Q3 2026 FINANCIAL AND OPERATIONAL RESULTS WEBCAST - FORTUNA MINING CORP
Good day, everyone, and welcome to the Fortuna Mining Corps Third Quarter 2026 Financial and Operational Results Call. At this time, all participants are placed on a listen-only mode, and we'll open the floor for your questions and comments after the presentation. It is now my pleasure to hand the floor over to your host, Carlos Baca, Vice President, Investor Relations at Fortuner Mining. Sir, the floor is yours. Thank you, Matthew. Good morning, everyone, and welcome to Fortuna Mining's third quarter 2026 Financial and Operational Results Conference Call. Joining today's call on behalf of FortunA are José Alberto Ganosa, Chief Executive Officer, Director, and Co-Founder, Kevin O'Reilly, Chief Financial Officer, César Velasco, Chief Operating Officer, Latin America, and David Whittle, Chief Operations Officer, West Africa. Today's webcast presentation and Q3 2026 results materials are available on our website at fortunamiain.com. Before we begin, please note that the statements made during today's call are subject to the reader's advisories included in yesterday's news release, the webcast's presentation, our management discussion and analysis, and the risk factors outlined in our annual information form. All financial figures discussed today are in U.S. dollars unless otherwise stated. The technical information discussed on this call has been reviewed and approved by Eric Chapman, Fortuna's Senior Vice President of Technical Services and a qualified person as defined under National Instrument 43-101. Today's remarks will provide a concise overview of our third quarter results and the priorities guiding the business through the balance of the year. With that, I'll turn the call over to Jorge Ganosa. Thank you, Carlos, and good morning to all, and thank you for joining us. During the third quarter, we made significant progress on the growth projects that underpin Fortuna's next phase of growth, led by the Seguela plant expansion and the Ambasud construction. We're positioned to deliver approximately 60% growth in annual gold production to the level of roughly half a million ounces per year, starting from mid-2028. This growth comes from projects that we control, ounces already in our mineral inventory, supported by technically straightforward development plans, proven teams, and the financial capacity to execute. Operationally, the quarter was marked by production shortfall at Orseguela Mine in July and August. These operating issues were contained within the quarter, and the corrective measures and actions taken by management have already delivered improved execution. Our priority is to sustain consistent operating performance while delivering this growth for shareholders. First, a word on safety. We recorded one lost time injury at our Seguela mine in July involving a light vehicle accident. Our year-to-date total recordable injury frequency rate as of September 30 was 1.23, below our corporate target of 1.37. I want to commend our teams at Cayoma and Lindero for achieving 1,950 days and 1,080 days respectively without lost time injuries. That's basically close to five and three years lost time injury free. Their performance demonstrates that sustained commitment to safety we seek across all of operations our responsibility remains unchanged ensuring that everyone goes home safely we produced 69 665 gold equivalent ounces in the third quarter and remain on track to meet our annual production guidance in the range of 281 and 305 000 ounces financially adjusted Adjusted EBITDA of $165 million and adjusted atributable net income of $51 million or $0.17 per share. Both were lower than in the previous quarter, reflecting lower sales and lower volumes. Realized metal prices, higher costs, and higher share-based compensation. The latter was a non-cash expense driven by the 24% rise in our share price during the quarter. Despite these pressures, the Seguela shortfall, production shortfall we generated $90.8 million in free cash flow from ongoing operations. Through the first nine months, Fortuna generated $954 million in sales, $585 million in adjusted EBITDA, and $350 million in free cash flow from ongoing operations. Adjusted achievable net income was approximately $238 million, or $0.79 per share. This cash generation is the financial foundation for the growth program I'll now discuss. We're focused on delivering on our next phase of growth. So at Seguela and Dian Basud, we're moving that strong growth strategy forward through concrete execution milestones. Engineering and procurement are advancing for the approved Seguel expansion, while at Dian Vasud, We're progressing the remaining approvals and preparing for construction. At Seguera, we made a final investment decision in July for the $109 million plant expansion, which will increase processing capacity by 30%. Completion and commissioning are scheduled for the third quarter of 2028, targeting an annual production capacity of over 200,000 ounces of gold at this mine. At the ambassadorship, the government has issued on November 2nd the important notice of admissibility, confirming that the government has reviewed our application for the exploitation permit and all documentation met the legal requirements for the approval process. Legal and technical requirements for approval process we expect to obtain the exploitation permit in the fourth quarter. Mining Convention negotiations are also in the final stages with the Convention adopting the 2016 Mining Code alongside provisions that will be stabilized for a decade. We are advancing preparations to secure the project schedule targeting first gold in mid-2028. To support the schedule, the Board of Directors has authorized management to proceed with contract awards totaling $250 million dollars with execution spread across the construction timeline. We are also working with the Office of the President of Senegal and the Office of the Minister of Mines to arrange an on-site ceremony marking the formal start of construction in late November. The large and prospective Bambadji concession adds further exploration upside to our Senegal platform. The acquisition closed during the quarter for $206 million. This is a property we acquired from and we have already mobilized six drill rigs which are conducting in-field programs across the Caddy West, Wadi, and Latifa prospects. Our immediate focus is to produce the first resource estimate for Caddy West by year-end. This prospect is located just two kilometers from the plant at the the Ambasud plant site. We entered this investment phase or growth projects with a strong balance sheet. At the end of September, we held $443 million in cash, close to $600 million in total liquidity, and a net cash position of $260 million, down approximately $160 million from the previous quarter. declines in net cash coming primarily from the BAMBAGI acquisition. Over the next two years, we expect to invest approximately $750 million in growth and mineral exploration for available liquidity and free cash flow from the business position as well to fund these programs without issuing additional shares or over-leveraging or balancing. This is growth designed to benefit and add significant value to our shareholders backed by a clear funding plan. We did not repurchase shares during the third quarter. Year to date, we have returned $106 million to shareholders through the repurchases of 10.8 million shares. As we launch the growth capital projects and advance on their execution, we will pause share buybacks. Growth is our first capital allocation priority, followed by shareholder returns through opportunistic buybacks while preserving balance sheet strength. We will assess opportunities to resume repurchases against project funding needs and available liquidity. As we move through the fourth quarter, our growth projects and exploration programs are gaining significant momentum. We look forward to reporting further milestones achieved as we advance the projects while maintaining the operational and financial discipline that underpins our production and business. With that, I'll turn the call over to Kevin, our CFO, to take us through the highlights of the quarter thank you all right starting with the income statement adjusted the trivial net income for the quarter was 51.2 million or 17 cents per share in line with the 51 million in the third quarter of 2025 and down 47 from the 75.5 million in the second quarter of 2026. quarter over quarter the key change i want to highlight for net income is the impact of non-cash costs, specifically depreciation, depletion, and share-based compensation. Depreciation and depletation increased to $866 per ounce, compared to $609 per ounce in the prior quarter. This draws an increased cost of $15 million. Higher depletions was primarily due to planned mining sequencing at Segala and Lendero as we saw greater amortization of previously capitalized stripping costs. This trend is expected to continue in the fourth quarter as Segala continues to source or from the Ancien and Kula Pits. The other major non-cash charge was share-based compensation expenses of $10.9 million in the third quarter compared to recovery of $0.3 million in the second quarter due to a 24% rise in the share price and the associated mark-to-market adjustments. The impact of non-cast costs in the quarter helps to explain adjusted earnings per share of $0 points of $17 compared to relatively robust operating capital per share of $0.43. Looking at the other parts of the income statement, sales are lower quarter-per-quarter due to lower production and a lower realized gold price of $4,281 per ounce versus $4447 per ounce in the second quarter. Cash costs were higher as well over quarter-for-quarter due to higher protesting costs in Lendero from higher consumption of cyanide to improve leach kinetics and rental costs and higher weights movement to gala but partially offset by lower royalties a foreign exchange loss of 2.5 million in the quarter was primarily driven by purchases of u.s dollars to repatriate funds from argentina and the effective tax rate of 47 percent was broadly in line with the previous quarters with the factors affecting our effective tax rates being those discussed in our second quarter update namely deferred tactic rules in argentina in withholding taxes Cash costs increased to $1,244 per gold equivalent ounce from $1.034 in the second quarter. Consolidated ASIC with $2,286 for GEO, up $129 from $2.157 in the previous quarter. Quarter over quarter, the increase primarily reflected lower production at Tagela, which would normally contribute lower cost ounces, and higher share-based compensation of $10.9 million compared to the recovery we mentioned in the second quarter. Share-based Compensation on its own contributed $160 per geo to the increase in ASIC. When we look at ASIC in the quarter compared to our guidance, I want to emphasize the continued impact of external factors. Relative to the assumptions underlying our annual guidance, external factors added $220 per geo of the third quarter ASIC, This primarily reflected $116 from share-based compensation, $42 from higher consumable prices, mainly diesel, and $45 from macroeconomic factors impacting pay-to-denominate costs at Lendero. The temporary stoppage at the gala also contributed approximately $45 per geo to ASIC. Looking at consumable, similar to our peers, we've been seeing inflationary pressures in the cost of consumables and materials. However, the impact to our cost structure has not been experienced equally across all of our sites. Inflationary pressures have been the most acute at Linder, where diesel makes up around 10% of cost for mobile equipment and power generation. Relative to the assumptions or guidance, they think diesel costs increased in the range of 60%, and explosives have been another factor at around 30% increases relative to guidance. Inflations have been more muted at Sagela, where government price controls over diesel have limited the increase in fuel prices, but we have seen some pressures in mining costs, where rise and fall with our mine contractors has increased through the year. In the quarter, looking at inflationary pressures, about $42 an ounce, Lindero accounted for roughly 85% of that, and Seguela the other 15%. We expect ASIC to trend down in the fourth quarter, as Seguera moves past its third quarter issues, and Lindero maintains its performance. However, due to the external factors we've discussed, we still see an ASIC that tracks above the top end of our guidance by about 5%. Stepping back and looking at the full year, the impact of persistent diesel price pressures, high royalty costs, and macroeconomic impacts in Argentina are expected to push us 8% to 10% above the Top End of Guidance. If we stripped out the impact external factors, ASIC would finish the year at or just above the Top end of guidance of $1,975 an ounce. Moving to cash flow, despite the challenges we faced in the quarter, the business continued to demonstrate the ability to generate cash flow with $90.8 million in free cash flow from operations and $126.7 million, or $0.43 per share, in net cash from operating activities before working capital changes. Free cash flow from operations increased from the $85.7 billion in the second quarter, primarily due to the timing of tax payments at Segala and lower sustaining capital expenditures. In the fourth quarter, we do expect sustaining capital expenditures to trend back up to around $30 to $34 million, and we also expect higher growth capex as work continues to advance at the AMBO, SUD, and FIGAIL expansion. To finish off and look at our balance sheet, echoing Jorge's earlier comments, we see ample capacity to fund our $750 million growth program over the next two years, based on a strong liquidity position of just $160 million, underpinned by a robust business with a generated $350 million in free cash flow year-to-date. This provides a platform that allows us to organically fund our growth and support a target of a 60% increase in annual production by mid-2028. Back to you, Jorge. Thank you, sir. David, please do give us an update on the West African business. Thanks, Jorge, before turning to our operating results, want to reaffirm that the safety and well-being of your employees and contractors remains our foremost responsibility our focus is on managing critical risks reinforcing safe work practices and ensuring that effective controls are consistently applied across all our operations and projects at segala third quarter operations were affected by a temporary site-wide stoppage caused by a blockade by artisanal miners in early July and by reduced equipment availability of one of our mining contractors. These disruptions reduced mining volumes and limited access to higher grade areas within the pits. We implemented several initiatives to address these issues and mining volumes were back to planned levels in September. Mining was primarily carried out at the the Antenna, Ancien, Pooler, and Sunbird pits with 6.5 million tons of waste and 340,000 tons of ore mined for a split ratio of 19.1. A further 623,000 tons of wastes were also mined at the Sunbird South to provide access to the underground portal area. Tegela produced 33,744 ounces of gold per quarter, processing 402,000 tons at an average grade of 2.67. Lower metallurgical recoveries associated with the Kula oil feed have been addressed, with the recoveries returning to previous levels in October. Tagela reported a cash cost of $947 and an oil in sustaining cost of $1,917 per ounce of gold for the quarter. New to date cash cost and ASIC stand at $754 and $1807 per ounce of gold respectively. In mining volumes access to higher grade oil and recoveries restored we expect a strong finish to the year and a return to first half production levels in the core quarter together remains on track to achieve the lower end of its 2026 production guidance during the quarter we also made significant process progress on all three of our major growth projects in the region and together we received the environmental permit for the underground project and submitted all requested documentation to support the mining permit application. This application has now been referred for ministerial approval and permitting remains on track for completion this year. The project team has been recruited, orders for mining equipment have been placed and development remains on schedule to begin in the second quarter of 2027 the significant expansion of the segala processing plant was approved and is progressing on schedule detailed engineering is underway with light podium we designed and constructed the existing plant and the owners project team is 75 on board vendors have been selected for key equipment and infrastructure packages and work on supporting infrastructure has begun in senegal early works continued at the ambassador the owner's construction team is fully onboarded with its core largely from the team that built together on time and on budget the site access road is complete and construction of the 329 person accommodation count is progressing with completion scheduled for the first quarter of 2027. Senate has been selected as the project's EPCM contractor and has received a limited order to proceed with all the works. Orders have been placed for long-lead mechanical equipment, including the sag bill and primary crusher, protecting the overall project schedule. Manufacturing of the HFI power station generators continued, while the LF5 generators have passed factory acceptance, testing, and ending ship. The process plant and power station EPCM contracts and the awarded bulk authorised packages total $250 million for about 60% of total project capex and are ready for execution upon the final investment decision. This positions us to move swiftly from early works into full construction, subject to the receipt the exploitation for me to comply on board approval. With regard to exploration then Jorge has already touched on the Bambadji acquisition. Exploration also continued at the ambasad with drilling at Southern Arc continuing to deliver positive results outside the current designs. These results will inform our year-end level resource and then we'll reserve it. At Segala after a highly successful building campaign at sunbird underground and kingfisher the drill rigs have been reallocated to the underground potential at pantheon southerly extensions of antenna and additional generative targets supported by a solid mineral reserve and memory resource base the amber certain cigar from the production foundation for West Africa platform. Together, these assets underpin Fortuna's target with approximately 60% growth in annual production to an annualized rate of 500,000 ounces of gold equivalent from mid-2028. With that, I'll hand back to you yourself, Olaji. Thank you. Thank you. Thank you, Cesar. Do you want to share your performance on Latam, please? Yes, indeed, thank you, Jorge, and good afternoon, everyone. In Latin America, as Jorge has indicated before, both Lindero and Cayoma continue to deliver solid safety performance during the third quarter. Moving to the operational results, in Argentina, Lindero produced 26,000 ounces of gold, a 25% increase over the second quarter. This is consistent with our expectation that production would be weighted towards the second half of the year. Production for the first nine months totaled 68,400 ounces. The operation remains on track to achieve annual production guidance of 92,000 and 102,000 ounces. The quarter's performance reflected the operating improvements anticipated following the primary crusher reliability work completed earlier in the year. Lindero placed approximately 1.9 million tons of ore on the leach pad, about 19% more than in the second quarter, at an average coal grade of 0.63 grams per ton. This represented approximately 37,800 contained gold ounces placed on the TAS and 18% increase quarter over quarter. The improvement was driven by higher mechanical availability across the processing circuit and stronger crushing and stacking rates. During the first nine months, Lindero placed approximately 99% of the gold ounces planned for the period on the leach fat. This performance, together with the normal timing of leach-fat recovery, supports our expectation of stronger production for the remainder of the year. Cash cost was $1,449 per ounce of gold, slightly lower than in the second quarter, while ASIC decreased 18.5% quarter over quarter. The diminution in ASIC primarily reflected higher production, lower sustaining capital expenditures and the absence of the concentrated crusher related expenditures recorded in the second quarter external cost pressures and microeconomic factors on these as indicated by Kevin including appreciation of the Argentine peso and higher diesel and explosives costs continue to partly offset the benefits of improved plant reliability higher stacking rates and increased coal production. Exploration and resource development at Lindero also delivered encouraging results. The 2026 infill drilling program was expanded from an initial 6,000 meters to 8,500 meters across 31 diamond drill holes after several early holes encountered higher than expected mineralization. Results included 0.96 grams per ton of gold over 350 meters in whole LDH 272 and confirmed that mineralization extends below the current reserve PIT design. An updated blood model and PIT design are targeted for completion by year end, supporting a revised life of mine plan and updated mineral resource and mineral reserve estimates planned for the first quarter of 2027. Moving to Peru at Cayoma, throughput remained consistent while higher silver grades and recovery drove strong production. Silver output rose 7% quarter over quarter to 247,400 ounces. Lead production reached 8.4 million pounds and zinc production total 11.4 million pounds. Gold equivalent production increased to 9,900 ounces bringing year-to-date output to 28,900 gold equivalent ounces. Cayoma as you can see is well positioned to exceed its annual guidance of 29,000 to 33,000 gold equivalent ounces. Costs remained contained. Cash costs declined to 26.12 per silver equivalent ounce, a 6% decrease quarter over quarter, while ATIC decreased to $43.19 from 44.90 despite higher treatment charges and capital spending. The tailings number three expansion was 71% complete as of October 31st and remains on schedule for completion by year end. Back to you, Jorge. Jorge Mancilla- Thank you, and we can move on to Q&A. Certainly. Everyone at this time will be conducting a question and answer session. If you have any questions or comments, please press star 1 on your phone at this time. We do ask that while posing your question, please pick up your handset if you're listening on speakerphone to provide optimum sound quality. And once again, if you have questions or any comments, press star one on your phone. Please hold while we poll for questions. Thank you. Your first question is coming from Eric Windmill from Scotiabank. line is live oh hi there uh horgan team thanks for taking my question uh just uh wanted to ask about babaji obviously it's great to see the resource coming out on cabi west uh end of this year uh any thoughts uh in terms of some of the other targets and the timing we might expect there on the drilling and then i guess maybe the secondary question uh you know uh what about exploration ongoing here at DiEMBA as well. Thank you. Eric, yeah, we as noted through the call, we have been quite prompt to mobilize drill rigs. We're basically done with their drilling at CAVI West and our Our rigs, we have five core drill rigs and one RC working on the property. So the rigs have moved from Cabi West to Wadi and Latifa, which are the next targets on our priority list. These are targets that have received prior drilling by Barrick over the years, and we're basically in some cases infilling and pursuing open ends of mineralization outlined by that previous Barrick drilling, right? So lots of work ahead. But the focus is for us to be able to show ounces soon. This was a significant acquisition, and as you know, there was no mineral inventory reported. It is through our assessment of the drilling dam that there is a lot of low-hanging fruit to produce ounces quickly, and that is what's mobilizing us. So CAVI-West first, Wadi, Latifa second, and the team continues moving and generating dual targets. There are at least eight priority areas identified for first path. So CAVi-West, Wady, and Latifa are the first three, and then we'll move, continue prioritizing. So lots of work, and that's for Bambadji Drill Program. We approved an initial $8 million for this fourth quarter, and we will certainly be looking forward to a very substantial exploration budget for 2027. With respect to, I understand, Seguela drilling, I think David mentioned we are done drilling Sandberg. Sandberg has been very rewarding for the company. We have built Sandberg over the last two years into our largest resource reserve at Seguera, a million ounces of gold between the open pit and underground mineralization remains wide open at depth but it's deep so we are making a pause now mineralization remain open at depths in excess of 900 meters to a kilometer from surface with very good at grades very high grades but it is inefficient to continue drilling from surface so we'll wait for the underground infrastructure to be developed in 2027 to go back and start drilling from underground. So drills are moving out of Sandburg into other targets that we have there. As you know, we have multiple targets as well. We have a large property package. We control 35 kilometers on the belt where we have multiple targets to test. So the focus at Seguela is advancing some of those early stage targets that we have, but also pursuing open mineralization on some of the existing pits, but pursuing opportunities for underground mining. We will now have an underground anchor for underground operations at the Sandberg deposit, And that will allow us to be able to tackle perhaps smaller resources that we can mine underground at some of the other nearby deposits like Ancien, even Antena, even Cula. So right now we have some rigs testing new targets and some others exploring for deep extents of mineralizations below our pit bottoms with the idea of producing resources that we can mine from the underground. So that's the focus for Segeo. Okay fantastic thank you really appreciate the detail there and maybe just one more if you don't mind but just on the buybacks, do you have sort of internal thresholds or thinking about what you want to see in place on the balance sheet before you get more aggressive and resume the buy backs? With the buybacks, as you know, we are starting a very capital-intensive phase. As noted through the call, we're going to start deploying over the next two years. We're going deploy close to $750 million on our growth projects and exploration. So we want to be cautious. We want to being cautious. So in the fourth quarter, Q1 2027, Q2 2027 you'll see us being cautious with the share buyback or priorities, ensuring that we can fund the growth organically and at the same time preserve the strength in our balance sheet. And as we advance with the deployment of that capital and looking at go prices and the performance of the business over the next two, three quarters, we will certainly reengage in our share buyback program. But more than a set target today on an amount of shares, what's driving our decision is just to be cautious as we initiate the capital deployment or the more significant portion of the capital deployment and prioritizing that and managing, balancing that with retaining a strong balance through the capital phase, right? So, we will always be opportunistic with the shared buybacks, but I think we'll be particularly cautious over the next two quarters, I would say, at the very least, with the share buybacks. Okay, great. Thank you. I really appreciate that. And, yeah, it sounds like lots of exciting developments to come. I look forward to seeing the news all up back in the queue. Cheers. Thank you, and once again, everyone, If you have any questions or comments, please press star, then 1 on your phone. Your next question is coming from Mohamed Fadibi from National Bank. Your line is live. Good morning, Jorge and Tim, and thanks for taking my question. Maybe if I could start at Ceguila. I just wanted to get a little bit more color on the site-wide stoppage you mentioned from the blockade by Artisanal Miners. Can you give us some colors on what triggered this and now that you're back and producing, what has changed with, I guess, the local community or maybe the authorities to kind of reduce this risk in the future? Thank you. Well, on July 10th, a police task force, that's a national task force to combat illegal mining carried out an operation in the village of Cuego. Cuego is located a couple kilometers from our mine site, and it's a village that hosts a large population of migrant artisanal miners. And as I said, the government of Cote d'Ivoire has a national task force, police task force to combat, not necessarily artisan mining, but illegal mining, no? And they had this operation carried out in the village of Cuego, which unfortunately resulted in a fatal shooting. This triggered a protest by the artisanal miners at Cuego, who mobilized to our site and vandalized the entrance of our plant site, entered parts of our premises, and blockaded access for approximately 24 hours before the gendarme dispersed the blockade. with good judgment then delayed personal rotations and partially demobilized the workforce while we we assessed the situation and resumed dialogue we were not informed by the police or or authorities of these, you know, in operations they were carrying in Cuevo. So all of this came as a surprise to us, to be honest. Our priority, you knows, was the safe restart of operations and maintaining a healthy long-term relation with the artisanal mining community. We do not have any quarrels with the artisanal miners. There are no large artisan mining fields in the vicinity of our mine. There is a lot of scattered workings where you see anywhere between five and groups of five to 20 artisanal miners in relatively small digging, and our relationship all these years has been good, very manageable. So this was a bit of a surprise, and again, ignited by this operation carried by the National task force to combat illegal mining. So operations resumed and our total stoppage from the start of the blockade until when we resumed full operations, we were able to remobilize the demo workforce and continue with our normal rotations that was about six days down and after the incident so that's the color I can give you mom that is very helpful Jorge thanks a lot for that and that may be my second question on from Baji again you know good exploration update and we know we're getting an updated resource at our maiden resource at Cabo West a year and can you remind us in terms of you know integrating deposits from Bambadji into Diambasud like what it takes at the permitting level and how you're envisioning maybe at a high level how that could work out and any color there is appreciated I know that we remain at the early stages there but thank you yes what I can tell you is that we have already brought this up with the Minister of Mines because you know we We see Gambaji as one with the Diambasut. The Caviwes deposit where we look to produce this first resource is located only two kilometers away from the Diabasut plant site. So it just makes the world of sense to integrate everything with respect to the permitting and more importantly, the Mining Convention. So, we already brought this up with the Minister of Mines, and we are engaged in those discussions right now. So, but they do acknowledge the Minister of Mining in conversations I have had personally with him. He does acknowledge that Bambadji ore will be processed at the Diambasut plant. they we just need to make sure that we can get a proper alignment on something that makes sense for the long term uh and make the operation of the deposits in in both properties uh feasible and sensible right and and uh it's been raised with the authorities and we're working on it great thanks a lot for that caller and thanks for taking my questions Thank you. That concludes our Q&A session. I'll now hand the conference back to management for closing remarks. Please go ahead. If there are no further questions, we'll conclude today's call. Thank you for joining us and for your continued interest in and support for Fortuna Mining. We appreciate your questions and engagement and look forward to updating you on our progress next quarter. Have a great day. Thank you. Everyone, this concludes today's event. You may disconnect at this time and have a wonderful day. Thank you for your participation.
- Company
- FORTUNA MINING CORP
- Keywords
- FORTUNA MINING CORP