comprising over 850 suppliers.
  • The FCC and federal agencies will continue evaluating complementary PNT alternatives, including terrestrial systems and broadcast infrastructure, through rigorous technical reviews to ensure consumer protection and adherence to the Communications Act.
  • The Broadcast Positioning System (BPS) will be deployed as a primary complementary solution by Merkit Solutions, utilizing high-power signals from diverse locations to resist jamming and functioning independently of GPS.
  • Merkit Solutions will seek Congress to accelerate BPS installation through funding for hardware, calibration, and operations, with NIST concluding in 2025 that BPS time transfer is comparable to or better than GPS.
  • Local broadcasters will continue rolling out ATSC 3.0 to enable TV towers to assist with location determination, while the FCC works to complete the transition necessary for BPS integration.
  • NextNav will expand its vertical location service for high-rises in over 4,400 cities and deploy horizontal solutions on 5G infrastructure in the 900 MHz band, operating at no cost to taxpayers.
  • NextNav plans to modernize 900 MHz band rules to allow technical advancement, while working with the FCC to address stakeholder concerns and ensure coexistence with unlicensed users in the 902-928 MHz band.
  • The lower 900 MHz band will remain critical for first responders, medical alerts, smart devices, and agricultural efficiency, with the CTA noting between 40 and 60 complementary PNT technologies are available or in development.
  • Commercial entities including Iridium, TrustPoint, and Zona will continue operating in the low Earth orbit (LEO) PNT market, with TrustPoint targeting C-band signal transmission by 2027 and Zona developing signals closely aligned with GPS.
  • The energy grid will maintain reliance on precision timing for flow alignment and fault deployment, with BPS projected to provide the same or better performance than GPS for this sector during weather emergencies.
  • Congress is expected to support innovation and funding for PNT resilience, including designated lead agencies and financial resources for traceable time stations, while the government pursues a market-driven approach to complementary PNT.
  • Future PNT systems will incorporate privacy by design to prevent mobile devices from acting as surveillance tools, with the government leading a responsible transition to a more resilient architecture.
  • Federal agencies will dedicate resources to resolving localized jamming and spoofing in aviation and maritime industries despite federal prohibitions on marketing or selling jamming equipment.
  • The Department of Energy's Tribal Nation Transmission Program will continue advising tribal nations on electrical grid management, while broadcast infrastructure remains a reliable asset with 24/7 operation capabilities and hardened facilities.